ML19242B422
| ML19242B422 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 05/30/1979 |
| From: | Schaffer S DUQUESNE LIGHT CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 7908080494 | |
| Download: ML19242B422 (1) | |
Text
$G 4 435 Sixth Avenue OMM L Pittsburgh, Pennsylvanla 15219 STANLEY G. SCHAFFER May 30, 1979 President Mr. Boyce H. Grier, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania '19406
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 IE Bulletin No. 79-04 Incorrect Weights for Swing Check Valves Manufactured by Velan Engineering Corporation
Dear Mr. Grier:
Pursuant to the above, we have reviewed all purchase orders for safety related valves included within the Stone and Webster scope of supply, and the manufacturer's drawings for all safety related valves within the NSSS Vendor scope of supply, and have determined that 3, 4, or 6 inch diameter swing check valves manufactured by Velan Engineering Corporation are not provided for Beaver Valley Power Station - Unit No.
2.
Therefore, the concerns expressed in the NRC IE Bulletin 79-04 are not applicable to Beaver Valley Power Station - Unit No.
2.
Sincercly,
/-
/
/
/
jp'd4t
'/ea U cc:
Dr.
E.
Volgenau (15)
Mr.
W.
G. Mcdonald (1) 504 360 79 08 080,PL L
1
,