't l
I
(&WY y _i
.,m a a r--
uu bv
..a DISTyRATION:
~
jGeftral Files A/D RS Reading El2 1973 CSB Reading I D 3* *"! "'a " r r a a. - -.
uL w L 1! u.,,;, y..'..m Af a ;,n.
MENRANCUM FOR: Richard H. Vollmer, Director,. TMI-2 Support, NRR FRCM: -
Richard P. Cenise, Acting Assistant Director for Reactor Safety 05S
SUBJECT:
TMI-2 CONTAI.PEMT INFORMATICM In' response to'your memorandun of June 14, 1979,, the Containment Systems Branch proposes that the plans for-containment entry and subsequent cleanup operations include. the following:
s
- 1) Observations on character and distiibutica of debris around the containment ssp.aree, and near or artund isolation valves that are open to the contairant; atmosphere;..
.~..;,.;
- 2) Observations on insulatton mterials, both metallic and non-metallic, to determine the amount if any that came off of piping systems, and whether there'was. anar deterioration of s
non-metallfe insulation;.
- 3) Observations orr. paints, to detennine the amunt if any that has.
peeled off of walls, whether there is any blistering of thr-existing paints; and whether they contriboted as source terms for hydrogen; w.
- 4) Observations on tre containment' Tiner to determine whether there are any bulges or other physical distorttons;
- 5) Observaticns related to the amount of water on the floor; e.g., the elevation of the water level; and
- 6) Exar.rination of any evidence that might be used for characterizing the spray coverage when the contairrient spray system actuated.
In all these " observations", liberal use should be made of T'l recording, voice -
recording, still phctography, etc. to provide the best possible record of the situation.
, 7 9 0719 0 go O
54fG1G
~
I
~
Richard P. Cenise, Acting Assistant Director L a i..a
^a.'w
.w 3
DSS;CSB DSS : A/D: S,,,,,,,,0,1 vi,s,i gn_ oi Sys tems Safe.y,_,,_,,,,
.. g gIy,LN RCenise
. 7. /.7./.;9....
.JJ.MS......
a m i.
- 7-.-.--.~..~.im-...--
_ lac ecum ns (9 76 xxcx a24e