U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMDiT
REGION III
g
Report No.
50-295/79-08
4;
f
Docket No.
50-295
License No. DPR-39
Safeguards Group No. IV
Licensee: Con:monwealth Edison Company
Post Office Box 767
Chicago, IL 60690
Facility Name: Zion Nuclear Power Station - Unit 1
Inspection At: Zion Generating Station, Zion, Illinois
Inspection Conducted: May 29-31, 1979
h [ % b.u g
Inspectors: ' A. G. Finley].
G!!V
'l
(
(Ddte)'
A lh x
. P. Patterso
'y
b//*O77
'
(Da'te)
J.f
Is!/
9
si
Approved By:
A. Hind, Ch ef
Safeguards Branch
(Da'te)
Inspection Forcarv
Unannounced inspection on Mav 29-31, 1979 (Report No. 50-295/79-08
Areas Inspection: Nuclear material control and accountability
including facility organization and operation; measurement and
controls; inventory and inventory verification; shipping and
receiving; storage and internal controls; records and reports;
management of material control system. The inspection involved
40 inspector-hours onsite by two NRC inspectors.
Results: Of the seven areas inspecte.:!, no apparent items of
nonccmpliance or deviaticas were identified in five areas, two
7
apparent items of noncompliance (deficiency - not reporting a
L
receipt and snipmcat by Form NRC-751 on Form NRC-742 - Paragraph
7;
9 and deficiency for not follcwing facility nuclear proced21re
f-
No. 3 - Paragraph 8).
- -
C;.
(Details: Part 2.790(d) Information)
E-
- ( 9 08 0 9 OZ$/