Text
..
/
n
/
- /9 BOSTCN EDISON COMPANY TELECOPY MESSACE 0900 To:
215-337-5324 Dace /Tima: July 16.19797 Tolephone Waiber To: Diractor, Region I Prous: Pil. grim Nucl, car Power Station Office of Ina.pection and Enforcemenc Ri'D #1 hcky tiill had U.
- 3. Nuclear hgulatory Comatiadon Plymouth, MA 02360 631 Park Avenue King of Prussia, PA 19406 Subj ect :
PROMPT REPORTABLE OCCURRENCE Docket Number $0-293; License DPR-35 Assigned LER Number 79-022/OtX-0 Event
Description:
On July 13, 1979, while continuing our evaulation of seismic rostratncs, it was discovered that tuo pipa supports did not meer the original design SSE specifications.
These pipe stipportas are on t.he ifPCI te..st line downstream of the test value and on the RHR crosstie.
Cause and Corrective Actica*g The cause of this event was design error.
P l.an t design chandes tequests were prepared and ciodifleaticos are in progress to bring the supports up to.ta nd.s rd s.
0
_% Thermal MJ Facility Status:
c) butine Startup g) Shutdown X
d) Lutine Shutduwn_
b) Herueling
- 1) Other e) Steady State f) Load Chandiug j) Not Applicaple A written f allow-up report will be sent within two weeks.
NRC person antified T. Stedka Prepared by cha.les J. Mathis f9 c:w n
A
,j,
%y
. 1,; y 1 ;],
y jI.
t/
Og3 7 907200 A 76 s
Mail (2) copies to:
Director Offies or M aagement Information and Progr.cm Controi U.
S. Nuc lear Megu laco cy Cocustaulun f ],
7pJJ9 wasnin.3co.t. u.C.
2osu j
>