Notifies of Merger of Problems Re Fabrication of Anchor Bolts from Improper Matl & Defects in field-fabricated Anchor Bolts.One Common Generic Rept Will Be Submitted by 790815,per 10CFR 50.55(e)
ML19242B775
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/05/1979
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
ST-HL-AE-349, NUDOCS 7908090386
Download: ML19242B775 (2)


Text

7V m

Houston Fk g g:p Lighting rz %

e g

tp

& Power q

p-Company

,b L

Electric Tower r

k PO Box 1700 llIl t

I Houston. Texas 77001 r

1 June 5, 1979 SFft: V-0540 ST-HL-AE-349 Director, Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102

Dear Sir:

South Texas Project Units 1 & 2 Docket Nos. STil 50-493, STN 50-499 Second Interim Report on the Reportable Deficiency Concernino Improper Anchor Bolt Material On March 8, 1979, pursuant to 10 CFR 50.55(e), Houston Lighting and Power Company provided your office with an interim report concern-ing the fabrication of anchor bolts from improper material.

The letter indicated that a final report would be submitted by June 1, 1979.

Prior to this, your office was informally notified by HL&P Quality Assurance of other potentially reportable defects in 1100 field fabricated anchor bolts.

Since this notification was informal, and an explicit safety hazard could not be identifird, it was determined that a 30 day report as required by 10 CFR 50.55(e)(3) would not be necessary.

As a result of a technical evaluation, it was determined that the two problems identified above were related.

Consequently, the two were merged as a common generic problem.

HL&P had planned to have a final report available for your review on June 1,1979 as originally indicated.

However, due to the comelexity of conpletely identifying and thoroughly testing all suspect anchor bolts, it is now evident that the necessary information will not be available until August, 1979.

7908090'286 530327

ikvaton lighting & lbwer Company ST-HL-AE-349 Page 2 A final report will be submitted to your office by August 15, 1979.

Ve J tru),y yours,

./

CL Nw

'u E. A. Turner

/

Vice President Power Plant Construction

& Technical Services 3

LRJ:bf cc:

Director, NRC Office of Inspection & Enforcenent C. Thrasn (Baker & Botts)

R. Gordon Gooch (Baker & Botts)

J. R. flewman (Lowenstein, t;ewnan, Reis, Axelrad & Toll)

D. G. Barker A. J. Granger R. A. Frazar 5200':8