ML19241C059

From kanterella
Jump to navigation Jump to search
Forwards Memorandum by M Spangler Memo on Possible Effects of TMI on Cost Benefit Issues.Suggests Meeting W/Rc Deyoung to Discuss Issue.W/O Encl
ML19241C059
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/19/1979
From: Ernst M
Office of Nuclear Reactor Regulation
To: Deyoung R
Office of Nuclear Reactor Regulation
References
NUDOCS 7907260497
Download: ML19241C059 (1)


Text

,; c_ c -

L D '-

APR 1. 'S/9 i:CTE TD:

R. C. CcYoung. Director. DSE FECJ::

M. L. Ernst AD/ET, DSE Si;SJECT: CDST-SEliEFIT ISSUES RE: DI I astad lil'er Spangler to put det:n saa thcu; hts regarhing the possible effects of TiI oc cur cost-bemfit vcrk. He cid so (encicsed). I!y first reactica is that, considering the icv probability cf such an accient, the actual _ statistical != pact of THI on these issms wili be scall. Ikarver, Inc ps#1c frpacts could be substantially bigger. Also, these will all to ripe issue', fcr contention at herings, tthich will likaly recult in a sub-stantial canpcuer and dollar cost to treat subjects Itke this in EIS's asd l

in contentions.

l Perhaps w should meet en this subject.

Malcob L Ernst, Assistant Director for Envircrzantal Technology Division of Site Safety and Environmental Analysis

Enclosure:

As stated cc:

D. tmiler V. Mccre H. Spangler

'. E 3 I.

G. Lear If y g;iun U uuu u m ruf() j 3

Qi;;;^2

)

S. J. Youngblood 79072 60437 AD/ET/CSE MLErnst:et 54321/

4/ /79