ML19246A688
| ML19246A688 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/25/1979 |
| From: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 7907060244 | |
| Download: ML19246A688 (1) | |
Text
Yk Lartv.
a s '4 S e
>~'
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET PHil. A D ELPlil A, PA.19101 121 N e 41 aboo
,,, gg
,, s y.'6, 1 ) l()
. < a r u e w ra m
?!r. Boyce 11. Cr i e r, Director Office of Inspection and Enforce. at E.gion I United c ated "oclear legulatory C
,I'sion 631 Park Avenue King of Prursia, PA 19406 SLBJECr:
Lir.erick Generating Station - Units 1 and 2 Docket :.o s. 50-352 and 50-353 I E !',ulle t in 7 8-12
" Atypical,leid 'f at or f al in Paactor Pressure Vetsel Welds" Enfer.or<:
Let t e r da t ed Sep t. mh. r 29, 1978 f ro:7 B.
Ik. Grier to V.
S.
oyer File:
GOVT l-1 (IE Bulletin 78-12)
Dear Mr. Grier:
This letter is in cor.plete resjonse to IE Bulletins 73-12,78-12A and 78-12B.
The L!rrrick V<
- el supplier, CBI, ins ce nieted a,. arch of records of low alloy, high tensile weld deposits used in all reactor p ren
- u re "e:,%e! s buil t in their or their suppliers facilities.
%ey have prepared a report of the results und have sum itted the port to the NRC on.ipril 24, 1979.
The CBI report certified that ther..
sere no deviatlous found for the Li erick No. I and 2 rr actor '.:
els.
Philadelphia Electric c c, pany lus ar-hive wid dc posit mat
- rial from t he t i me r i c'. ve-sels in ctorage, shc uld verification tents he required.
It is our um!. rs t an !ing f rom 'f r.
G. Uayne % 1:,uth of the ';RC that it is not ner.<uiry for To t o sut' 'i t a -; e p a r a t e cc>py of the CR[
report to the N r< C.
t Sincorely,
,$s > ' C,.
/' 5
/
./
J l' AT/ ra r l 0/ 8 repy to:
U.S. " vin
- 1 i t ' r y - alat.>ry Corni- ; ion
'u f o re-nt
- ff r
- t,,
3,,:
1-t*
1
'. n 'ih I n,.. t 51,
'D>)
790706049'
INTERIM REPORT Accession No. l%'Wo?A 5 Contract Program or Project
Title:
Water Reactor Safety Research-- Heat Transfer Highlights - February 1979 Subject of this Document:
RSR T'.onthly Progress Report Type et Occument:
Technical Report Author (s):
P. A. Lottes and others Cate of Document.
Feb IW 9
~.u.m,i
. _i s c Responsible NRC Individual and NRC Office or Division:
e Dr. Y. Y. Hsu, i'E3/RSR, Separate Effects Branch This document was prepared primarily for preliminary or internal use, it has not received full review and approval Since there inay be substantive changes, this document should not he considered final.
NlC hserch End Technical 7, t~ 31.,
i iv.2 i u u,
- Prepared for U.S. Nuc! ear Regulat.,ry Commission Washington, D.C 20555 INTERIM REPORT 298 30