Text
'
l A
' 7-g l." j Assurance Corporation
/s T
24 Executive % West g
8/
Atlanta. Georgut 30329 i
I (4(M) 325-4200 RECDVED o
Telex: 549567. 542703 6-I 71S Honzon Chve
'/r I
JUL 31979 >
aranosunction. cooraco 81501
's 6
m s, n.,m (303]245-4320 S
TWX 9109295334 rees Mw
\\
\\
VhnDergst:asse 9
&,I\\
- \\,,-
8001 Zunch. Swcenand
[01) 470844 Teex: 57275 July 2, 1979 JDR/79/61/ETS Mr. Charles E. MacDonald, Chief Transportation Branch Division of Fuel Cycle and Material Safety, NMSS U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. MacDonald:
This is in response to your letter of 30 May 1979 in which you requested additional information on Nuclear Assurance Cor-poration's Quality Assurance program to implement the require-ments of 10CFR71, Appendix E.
A total rewrite of the NAC Quality Assurance Manual was well underway with procedures to implement the requirements of Appendix E when your request was received.
After reviewing the status of the manual, it was decided to complete the manual and then prepare a matrix of your questions and the response in specific NAC procedures.
This would not only be responsive to your request but would show how the answers would be implemented in the procedures.
Seven copies of the draft QAM are being submitted for NRC's review.
NAC will complete the coordination among the various internal organizations and then publish the manual.
There may be se ae wording changes but the substance of the manual will be as presented in the draft.
We plan to use this manual on all future programs in a graded approach depending on the complexity, criticality, and/or safety considerations of the program.
If you have any questions regarding the draft QAM, please contact me.
Sincerely, 69 NUCLEAR ASSURANCE CORPORATION 9
- gww, es
}
c '0
)./&
- fg.h.c8 hack D.
Rollins Y'
4 cM Vice President & General Manager M
O'f Engineering and Transport Services JDR:cnr
/ /,.
Ti-Mii-j Enclosures 7908100 W1 lt
' i
?hi, OI /
/*
s MATRIX - NRC SUPPLEMENTARY REQUEST FOR DATA & NAC RESPONSE NRC Request NAC QAM NRC Request NAC QAM 1
01.1 25 07.1 2
00.1 26 04.2, 07.1 3
00.1 27 07.1 4
00.1 28 07.1 5
02.1 29
_07.1 6
01.1 30 08.1 7
02.1 31 08.1 8
03.1 32 10.1 9
03.1 33 10.1 10 03.1 34 10.1 11 03.1 35 10.1 12 03.1 36 12.1 13 03.1 37 12.1 14 03.1 38 12.1 15 04.1 39__
14.1 16 04.1 40' 15.1 17 04.1 41 15.1 18 04.1 42 16.1 19 04.1 43 16.1 20 04.1 44 17.1 21 05.1 45 17.1 22 05.1 46 18.1 23 06.1 47 18.1 24 06.1 48 18.1
\\ll b n;
,