NSP NORTHERN STATES POWER COMPANY M I N N E A p* O L.l S, M I N N E S OTA 55401 July 13, 1979 Mr. James G. Keppler Director - Region III Office of Inspection and Enforcement
~
United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and No. 50-306 In further response to Item 10 of IE Bulletin 79-06A - Revision 1, the following is offerec:
All safety-related maintenance and test procedures were reviewed to insure they include requirements to assure operability of the redundant safety-related system prior to removal of any safety-related system from service.
Techn!. cal Specifications have always contained this requirement, and it has been adhered to.
It was found that some procedures could be improved by modification requiring more formal documentation of the verification of operability.
All safety-related maintenance and test procedures were revie"ed to insure that functional testing of equipment 13 required before returning the equipment to service. No procedure modifications were required as a result of this review.
It is felt the procedures could be further improved by the addition of independent verification of switch and valve position in those portions of procedures which rettrn systems to service.
Modification of frequcntly-used procedures will be completed by July 31, 1979. Modification of infrequently-used procedures will be complete before their next use.
Yours very truly, f'I k
\\
'hf2d d
?
L. J. Wachter Vice President - Power Production and System Operation r e cc:
Mr. G. Charnoff h[
NRC Office of Inspection and Enforcement Washington, D.C.
)UL 161978 1908090f7T