Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required
ML19241B956
Person / Time
Site: 05000199
Issue date: 07/06/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Koplik B
MANHATTAN COLLEGE, RIVERDALE, NY
References
NUDOCS 7907250456
Download: ML19241B956 (1)


Text

fk-

  1. d ' ';

/

1 UN:TED STATES i

NUCLEAR REGULATORY COMMISSICN I, -

REGION I y' )..jllL : [j 031 PAR K AVE NUF

")

d[

'< LNG G r PRyss: A, DE N'.SY L V ANI A 19106 Sg July 6, 1979 Docket fio. 50-199 Manhattan College Corporation ATTil:

Dr. Bernard Koplik, Chainnan flechanical Engineering Department Bronx, flew York 10471 Gentlemen:

This Infonnation flotice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the information for possible applicability to their facilities, fio specific action or response is requested at this time.

If you have questions regarding this matter, please contact the Director of the appropriate f1RC Regional Office.

Sincerely,

/

O n

Boyce H. Grier Director

Enclosures:

1.

IE Infonnation flotice fio. 79-18 2.

Listing of IE Information flotices Issued in 1979 cc w/encls:

Brother Gabriel Kane, Professor of Physics

[QJ U '] O 7907250 4'56

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-18 Date:

July 6, 1979 Page 1 of 1 SKYLAB REENTRY Description of Circumstances:

The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.

Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency r,lans in case such an event should actually occur.

The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established.

This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.

If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities.

No specific action or response is requested at this tima.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.

If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.

No written response to this information notice is required.

Itf34 091 7 007120397

ENCLOSURE 2 IE Information Notice No. 79-18 Date:

July 6, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued to Notice No.

Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactar Shock and Sway Arrestor facilities with an Operating License (0L) or Construction Permit (CP) 79-02 Attempted Extortion -

2/2/79 All Fuel Facilities low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All power reactor Safety-Related Piping facil ities with an OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactt-facilities with

.n OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systen - Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactivity 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP t;g e O /-

IE Information Notice No. 79-18 Date:

July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued to Notice No.

Issued 79-11 Lower Reactor Vessel Head 5/7/79 All power reactor Insulation Support Problem facilities with an OL or CP 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities, Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All power reactor Level in the Oyster facilities with an Creek Reactor OL or CP 79-14 Safety Classification of 6/11/79 All applicants for, Electrical Cable Support and holders of a Systems power reactor CP 79-15 Deficient Procedures 6/7/79 All power reactor facilities with an OL or CP 79-16 Nuclear Incident at 6/22/79 All research and Three Mile Island test reactors with an OL 79-17 Source Holder Assembly 6/20/79 All power reactor Damage from Misfit Between facilities with an Assembly and Reactor Upper OL or CP Grid Plate

/{ {3 0 0)b