Pf,ti ADELPHIA ELECTRIC COMPANY OWi 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 JOSEPH W. GALLAGHER stacinic Paooucr on esemuss.r (215)841-5003 May 23, 1979 Docket Nos.:
50-277 50-278 Mr. Boyce H.
Grier Director, Region I Office of Inspection & Enforcement U.S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Reference:
Letter S.
L.
Daltroff to B.
H.
Grier, November 22, 1978.
Response to IE Bulletin 78-12
Dear Mr. Grier:
This letter completes the response to IE Bulletics 78-12,78-12A, and 78-13B.
The Peach Bottom Atomic Power Station Vessel supplier, Chicago Bridge & Iron (CB!) and Babcock and Wilcox (B&W) have completed a search of low alloy, higb : ensile weld deposits used in all reactor pressure vessels built in their facilities or their suppliers facilities.
CB&I prepared a report of the results and have submitted the report to the NRC by letter, Ralph E.
Kelley, Manager CQA Services (CB&I) to G.
Wayne Reinmuth, Assistant Director, Division of Reactor Construction Inspection, NRC dated April 24, 1979.
The report certified that there were no deviations found for Peach Botton No. 2 and 3 reactor vessels.
Philadelphia Electric Company (PECO) has archive weld deposit material from the Peach Bottom vessels in storage, should verification tests be required.
j i;(
U'] U
./o 7 907180 jff
Mr. Boyce H.
Grier, Director Page 2 Mr.
G.
Wayne Reinmuth of the NRC has advised us that it is not necessary for PECo to submit a separate copy of the vessel manufacturer's report to the NRC; accordingly we hereby incorporate by reference the CB&I report as PECo's response to the referenced Bulletin.
Very truly yours, f :_0 k IA cc:
U.
S.
Nuclear Regulatory Commission Office of Inspection & Enforcement Divisions of Reactor Operations Inspection Washington, DC 20555 eni
~ :\\ ~i 4/0 UUl