ITAAC Closure Notification on Completion of ITAAC C.2.6.12.01 (Index Number 671)
ML19242C624
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/30/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-1011
Download: ML19242C624 (6)


Text

hk.Southern Nuclear Michael J, Yox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tei AUG 3 0 2019 Docket No.: 52-026 ND-19-1011 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closure Notification on Completion of ITAAC C.2.6.12.01 [Index Number 6711 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item C.2.6.12.01 [Index Number 671]for verifying that at least one offsite circuit is provided from the transmission switchyard interface to the interface with the onsite ac power system. The closure process for this ITAAC is based on the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company(SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Mi&hael J. Yox Regulatory Affairs Director Vogtle 3&4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC C.2.6.12.01 [Index Number 671]

MJY/JBN/sfr

U.S. Nuclear Regulatory Commission ND-19-1011 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W.Jones(w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Oalethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1011 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernlzan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-19-1011 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1011 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC C.2.6.12.01 [Index Number 671]

U.S. Nuclear Regulatory Commission ND-19-1011 Enclosure Page 2 of 3 ITAAC Statement Desion Commitment:

1. A minimum of one offsite circuit supplies electric power from the transmission network to the interface with the onsite alternating current (ac) power system.

Inspections. Tests. Analyses:

Inspections of the as-buiit offsite circuit will be performed.

Acceptance Criteria:

At least one offsite circuit is provided from the transmission switchyard interface to the interface with the onsite ac power system.

ITAAC Determination Basis An inspection of the Offsite Power System was conducted by physical walk down of the as-built circuit installed from the transmission switchyard interface to the interface with the onsite ac power system. This circuit runs from the Vogtle Unit 4 Main Step-up Transformer to the Vogtle Unit 3&4 SOOkV switchyard. The inspection team conducted a thorough review of the as-built Unit 4 SOOkV output line to assure that the line meets design specifications in accordance with Georgia Power Corporation Bulletin # 2-01, "Transmission Line Inspections for New Construction"(Reference 1). This visual inspection, as documented in the inspection report, verified that the as-built SOOkV output line, and its 3 supporting structures, were installed per design.

Inspection report"U4 ITAAC C.2.6.12.01 (671) Offsite Power Inspection Report"(Reference 2) documents the inspection and concludes that at least one offsite power circuit is provided from the transmission switchyard interface to the interface with the onsite ac power system.

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review determined that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC finding completion review document number is included in the Vogtle Unit 4 ITAAC Completion Package for ITAAC C.2.6.12.01 (Reference 3)and available for NRC inspection.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC C.2.6.12.01 was performed for Vogtle Unit 4 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-19-1011 Enclosure Page 3 of 3 References(available for NRC inspection)

1. Georgia Power Corporation Bulletin # 2-01,'Transmission Line Inspections for New Construction", Rev 3
2. C.2.6.12.01-U4-PCD Rev 0,"U4 ITAAC C.2.6.12.01 (671) Offsite Power Inspection Report"
3. C.2.6.12.01-U4-CP-Rev0, ITAAC Completion Package