Responds to NRC Re Violation Noted in IE Insp Repts 50-329/79-10 & 50-330/79-10.Corrective Actions:Fsar Change Notices Are in Process & Will Be Incorporated No Later than Aug 1979
ML19242D564
Person / Time
Site: Midland
Issue date: 06/29/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19242D554 List:
References
HOWE-191-79, NUDOCS 7908150418
Download: ML19242D564 (3)


Text

e Consumers Power g

g Stephen H. Howe'l Sensor Vnce 14essJent General Offices: 1945 West Pernell Road, Jack son, Michigen 49201 * (517) 788 4453 June 29, 1979 Ecve-191-79 Mr J G Keppler, Regionel Director Offica of Inspection and Enforcement US Nuclear Beguletory Cottission Region III 799 Roosevelt Boed Glen Ellyn, IL 60137 MIDLA'O NUCLEAR PLA?TT - NRC ITEM OF NONCOMPLIANCE II'3FECTION REPORT NO 50-329/79-10ANDNO50-330/79-10 This lett er, with its enclosure, is in response to your letter of June 6,1979 vhich trens itted the results cf your inspection of the Midland construction site on May lL-17, 1979 and which requested our written stetecent on the item of noncomplience.

,s.

79 0815 d(/8 3g ET9 csicaa

Enclosure qg, Hove-191-79 5

_ CON 3UMERS PO"ER COMPANY RE3PO T>E DESCRIliED III EC IIEP! CTICII REFORT NO ';O-3d# (9-13 A!D ID '23-3 3J/'(9-13-01 Inconsistencies in Decicn Basis Documents Ccncerning Material Specifications for the Prestressing System Description of Honco:clience Appendix A of Report Na 50-329/79-10 and 50-330/79-10 provides the followinC:

"10 CFR 50, Appendix B, Criterion III, requires, in part, thnt ceasures shull be established end executed to assure that regu-latory requirements end the design basis as specified in the license application for structures cre correctly translated into specifications, drevings, procedurer end instructions.

Also, it provides thct teosures shall be estsplished for the identification and control of design interft zca and for coor-dinctes econg participating design organications.

CPCo Topical Report CFC-1-A Policy No 3, Section 3.4 stctes, in part, 'the essigned lead design group or organization (ie, the N3SS supplier, A&E, supplier or CPCo) essare that designs and materials are suitable and that they comply with design criteria and reguletory requirements. '

CPCo is committed to ANSI U45 2 (1971), Section h.1, which states, in pcrt, 'reasures chell be estchliched end documented to assure thet the applicable specified design requirements, such as a design basis, regulotcry reqairements

. are correctly tranclcted into specifications, drawings, proced ures, or instruction. '

Contrcry to the above, measures did not assure that design basis s ere included in drevings end specificctions nor did they provide for the identificction end control of design interfaces.

As e result, tuo inconsistencies were identified in the license application end in other design basic documents.

Specific exemples are set forth belev.

a.

Construction specification C-2, Rev 11, dated November 16, 1978, Section 11.1 specifies caterial for prestreccing system cheathing to conform to ASTM A-366-66 or 66,'s2 gauge cold rolled carbon steel while FSAR Section 3.C.1.o.3 indicate the sheathing meterial to be meteriel meeting the requirements of ASZ4 A-53, Type E or S, crede B.

631034

2 b.

Construction specificction C-49, Rev 2, Secticn 6.2.2 specifies the chemical limitation on the corrossive protec-tive filler cateriel for the prcotressing systen to be 5 ppm for chlorides, nitrctes and sulfides while FSAR Table 3.8-25 indicates the maximum ellouable to bc 2ppra (chlorides),

hppm (nitretes) and 2pp= (sulfides). In additicn, the Inryco Qaclity Control ranuel requirec the meteriel chemical propertic; a be the some es FSAR Tcble 3.8-25."

Re spor.se FSAR Chance Notices to correct the noted deficiencies ere in process and vill be incorporated into the FSAR by emendment no lcter then August, 197?.

1. Specification Chenge Motice (C h9 033L) vill 'ce processed by July 6,1979 vhich vill chcnce the requirecents in the Specification to bc 2, 4 end 2 ppm for chlorides, nitret7s and stilfades, respectively.

A proprcr of re-review ves initleted June 25, 1979 of selected sections of the FCAR. The completion of this progrce is scheduled for the end of 1979 The review ectivity specifically looks for inconsistencies and/cr inaccurecies betveca secticnc of the FSAR cnd between the F3AR end design docume nt s.

a W

wRn 6/29/9 631035

.