ML19246A568

From kanterella
Jump to navigation Jump to search
Notifies That Review of Draft Evaluation SEP Topic IV-1. a for Factual Correctness Is Complete.Nrc Assessment Substantively Corect
ML19246A568
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/25/1979
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-04-01.A, TASK-RR NUDOCS 7907030378
Download: ML19246A568 (1)


Text

CONNECTICUT YANKEE AT O M I C POWER COMPANY BERLIN. CONNECTICUT P O BOX 270 H A RTF ORD. CONN ECTl ;UT 06 01 L

T E L E * ** O N E 203 666-6911 June 25, 1979 Docket No. 50-213 Director of Nuclear Reactor Regulation Attn:

Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

(1)

D. L. Ziemann letter to W. G. Counsil dated May 7,1979.

Gentlemen:

Haddam Neck Plant Systematic Evaluation Program (SEP)

Topic IV-1. A In Reference (1), the NRC Staf f transmitted to Ccunecticut Yankee Atomic Power Company (CYAPCO) a draft evluation of the above SEP topic and required that CYAPC0 review its factual correctness.

In response to that request, the CYAPCO review has indicated that the assessment is substantively correct.

We do, however, f eel it appropriate to clarif y the fact that the referenced technical report specificall y addressed st idy-state operation.

This report, in conjunction with other engineering evaluations which it ie been performed, confirms that three-loop operation is acceptable to 65% licensed thermal power.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY f

[/

j k'f',7.,- [ hf{/)'l if. G. Couiisil Vice President