ML19242C805
| ML19242C805 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 06/11/1979 |
| From: | Rouse L NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Nilson R SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| Shared Package | |
| ML19242C806 | List: |
| References | |
| REF-PROJ-M-3 NUDOCS 7908130599 | |
| Download: ML19242C805 (1) | |
Text
{
=
r-f[
[o, UNITED STATES y *)
s, g
NUCt. EAR REGULATORY COMMISSION 3 g[(
j WASHINGTON, D. C. 20555 8, *s
%, V /a J'JN 11 1979
+.+,=
Project M-3 Docket No. 70-1257 Exxon Nuclear Company ATTN: Mr. Roy Nilson, Manager, Quality Assurancc and Licensing 2955 George Washington Way Richland, Washington 99352 Gentic.ren:
The purpose of this letter is to transmit for your information an increment of the analysis of the effects of natural phenomena relative to your plutonium fabrication operation at Richland, Washington. The subject increment of analysis is the response of structures to earthquake hazard at your Richland, Washington plant. A draft of the enclosure has been reviewed, and commented upon, by those analysts who require the results to carry out suc-caeding analyses and by NRC staff. The NRC staff has endorsed this final version of the review for application in succeeding analyses. However, we will consider challenge of.our endorsement when supported by credible technical t,ases.
The enclosed increment of analysis, designated as Task II, presents methodology, basic data, and the restilts and conclusions of the study. Task I, which contains the st'ructural condition documentation on which the study is based, because of its bulk anc' highly technical content, has been given limited distribution. A copy is available in our offices for your inspection if you so desire.
Any comments on the enclosed analy',is should be addressed to W. Burkhardt of J. E. Ayer of thi", Branch. They will direct resolution of comments and any justifiable ' evision cf the analysis Sincerely, Y (4 & '
w)
Leland C. Rouse, Acting Chief Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and
~
Material Safety
Enclosure:
Task II
-c~~4 L 4 s U"."1.
7908130779
-=
.- -- -- -. -- - ---.