Responds to IE Bulletin 79-02.Program Initiated to Develop Generic Base Plate Flexibility Computer Analysis & Insp of Sample Population of drilled-in Anchor Bolts
ML19242B549
Person / Time
Site: Maine Yankee
Issue date: 07/05/1979
From: Groce R
Maine Yankee
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
WMY-79-68, NUDOCS 7908080710
Download: ML19242B549 (4)


Text

{{#Wiki_filter:Y' U l e.e 'y' h h O TURNPW.E ROAD sHT H wts IBORO V ASSAC Hude TTS 01S0! ENGINEER!NG OF FFCE b l 7 - M4 'C l I _ _. - ~O B.4.2.1 WMY 79-68 July 5, 1979 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Rogion I King of Prussia, Pennsylvania Attention: Mr. Boyce H. Grier, Director

References:

(a) License No. DPR-36 (Docket No. 50-309) (b) USNRC Letter to MYAPC dated March 8, 1979. I & E Bulletin 79-02 (c) USNRC Letter to MYAPC dated June 21, 1979 I & E Bulletin 79-02, Revision 1

Dear Sir:

Subject:

Response to I&E Bulletin No. 79-02, Revision 1 Upon receipt of the subject I&E Bulletin a three part effort was begun by Maine Yankee to address your concerns: a. A program is underway to develop a generic base plate flexibility computer analysis. b. Plans to re-analyze base plate stresses and anchor bolt applied loads were initiated, c. A progran for inspection of a sample population of drilled-in anchor bolts at >bine Yankee was initiated. The following explanation of our actions are presented in the same sequence as your bulletin: 1. Since base plate flexibility was not considered in the Fbine Yankee design we have undertaken a program to develop a finita element computer program which accounts for flexibility in the exic $ng base plates. This program will produce anchor bolt 3 e plate stresses and deflections which result from ap .oads, shears, coments and the effect of the stiffness of . bas plate and attached structure. The analytical model used in this analysis employs a finite J.l) rrJ 4 4 5L l 5 080 ~/ / O pF

t. United States Nuclear Regulatory Commission July 5, 1979 Attention: Mr. Boyce H. Grier, Director Page Two element, three dimensional mesh assuming linear elastic steel to model the base plats. Tension only, one dimensional axial, non-linear elements ar used to represent the bolts; and compression only, non-linear axial elements are used to model the concrete behinri the base plate. All Seismic Category I Piping at Maine Yankee will be reanaly=ed with new response spectra inputs to modern computer codes as part of our commitment resulting from the March 13, 1979 order to show cause relative to seismic piping. Pipe hanger loads resulting from these analyses will be used as inputs to the base plate reanalysis effort. Meanwhile existing support and drawing compatibility are beire verified in preparation for the re-analysis program.

2. Original design loads for seismic piping support anchor bolts at Maine Yankee were predicated on the recocmendations of the anchor bolt manufacturer.

These values are supported by the manufacturers' test program. Properly installed drilled-in anchor bolts used at Maine Yankee develop the ultimate loads originally published. The factor of safety reco= mended by the manufacturers of all drilled-in anchor bolts in use at Maine Yankee is four. In other words the ultimate load, verified by the manufacturers test program, is four tlmes the design load. If testing justifies a change in the ultimate load our design load will change by the four to one factor of safety but the factor itself is an arbitrary value equally applicable to all equipment. We, therefore, see no way to justify the use of two factors of safety for one type of equipment. We will, for these 7 easons, continue to use the manuf seturers recommended facto ot safety of four for all drilled-in anchor bolts. The ultimate :apacity of the bolts will include the effects of shear and teasion interaction, proper edge distance and spacing.

3. To prevent the application of high cyclic loading on drilled-in anchor bolts at Maine Yankee our test program is designed to verify that a pre-tension equal to the bolt design load exists in each anchor bolt.

Manufacturers test data indicates that this installation procedure develops the full tension and shaar be

s. ~ United States Nuclear Regulatory Commission July 5, 1979 Attention: Mr. Boyce H. Grier, Director Page Three capability and assures little to no cycling of anchor bolt loads.

4. Sufficient QC documentation does not exist at Maine Yankee to assure correct installation. A testing program has been initiated to accomplish this. This prcgram provides for testing a rancoely selected sample of drilled-in anchor bolts. Testing consista of first verifying that the number, ;ize (diameter),

type, location and length (embedment depth) of the bolts meet the drawing re_quirements. The bolts are then torqued to an equivalent tensile value equal to the bolt design load. The relationship of torque to tension in being verified by on site testing. A test is also made at this time to assure that auchor bolt shells and leveling nuts are not in contact with the back side of the base plata. The testing program has shown thus far no failires of any anchor bolts. Furthermore, since anchor bolts are used for deadweight anchors as well as seismic restraints, and have not shown a history of failures even though they have been under constant load since their installation; we feel that initial correct installation has been amply demonstrated. In the event a review of the applied loads (from the results of the re-analysis) indicatea any vale: in excess of the design load for any bolt, a design adjustment and modifications to the structure will be made to rectify any inadequacies. A large majority of the 2 inch diameter and smaller pipes at Maine Yankee were analyzed by the chart method which has been shown to be very conservative. Visual inspection of the supports for these pipes will be conducted. If no failures or incorrect installation of the drilled-in anchor bolts for these pipes is noted by this method, no further action will be undertaken. Any failure to meet our inspection requirements will require the incl::.sion of these piping supports into our sampling and testing program. They would then be required to meet the requirements of that program.

5. Anchor bolt testing at Maine Yankee is complete.

No failed or improperly installed anchor bolts have been found. In conclusion we believe that Maine Yankee has demonstrated a total adequacy in the design and installation of seismic piping restraints and their anchor bolts. Recent test resu?ts revealed no failures of dead load supports, due in part to the known conservatism in design demonstrated in the piping stress analysis review this past spring. Our continuing analytical program will verify this adequacy. r'- JJJ >n)

r +- United States Nuclear Regulatory Commission

ny 5, 1979 Atter. ion

Mr. Boyce H. Grier, Director Fage Four We feel certain the above answers your concerns on this subject, however, if you require further information, please contact us at your convenience. Sincerely, MAINE YANKEE ATOMIC POWER COMPANY Robert H. Groce Licensing Engineer MMA/scw C ~ c. JJ'~ 341,1 =.}}