ML19242A241

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required
ML19242A241
Person / Time
Site: University of Virginia
Issue date: 07/06/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williamson T
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
References
NUDOCS 7908010078
Download: ML19242A241 (2)


Text

r h_ ___ _

  • * " " ' %'o UNITED ST ATES l'

.., g ' ',,

NUCLEAR REGULATORY COMMISSION

_v I

'-l)

E REClON 11 b,

,8 101 M ARIETT A sT., N W.suff E 3100

('

k~

AT L ANT A. GE oRGI A 30303

' N.-

g

JUL 6 1979 In Reply Refer To:

RII:JP0 50-62 50-396 University of Virginia Attn:

T. G Williamson, Director Reacter Facility Giarlottesville, Virginia 22901 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the infor-mation for possible applicability to their facilities.

No specific action If you have questions regarding or response is requested at this time.

this matter, please contact the Director of the appropriate NRC Regional Office.

C ^

w James P. C'Reilly A

Director

Enclosure:

IE Information Notice No. 79-18 q ? C' s, <3 quL c 4 C, 7 90B010 07 ?

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCDiENT WASHINGTON, D.C.

20555 July 6, 1979 IE Information Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:

The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.

Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.

The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established. This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.

If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities. No specific action or response is requested at this time.

If f urthe r NRC evaluaticus so ind'.cate, an IE Circular cr Bulletin will be issued to recommand or request specific licnesee actions.

If you have questions regarding the me.tter, please contact the Director of the appropriate NRC Regional Office.

No written response to this information notice is required.

460 2dCS

IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Inform $ tion Subj ec t Date Issued To Notice No.

Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -

2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08

'nterconnection of 3/28/79 All power reactor

i.,taminated Systema with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with a-OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 1

79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Irrulation Support Problem OL9 and cps

IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.

Issued 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable sapport Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-17 Source 'lolder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate A/Sg e