ML19242B222

From kanterella
Jump to navigation Jump to search
Forwards LER 79-049/03L-0
Date released: 09/13/2019 Download: ML19242B222


LER 79-049/03L-0 on 790718:during Refueling Shutdown, Discovered That Tech Specs 3.2-11,Item 8,had Been Revised to Include Recorder Requirement,But Procedure HNP-1-3880M Was Not.Caused by Personnel Oversight.Procedure Revised
ML19242B224
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/01/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242B224 (1)
Forwards LER 79-049/03L-0
ML19242B221
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/01/1979
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242B221 (1)