ML19242A186
| ML19242A186 | |
| Person / Time | |
|---|---|
| Site: | 07100361 |
| Issue date: | 06/12/1979 |
| From: | Ross D ENERGY, DEPT. OF |
| To: | Nussbaumer D NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 7907310480 | |
| Download: ML19242A186 (1) | |
Text
-
~; r A w J b.,e</
\\-
C
,,,, r / y.r '
/s /uf-*"
'.g g;,y@
Department of Energy 3,, 47,6 Washington, D.C. 20545 gg
{
m
~.
JUN I 2 1979 J W " ~g /
y 3
?
Mr. Donald A. Nussbaumer d.
O Division of Fuel Cycle and S
9 Material Safety N
%(hrC L
U.S. Nuclear Regulatory g
Commission 31)M 9 M.3ai Washington, D.C.
20555 a
f a,s.w'N hS!
C s-
Dear Mr. Nussbaumer:
s#
,I:
Q p$pr 11;/:g The present Certificate of Compliance #0361 for the PF-l plutonium oxide packaging has a serious administrative flaw.
In section 12 describing the operational controls tk.ce is a requirement for stowing the cargo in an af t-most locutien.
There is a practical problem if this location is not accessible to a crew member during flight as required by DOT regulation 49 CFR 175.85b.
We recommend that NRC revise the present certificate #0361 as follows:
12a) The package (s) must be stowed aboard aircraft on the main deck in the af t-most location that is possible for cargo of its size and weight and accessibility.
No other type cargo may be stowed aft of the package (s).
If you have any questio.u about this suggestion, please call me.
Sincerely, Ek N N
7_
m Donald M. Poss, Chief d
Occupational Safety Branch fj e)
/
aerational and Environmental d
g 4.(f N Safety Division J
DOCKETE0 Y.cT' \\
i U5NRC t.'
93 JUN 1 9 F '
sw
.n u
- .i j,s 4
.,Q
~3108 9.h?
. gv)
/PIf' c; a 7
'; ; r, s
~ i.,
e 4907M%'80 wx
- &