Notification of 790806-07 Meeting W/Util in Limerick,Pa to Asses Status of Const.Proposed Agenda Encl
ML19242C344
Person / Time
Site: Limerick 
Issue date: 07/03/1979
From: Tibbitts D
Office of Nuclear Reactor Regulation
To: Baer R
Office of Nuclear Reactor Regulation
References
NUDOCS 7908100292
Download: ML19242C344 (4)


Text

O' $

l ps nem

[~

UNITED STATES 3

g NUCLEAR REGULATORY COMMISSION y

7, c

WASHINGTON, D. C. 20858 c._%

/

JUL 3 1979 Docket No. 50-352 MEMORANDUM FOR:

Robert L. Baer, Chief, Light Water Reactors Branch No. 2, DPM FROM:

Dean

t. Tibbitts, Project Manager, Light Water Reactors Brar.ch No. 2, DPM

SUBJECT:

FORTHCOMING SITE VISIT AT THE LIMERILK GENERATING STATION, UNIT 1 CATE & TIME:

Monday, August 6, 1979 - 1:00 p.m.

Tuesday, August 7, 1979 - 8:30 a.m.

LOCATION:

Construction site near Limerick, Pennsylvania PURPOSE:

Site visit by Caseload Forecast Panel to assess the status of construction.

Proposed agenda is entlosed.

PARTICIPANTS:

NRC - STAFF (B. Lovelace, H. Berkow, B. Kirschner, D. Tibbitts)

PHILADELPHIA ELECTRIC COMPAM (R. Logue) h w L.. Y Dean L. Tibbitts Light Water Reactors Branch No. 2 Division of Project Manas.ement Encitsure:

Agenca ccs w/ enclosure:

See next page j

)

l

/-

s

.]

1-n i

(

~

b k

1 I

N

,,s c, i '

190810O M

F.r. Ed5 a rd G. Ba uer, J'.

Vice President & General Counsel Philadel 'hia Electric Company 2301 Fariet Street JUL 3 1973 Philadel phia, Pennsyl vania la hil cc:

Troy B. Conner, Jr., Esq.

Conner, Moore & Corber 1747 Pennsylvani a Avenue, N. W.

Washington, D. C.

20006 Deputy Attorney General Room 512, Main Capitol Building Harrisburg, Pennsyl vani a 17120 Frank R. Clokey, Esq.

Special Assistant Attorney General Room 2 :3, Tovne House Apartments P. O. Box 2063 Harrisburg, Pennsylvania 17105 Honorable Lawrence Coughlin House of Representatives Congress of the United States Washington,D. C.

20515 Roger B. Reynolds, Jr., Esq.

324 Swede Street Norristown, Pennsylvani a 19401 Latrence Sager, Es q.

Sager & Sager Associates 45 High Street Pottstown, Pennsyl vania 19464 Joseph A. Smyth Assistant County Solicitor County of Montgomery Courthouse Norristown, Pennsyl vania 19404 Eugene J. Bradley Philadel phia Electric Company Associate General Counsel 2301 Market Street Philadelphia, Pennsylvania 19101

'g

_EN_ CLOSURE g

g LIMERICK GENERATING STATION, UNIT NO. 1 CASELOAD FORECAST PANEL SITE VISIT AGENDA 1.

Overview of project construction schedule including construction progress, major' milestones completed, current problems and antici-pated problem areas and schedule for licensing.

2.

Overview of construction management organization and activities.

cview and current status of bulk quantities fcr Unit 1 and needed 3.

o

.ommon facility including current total estimated quantities, quantities installed to date, quantities schedul J installed to date, current percent complete fa-each and average installation

rates, a.

Concrete (CY) b.

Process Pipe (LF)

- Large Bore Pipe 21/2" and larger

- Small Bore Pipe 2" and sneller c.

Yard Pipe d.

Large Bore Hangers, Snubbers, etc. (ea) e.

Small Bore Hangcrs, Snubbers, etc. (ea) f.

Cable tra.y (LF) g.

Conduit (LF) h.

Cable (LF) i.

Terminations (ea) j.

Circuits (ea) k.

Instrumentation 4.

Detailed review and current status of pipe hangers, snubbers, restraints, etc., including design, fabrication, delivery and installation.

5.

Review and current status of preop tests procedure writing, integration-of preop testing activities with construction schedule, system turnover schedule, preop testing and current preop test program manpower.

6.

Review of schedule identifying critical path items, amount of float for various activities, the current critical path to Fuel Loading and methods for implementation of corrective action for activities with negative float if any.

7.

Estimated percent complete for Unit 1 and needed common f1cility as of July 1, 1979.

i t

jut 3 di

~

n.

8.

Site tour and observation of construction activities.

9.

Utility commitments on power.

10.

Anticipated financial problems.

11.

Engineering organization and current status of design / engineering activities.

12.

Procurement management and current status of major components including hangers, snubbers, pipe whips, valves, piping and etc.

13.

Actual and proposej craft work force, craft availability, productivity, pote,tial labor negotiations ar.u problems.

14.

Construction scheduling staff:

a.

Method of calculation of percent complete b.

Method of monitoring rate of completion, identifying critical path items and implementation of corrective actions.

Critical path activities, logic network and computer printout of c.

critical and/or near critical items, o

a

('