ML19242A414

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-295/79-06 & 50-304/79-07.Details Withheld (Ref 10CFR2.790)
ML19242A414
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/17/1979
From: Reed C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19242A329 List:
References
NUDOCS 7908010631
Download: ML19242A414 (1)


Text

. Commonwealth Ediaon e

V One Firt: Nationai Plaza. Chicago. Ilknois Address Reply to Post Office Box 767 Chicago libriois 60690 May 17,1979 Mr. James G. Keppler, Director Directorate of Inspection and

- Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subject.

Zion Station Units 1 and 2 Response to IS Inspection Report Nos. 50-295/79-06 and 50-304/79-07, 10 CFR 2.790(d) Information NRC Decket Nos. 50-295 and 50-304 Reference (a) :

April 26, 1979 letter from J. A. Hind to Byron Lee, Jr. transmitting IE Inspection Report Nos. 50-295/79-06 and 50-304/79-07

Dear Mr. Keppler:

An inspection was conducted by Messrs. J. L. Belanger and J. C. Howell of your office on March 19-23, 1979 of activi ies at Zion Station Units 1 and 2.

As indicated in Reference (a), during this inspection certain activities appeared to be in noncompliance with NRC requirements.

The inspection also showed that action had been taken to correct the first item and to prevent recurrence.

Consequently, no response to that item was required.

Commonwealth Edison Ccmpany's response to the second item of noncompliance is con-tained in Attachment A to this letter.

Fiease address any questions that you may have on this matter to this office.

Very truly yours, on s

A_

Cordell Reed Assistant Vice-President h

attachment Attachment Contai.as

-(, ',

10 CFR 2.790 INFOR'JATION R } (;

WITIEOLD F 20M PUBLIC DISCLOSURE 790801063/