JUL 3 1979 Docket No. 50-352 MEMORANDUM FOR:
Robert L. Baer, Chief, Light Water Reactors Branch No. 2, DPM FROM:
Dean L. Tibbitts, Project Manager, Light Water Reactors Branch No. 2, DPM
SUBJECT:
FORTHCOMING SITE VISIT AT THE LIMERICK GENERATING STATION, UNIT i DATE & TIME:
Monday, July 30, 1979 - 1:00 p.m.
Tuesday, July 31,1979 - 8:30 a.m.
LOCATION:
Construction site near Limerick, Pennsylvania PURPOSE:
Site visit by Caseload Forecast Panel to assess the status of construction.
Proposed agenda is enclosed.
PARTICIPANTS:
NRC - STAFF (B. Lovelace, H. Berkow, B. Kirschner, D. Tibbitts)
PHILADELPHIA ELECTRIC COMPANY (R. Logue)
%w L.. YN Dean L. Tibbitts Light Water Reactors Branch No. 2 Division of Project Management
Enclosure:
Agenda ccs w/ enclosure:
See next page 1 ['s u J
, n ;;
79081300 8
/1
Mr. Edwa rd G. Ba uer, Jr.
Vice President & Gener,al Counsel Philadel phia Electric company JUL 3 1979 2301 Parket Street Philadel phia, Pennsyl vania 19101 cc:
Troy B. Conner, Jr., Esq.
Conner, Moore & Corber 1747 Pennsyl vani a Avenue, N. W.
Washington,D. C.
20006 Deputy Attorney General Room 512, Main Capitol Euilding Harrisburg, Pennsylvani a 17120 Frank R. Clokey, Esq.
Special Assistant Attorney General Room 218, Towne House Apartments P. O. Box 2063 Harrisburg, Pennsyl vania 17105 Honorable Lawrence Coughlin House of Representatives Congress of the United States Washington,D. C.
20515 Roger B. Reynolds, Jr., Esq.
324 Swede Street Norristown, Pennsylvania 19401 Lawrence Sa ger, Esq.
Sager & Sager Associates 45 High Street Po t 's to w1, Pennsylvania 19464 Joseph A. Smyth Assistant County Solicitor County of Montgomery Courthouse Norristom, Pennsyl vania 19404 Eugene J. Bradley Philadel phia Electric Company Associate General Counsel 2301 Parket Street Philadelphia, Pennsylvania 19101
'f. f\\ k J
<, (
m
ENCLOSURE JiR.3 1979 LIMERICK GENERATING STATION, UNIT NO. 1 CASELOAD FORECAST PANEL SITE VISIT
_ AGENDA 1.
Overview of project construction schedu, including construction progress, major milestones completed, current problems and antici-pated problem areas and schedule for licensing.
2.
Overview of construction management organization and activities.
3.
Review and current status of bulk quantities for Unit I and needed common facility including current total estimated quantities, quantities installed to date, quantities scheduled installed to date, currunt percent complete for each and average installation rates.
a.
Concrete (CY) b.
Process Pipe (LF)
- Large Bore Pipe 2
.i?" and larger
- Small Bore Pipe 2" and smaller c.
Yard Pipe d.
Large Bore Hangers, Snubbers, etc. (ea) e.
Small Bore Hangers, Snubbers, etc. (ea) f.
Cable tray (LF) 9 Conduit (LF) h.
Cable (LF) i.
Terminations (ea) j.
Circuits (ea) k.
Instrumentation 4.
Detailed review and current status of pipe hangers, snubbers, restraints, etc., including design, fabrication, delivery and installation.
5.
Review and current status of preop tests procedure writing, integration of preop testing activities with construction s:"d"'e, system turnover schedule, preop testing and current preop test progr.m manpower.
6.
Review of schedule identifying critical patn items, amount of float for various activities, the current critical path to Fuel Loading and methods for implementation of corrective action for activities with negative float if any.
7.
Estimated percent complete for Unit 1 and needed ccmmon facility as of
'uly 1, 1979.
. r.
1 t'1 a
(
n
All 3 1979 8.
Site tour and observation of construction activities.
9.
Utility commitments on power.
- 10. Anticipated financial problems.
11.
Engineering organization and current status of design / engineering activities.
12.
Procurement management and current status of major components including hangers, snubbers, pipe whips, valves, piping and etc.
13.
Actual and proposed craft werk force, craft availc5ility, prodJCtiVity, potential labor negotiations and problems.
14.
Construction scheduling staff:
Method of calculation of percent complete a.
b.
Method of monitoring rate of completion, identifying critical path items and implementation of corrective actions.
Critical path activities, logic network and computer printout of c.
critical F.nd/or near critical items.
q!()