ML19242C506

From kanterella
Jump to navigation Jump to search
Forwards LER 79-074/03L-0
Date released: 09/13/2019 Download: ML19242C506


LER 79-074/03L-0 on 790707:auxiliary Feedwater Pump 1-2 suction-before-strainer Pressure Switch PSL-4929B Actuated at Pressure Input Outside Allowable Tolerance.Caused by Component Failure Due to Misapplication.Switch Replaced
ML19242C508
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/1979
From: Hitchens D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19242C508 (1)
Forwards LER 79-074/03L-0
ML19242C505
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/02/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19242C505 (1)