Metropolitan Edison Company gj i
f y Post Office Box 542 Reading Pennsylvania 19640 215 929-3601 Writer's Direct Dial Number July 25, 1979 COL Oo n.
Director of Nuclear Reactor Regulation Attn: S. B. Hosford, Task Manager ( A-2)
Engineering Branc:
Division of Operating Reactors Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Cornission Washington, D.C.
20555 REF:
B&W-1538, Rev. 1 " Assumptions, Methodology and Acceptance Criteria Report for Asynnetric LOCA Loads Evaluation" transmitted in letter of July 16, 1979, J. H. Taylor, B&W to S. B.
Hosford, NRC
Dear Sir:
Three Mile bland Nuclear Station Units 1 & 2 (TMI-l & TVI-2) uperating License Nos: DPR-50: TMI-l & DPR-73 : TMI-2 Docket Nos: 50-289: TMI-1 & 50-320: TMI-2 In response to the NRC letter dated January 25, 1978, we as a participant of the B&W 177 FA Owners Group, have been pursuing a multi-phased program to evaluate the effect of asy=cetric LOCA loads.
By letter dated May 18,1979 (GQL 0697), you were advised of the results of Phase I of our analysis.
Also included in that letter was an outline for Phase II.
The termination date for Phase II, at that time, was identified as mid-March, 1980.
Please be advised that the NRC required analyses subsequent to the accident at TyI-2, have occupied the time of key EsW personnel. This has resulted in a delay in the Phase II prot. ram completion. The new cc:rpletien date is July, 1980. As was discussed with you earlier this year, seismic loads will not be combined with LOCA loads during Phase II of our analysis.
O D
N
~
O &
70
-l" i
i 7908010 O (e h
/O
,r n )
Metropvaan Ed son Company is a Member of the Gonera! Pustc Utit es S stem f
I S. B. HOSFORD July 25, 1979 GQL 0931 If you desire to review the progress of Phase II and/or have any questions concerning the extended schedule completion, a meeting can be scheduled for August 8, 1979 at the Babcock and Wilcox Ce:pany office in Lynchburg, Virginia. At that time, if you wish, we can also review vith you B&W 1538, Rev. 1, transmitted by the reference letter.
That document outlines the methodology and assumptions applicable to our Phase II program.
Please advise Mr. Lou Lanese, GPU, if you desire the teeting on August 8, 1979 Sincerely, (0 /
y
?
m J. G. Herbein Vice President Generation JGH:EAL:mm cc: V. S. Noonan - NRC H. Silver D. DiIanni E]^