fc Metropolitan Edison Company
. 9 m-gk:'
f
{'-
Reading Pennsylvania 19640 Post Office Box 542 gj 215 929-3601 Writer's Direct Deal Nurnber July 5, 1979 GQL 0831 Mr.
B. H. Grier, Director Office of Inspection and Enforcement Region I U.S. IIuclear Regulatory Ccenission 631 Park Avenue King of Prussia, Pennsylvania 19h06 De ar Sir :
Three Mile Island Tiuclear Station, Unit 1 (TMI-1)
Operating License Ilo. DPR-50 Docket ?!o. 50-289 IE Bulletin 79-10 Please find attached TMI-l's response to IE Bulletin 79-10.
Sincerely,
\\
/
\\
/
J. G. Herbein Vice President Generation JGH:3JS:nr:
Attachments: Table 1 Table ?
cc: U.S. :iuclear Regulatory Cornissicn Office of :Iuclear Reactor Regulation Division of Project '<anagenent Operator Licensing Branch Washington, D. C.
20555
- l 1
) j ')
J20 Metropo! tan Ed son Cor nf s a f.'emter cf me Gererm Pu tc Ut :es Sver7 9 0 8 0 i ' Q r
d
IE Bulletin No. 79-10 Date:
May 11, 1979 TABLE 1 Utility:
Metropolitan Edison company Date:
July 5, 1979 Facility: Three Mile Island, Unit 1 Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1
2 3
4 1
2 3
4 1.
Action 1: Responses A.
Total numoer failed o
o o
o o
e o
o annual examination B.
Percent that failed o
o o
o o
o o
o annual examination 2.
Action 2:
Responses A.
Percenf~ required to 30 88 6h 7h 80 93 66 69 attend additional lectures B.
Number of operators re.e Table 2 see Table 2 attending specified number of lectures (no.
of operators /no. of lectures) 3.
Acticn 3:
Responses A.
Total number attending o
o o
o o
o o
o accelerated training because < 70 percent on annuai written examinatica B.
Percent attending o
o o
o o
o o
o accelera, d training lesson because < 70 percent on annual written examination i
'./
)
.)
IE Bulletin No. 79-10 Date:
May 11, 1979 TABLE 1 (Continued)
Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1
2 3
4 1
2 3
4 C.
Total number attending o
0 0
0 0
0 0
0 accelerated training because unsatisfactory oral examination D.
Percent attending o
0 0
0 0
0 0
u accelerated training because unsatisfactory oral examination Date of Exam 1 16/18/75 2
07/07/76 3
03/03/77 4
03/01/78 t
IE En11etin No. 79-10 Date:
May 11, 1979 TAELE 2 Utility:
Metropolitan Edison Date: July 5, 1979 Facility:
Three Mile Island, Unit 1 Reactor Operators Senior Reactor Oterators Operators Classes Operators Classes Exam 1 1
8 1
6 4
0*
2 1
5 0*
Exam 2 1
0*
1 1
1 1
1 7
1 5
2 3
9 2
2 h
2 2
h 0*
Exam 3 1
0*
1 h
1 h
1 6
3 1
h 1
2 2
3 0*
Exa= h 1
0*
1 h
5 1
1 5
3 0*
2 2
2 1
- Fersonnel did not attend lecture but completed the clacsroca caterial on a celf-study basis. The operators (RO/SEO ) also ecepleted additional self-study to complete the assignment and demonctrated their proficiency by passing exam cr quiz en the caterial.
_ e}
- j
.)
t