ML19242D192

From kanterella
Jump to navigation Jump to search
Forwards First Interim Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel Co on Drywell Vent Structure & Reactor Pressure Vessel Pedestal.Final Rept to Be Forwarded by 791001
Date released: 09/13/2019 Download: ML19242D192


First Interim Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel Co on Drywell Vent Structure & Reactor Pressure Vessel Pedestal.Cracks Observed Near Weld Joints. Investigation & Repairs Underway
ML19242D205
Person / Time
Site: Hartsville Tennessee Valley Authority icon.png
Issue date: 07/05/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19242D205 (3)
Forwards First Interim Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel Co on Drywell Vent Structure & Reactor Pressure Vessel Pedestal.Final Rept to Be Forwarded by 791001
ML19242D191
Person / Time
Site: Hartsville Tennessee Valley Authority icon.png
Issue date: 07/05/1979
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242D191 (1)