ML19241C059
| ML19241C059 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/19/1979 |
| From: | Ernst M Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7907260497 | |
| Download: ML19241C059 (1) | |
Text
,; c_ c -
L D '-
APR 1. 'S/9 i:CTE TD:
R. C. CcYoung. Director. DSE FECJ::
M. L. Ernst AD/ET, DSE Si;SJECT: CDST-SEliEFIT ISSUES RE: DI I astad lil'er Spangler to put det:n saa thcu; hts regarhing the possible effects of TiI oc cur cost-bemfit vcrk. He cid so (encicsed). I!y first reactica is that, considering the icv probability cf such an accient, the actual _ statistical != pact of THI on these issms wili be scall. Ikarver, Inc ps#1c frpacts could be substantially bigger. Also, these will all to ripe issue', fcr contention at herings, tthich will likaly recult in a sub-stantial canpcuer and dollar cost to treat subjects Itke this in EIS's asd l
in contentions.
l Perhaps w should meet en this subject.
Malcob L Ernst, Assistant Director for Envircrzantal Technology Division of Site Safety and Environmental Analysis
Enclosure:
As stated cc:
D. tmiler V. Mccre H. Spangler
'. E 3 I.
G. Lear If y g;iun U uuu u m ruf() j 3
Qi;;;^2
)
S. J. Youngblood 79072 60437 AD/ET/CSE MLErnst:et 54321/
4/ /79