ITAAC Closure Notification on Completion of ITAAC C.2.6.12.02 (Index Number 672)
ML19242C725
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/30/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-1045
Download: ML19242C725 (6)


Text

Michael J. Yox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel AUG 3 0 2019 Docket No.: 52-026 ND-19-1045 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closure Notification on Completion of ITAAC C.2.6.12.02 findex Number 6721 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP)

Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item C.2.6.12.02 [Index Number 672]for verifying that a report exists and concludes that each as-built offsite power system circuit is rated to supply the load assumptions during normal, abnormal and accident conditions. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company(SNC)requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

'-fir W Michael J. Yox Regulatory Affairs Director Vogtle 3&4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC C.2.6.12.02 [Index Number 672]

MJY/JBN/sfr

U.S. Nuclear Regulatory Commission ND-19-1045 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney(w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE; VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Mr. W.Jones(w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Oalethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1045 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric ComDanv. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-19-1045 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1045 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC C.2.6.12.02[Index Number 672]

U.S. Nuclear Regulatory Commission ND-19-1045 Enclosure Page 2 of 3 ITAAC Statement Design Commitment:

2. Each offsite power circuit interfacing with the onsite ac power system is adequately rated to supply assumed loads during normal, abnormal and accident conditions.

Inspections. Tests. Analyses:

Analyses of the offsite power system will be performed to evaluate the as-built ratings of each offsite circuit interfacing with the onsite ac power system against the load assumptions.

Acceptance Criteria:

A report exists and concludes that each as-built offsite circuit is rated to supply the load assumptions during normal, abnormal and accident conditions.

ITAAC Determination Basis An analysis of the Offsite Power System circuit was performed to verify that each offsite power circuit interfacing with the onsite alternating current(ac) power system is adequately rated to supply assumed loads during normal, abnormal and accident conditions.

The as-built offsite power system for Unit 4 consists of three circuits. These circuits run from the switchyard facilities to the high side bushings of the Main Step-up Transformers and the Reserve Auxiliary Transformers A and B.

The manufacturer's ratings of the as-built equipment and conductors in each circuit were evaluated to determine the ampacity of the most limiting component at the maximum expected ambient temperature. The ampacity of the circuit was defined as equal to the lowest rated component.

The plant load assumptions are based on conservative values, which are greater than the maximum calculated loads for normal operating conditions, and bound the abnormal and accident condition loads. The plant loads are defined in the report "Assumed Loads During Normal, Abnormal and Accident Conditions," which is attached to Memorandum ND-17-1189 (Reference 1). The load values used to evaluate the adequacy of each offsite power circuit are converted from megawatts(MW)to megavolt amperes(MVA)for comparison.

The results of the analyses are provided in the report "Vogtle Unit 4 Offsite Power Rating Evaluation for ITAAC C.2.6.12.02 (Index 672)"(Reference 2), which indicates the ampacity of each offsite circuit exceeds the potential load requirements. The report concludes that each as-built offsite power circuit is rated to supply the load assumptions during normal, abnormal and accident conditions.

U.S. Nuclear Regulatory Commission ND-19-1045 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review determined that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC finding completion review document number is included in the Vogtle Unit 4 ITAAC Completion Package for ITAAC C.2.6.12.02(Reference 3)and available for NRC inspection.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC C.2.6.12.02 was performed for Vogtle Unit 4 and that the prescribed acceptance criteria are met.

Systems,structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References favallable for NRC inspection)

1. SNC Interoffice Memorandum, ND-17-1189,"Assumed Loads During Normal, Abnormal and Accident Conditions", June 30, 2017
2. C.2.6.12.02-U4-PCD,"Vogtle Unit 4 Offsite Power Rating Evaluation for ITAAC C.2.6.12.02 (Index 672)", Rev 0
3. C.2.6.12.02-U4-CP Rev 0,"Vogtle Unit 4 ITAAC C.2.6.12.02[672] Completion Package"