bi,,
gkB MGug I%
I
+
UNITED STATES
['
h NUCLEAR REGULATORY COMMISSION
- (
g
.y WASHINGTON, D. C. 20555
'%, ' v /
.,, y o
~ 4 1979 Docket flo. 50-201 MEMORANDUM FOR:
L. C. Rouse, Acting Chief Fuel Reprocessing and Recycle Brtnch FROM:
Charles J. Haughney Fuel Reprocessing and Recycle Branch
SUBJECT:
MEETING
SUMMARY
LICEflSEES:
Nuclear Fuel Services, Inc. (NFS) and New York State Energy Research and Development Authority (NYSERDA)
FACILITY:
Pestern New York Nuclear Service Center West Valley, New York Purpose _:
To discuss the progress of NFS efforts to process technical data useful for future decontamination and decommissioning of the West Valley facility and to discuss the present status of f!FS efforts to investigate the 8D-2 pan defect.
Place and Date:
f:aclear Regulatory Commission (flRC)
Office of Nuclear Material Safety and Safeguards Silver Spring, Md., May 16, 1979
Participants:
Please see attached list.
Reference Index of NFS Facility Desion Data The complete index for plant area 4, Solvent Extraction and Waste Separation, was provided during the meeting.
A copy of this portion of the index is attached. Tha next plant area to be indexed is plant area 5, Product Purification, Storage, Handling and Shipping.
517 053 n
79071300% p.
I'N 2 1 1979 L. C. Rouse
_g_
Report of Decontamination History The portions of the decontamination history report that describe decontami-nation of plant surfaces within the Extraction Cherrical Room and Extraction Cells 1 through 3 have been developed as draft working papers. The initial draft of this report is appro; %ately seventy-five percent complete.
Discussion of Follow-up Action to 8D-2 Pan Defect Permanent pneumatic instrumentation lines have beer. installed replacing '
temporary lines to the 801 and 8D2 pan and vault level detectors. Taylor transmitters have been installed in new above-ground cabinets on the tank farm. The cabinets are located such that the lengths of the detector purge lines are minimized.
The vault eductor steam supply lines and permanent vault levelometer lines for 8D1 and 2 that had been discovered to be twelve inches shorter than required by plan have been extended to conform with the plan.
Next Meeting The next meeting is tentatively scheduled for 1:30 PM, Wednesday, July 11, 1979 at the NRC offices in Silver Spring, Md.
n Charles J. H ' hney Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and Material Safety Enclosure s :
Attendee List Index
[
LIST OF MEETING PARTICIPANTS NFS/NYSERDA - MAY 16, 1979
Participants:
C. J. Haughney UST'RC-FCRR A. T. Clark U.cNRC-FCRR W. G. Browne USNRC-FCRR N. J. Newman NFS J. R. Clark T. K. CeBoer NYSERDA A. C. Pierce NFS A. At'riss NRC-WM Ot's9,g.
W. M. Crofford EPA c.l 055 o\\
DRAFT MAY 1979 fft1hy AREA 4 - SOLVENT EXTRACTION AND WASTE SEPARATION 1.0 Process 1.1 Bechtel Drawings 4R-A-1 P&IO, Partition Cycle 4A-A-1
'P&ID, Plutonium Cycle 4D-A-7 Material Balanca Data 4R-A-23 Instrument Control Diagram 2.0 Layouts 2.1 Bechtel Drawings 15A-A-101 Overall Plot Plan 15A-A-102 Plot Plan, Process & Disposal Area 15A-A-103 Plot Plan, Process Area 15A-A-119 Gen. Arrgt. Process Bldg. 131' 15A-A-120 Gen. Arrgt. Process Bldg. 144' 15A-A-124 Gen. Arrgt. Process Bldg. Section No. 3 15A-A-146 Equipt. Arrgt. Schematic Elevation 15A-A-147 Equipt. Arrgt. Cell #1 Plans 15A-A-148 Equipt. Arrgt. Cell #2 Schematic 15A-A-149 Equipt. Arrgt. Cell #2 Plans 15A-A-150 Equipt. Arrgt. Cell #3 Schematic 15A-A-151 Equipt. Arrgt. Cell #3 Plans 15R-A-163 Equipt. Arrgt. Lower Warm Aisle 15A-A-156 Liquid Waste Cell Plan 3.0 Equipment 3.1 'Bechtel f
3.1.1 4C-1 Partition Cycle Extraction Column 4C-2 Partition Cycle Partition Column 4C-3 Partition Cycle Pu Scrub Column
{
4C-4 Partition Cycle Strip Column 4C-7 Pu Cycle Extraction Column 4C-8 Pu Cycle Stric Column 4C-9 lst U Cycle Extraction Column 5}7 p'5'6 4C-10 1st U Cycle Strip Column
~
4C-ll 2nd U Cycle Extraction Column 4C-12 2nd U Cycle Strip Column Drawinas 4A-C-2 Pulse Columns 4C-1,2,4,9,10,ll.. 'Rechtel) 4A-C-3 Pulse Columns 4C-3,7&8 (Bechtel) 4A-C-4 Pulse Columns Details (Bechtel) 4A-C-5 Pulse Columns Details (Bechtel) 4A-C-6 Pulse Columns Orient, and Details (Bechtel) l l
1
}
DRAFT MAY 1979 15E-D-5 Stub Nozzle Detail (Bechtel) 15E-D-6 Name Plate Detail (Bechtel) 4C-1-1 Welding Procedures (Vendor) 4C-1-2 Welding Qualification (Vendor) 4C-1-3 Fabrication of Shells & Trays (Vendor) 4C-1-4 Misc. Details 4C-2 (Vendor) 4C-1-5 Perforated Decks (Vendor) 4C-1-6 General Arrg't (Vendor) 4C-1-7 General Arrg't (Vendor) 4C-1-8 Perforated Decks (Vendor) 4C-1-9 Fab. of Shell & Tray Decks (Vendor) 4C-1-10 General Arrg't 4C-7 (Vendor) 4C-1-11 General Arrg't 4C-8 (Verdor) 4C-1-12 General Arrg't 4C-9 & 11 (Vendor) 4C-1-13 Miscellaneous Details (Vendor) 4C-1-14 Perforated Decks (Vendor) 4C-1-15 Test Plate Details (Vendor) 4C-1-16 Misc. Details (Vendor) 4C-1-17 General Arrg't 4C-10 & 12 (Vendor) 4C-1-18 Misc. Details (Vendor) 4C-1-19 General Arrg't 4C-4 (Vendor) 4C-1-20 Misc. Details 4C-1 (Vendor) 4C-1-21 General Arrg't 4C-1 (Vendor) 4C-1-22 Test Report (Vendor) 4C-1-26 Test Report (Vendor) 4C-1-27 Test Report (Vendor) 4C-1-30 Poison Plates Details (Vendor) 4C-1-31 Poison Plates Details (Vendor) 4C-1-32 Poison Plates Details-(Vendor) 4C-1-33 Poison Plates Details (Vendor) 4C-1-34 Poison Plates Details (Vendor)
'4C-1-35 Mill Test Reports (Vendor) 4C-1-36 Misc. Details 4C-7 (Vendor) 4C-1-37 Misc. Details 4C-8 (Vendor) 4C-I-38 Misc. Details 4C-3 (Vendor) 4C-1-39 Test Reports Boron (Vendor) 4C-1-40 Test Report 4C-1 (Vendor) 4C-1-41 Test Report 4C-1 (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrom-Nickle SS Equipment 4413-C-502 Fabrication of Pressure Vessels 4413-C-504 Documents Required Material Requisition 4413-4C-1 Pulse Columns 51/
057
bRAFT MAY 1979.
3.1.2 4C-13A Partition Cycle Feed Pump Pot 4C-13B Partition Cycle Feed Pump Pot Drawings 4B-C-7 Partition Cycle Feed Pump Pots (Bechtel) 15C-4-3 Elevation Details (Vendor) 15C-4-35 Name Plate 4C-13A (Vendor) 15C-4-36 Name Plate 4C-138 (Vendor)
Specifications 4413-A-1 General 4413-C-2 Stainless Steel Equip.
Material Reauisition 4413-15C-4 Pump Pots 3.1. 3 4C-14 Pulser Air Receiver Drawings 4K-6-3 AirReceiver(Vendor)
Specifications 4413-A-1 General 4413-K-3 Pulser Air Compressor Material Requisition 4413-4K-6 Air Receiver 3.1.4 4C-15 Pulse Column Air Reservoir 4C-1 4C-16 Pulse Column Air Reservoir 4C-2 4C-17 Pulse Column Air Reservoir 4C-3 4C-18 Pulse Column Air Reservoir 4C-4 4C-19 Pulse Column Air Reservoir 4C-7 4C-20 Pulse Column Air Reservoir 4C-8 4C-21 Pulse Column Air Reservoir 4C-9 4C-22 Pulse Column Air Reservoir 4C-10 4C-23 Pulse Column Air Reservoir 4C-ll 4C-24 Pulse Column Air Reservoir 4C-12 D_rawings 4B-C-8 Pulse Column Air Reservoir (Bechtel) 4C-8-1 General Arrg't & flotes (Vendor) 4C-8-2 General Arrg't & flotes (Vendor) 4C-8-3 Welding Spec (Vendor)
K64-323-1 thru 10 Code Certification (Vendor)
]
0Y t
DRAFT MAY 1979 Specifications 4413-A-1 General 4413-C-502 Fabrication of Pressure Vessels 4413-C-504 Document Reg'd for Pressure Material Recuisition 4413-4C-8 CS Air Reservoirs 3.1.5 4C-25 Pulser Air Compressor Dampener Drawings 15B-C-1 Air Compressor Dampeners (Bechtel) 15C-9-6 Elevation Sections (Vendor) 15C-9-4 Data Sheets (Vendor) 15C-9-9 Welding Procedure (Vendor)
Specifications 4413-A-1 General 4413-C-502 Fabrication of Pressure Vessels 4413-C-504 Documents Req'd for Vessels
. Material Requisition.
4413-15C-9 CS Vessels & Tanks 3.1.6 40-1 Partition Cycle Feed Tank Drawings 4B-D-2 Partition Cycle Feed Tank (Bechtel) 15D-17-1 Data Sheet (Vendor) 15D-17-27 Plans & Elevations (Vendor) 150-17-28 Misc. Details (Vendor) 15D-17-29 Helium Test Procedure (Vendor) 15D-17-30 Surface Preparation (Vendor) 15D-17-31 Fabrication Tolerances (Vendor) 15D-17-32 Material' Testing Req'd (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrom. Nickle SS Equipt 4413-X-1 Surface Preparation 4413-C-504 Doc. Req'd for Vessels Material Requisition 517 0M 4413-15D-17 SS Process Tanks
DRAFT l
~
MAY 1979 l 3.1.7 4D-2 Part. Cycle Waste Catch Tank Drawings 4B-D-3 Part. Cycle Waste Catch Tank (Bechtel) 150-17-23 Plans & Elevations (Vendor) 15D-17-24 Misc. Details (Vendor) 15D-17-25 Helium Leak Test (Vendor) 15D-17-26 Fabrication Tolerances (Vendor) 150-17-36 Material Testing Reg'd (Vendor)
Specifications 4413-A-1 General 4413-C-2 SS Equipment 4413-X 1 Surface Preparation 4413-C-534 Doc. Req'd for Vessels -
Material Recuisition 4413-50-17 SS Process Tanks 3.1.8 40-6 Plutonium Cycle Feed Conditioner Drawings 4B-D-4 Pu Cycle Feed Conditioner (Bechtel) 15D-3-8 Details (Vendor) 15D-3-18 Stub Nozzle (Vendor) 15D-3-19 Plans & Elevations (Vendor) 150-3-26 Water Jacket (Vendor)
Specifications 4413-A-1 General 4413-C-502 SS Equipment 1413-C-504 Vessel Doc. Requirements Material Requi'_-i_ tion 4413-150-3 Pro.ess Vessels 3.1.9 40-8 Pu Cycle Wa<.te Catch Hold Tank Drawings 4B-D-5 Pu Cycle Waste Catch Tank (Bechtel)
~
15D-2-2 Plans & Elevations (Vendor)
Soecifications 4413-A-1 General 4413-C-2 SS Equipment 4413-C-504 Pressure Vessel Doc. Req'd Material Reauisition 5i7 0(30 4413-15D-2 SS Process Tanks
DRAFT MAY 1979 3.1.10 40-9 First U Cycle Feed Tank Drawings 4B-0-6 First U Cycle Feed Tank (Bechtel) 15D-3-20 Stub Nozzle Details (Vendor) 150-3-22 Sections & Details (Vendor) 15D-3-23 Elevations & General Notes (Vendor)
Soecifications 4413-A-1 General 4413-C-2 SS Equipment 4413-C-504 Doc. Reg'd for Pressure Vessels Material Requisition 4413-150-3 Process Vessels.
3.1.11 40-10 First U Cycle Catch Tank Drawings 4B-D-7 First U Cycle Waste Tank (Bechtel) 4B-D-9 Sections and Details (Bechtel) 150-2-9 Plans & Elevations (Vendor) 150-2-22 Sections & Details (Vendor)
Specifications 4413-A-1 General 4413-C-2 SS Equipment 4413-C-504 Doc. Req'd for Pressure Vessels Material Requisition 4413-150-2 SS Process Tanks 3.1.12 40-12 Second U Cycle Feed Tank Drawings 4B-D-6 Second U Cycle Feed Tank (Bechtel) 15D-3-21 Stub Nozzle Details (Vendor) 15D-3-23 Elevations & General Notes (Vendor)
Specifications 4413-A-1 Gene al 4413-C-2 SS Equipment 4413-C-504 Doc. Req'd for Pressure Vessels Material Reauistion 4413-15D-3 Process Vessels 3 j,/
O() }
DRAFT MAY 1979 3.1.13 4D-13 Second U Cycle Waste Tank Drawinas 4B-D-7 Second U Cycle Waste Tank (Bechtel) 48-D-9 Sections & Details (Bechtel) 15D-2-22 Sections & Details (Vendor) 15D-2-23 Test Reports (Vendor) 15D-2-25 As-Built Stub Nozzles (Vendor)
Speci ficatiolns 4413-A-1 General 4413-C-2 SS Equipment 4413-C-504 Doc. Req'd for Pressure Vessels Material Reouisition 4413-15D-2 SS Process Tanks 3.1.14 4E-4 First U Cycle Feed Cooler 4E-5 Second U Cycle Feed Cooler Drawings DS-4E-4 First U Cycle Feed Cooler (Bechtel)
DS-4E-b First U Cycle Feed Cooler (Bechtel) 15E-13-1 First U Cycle Feed Cooler (Vendor) 15E-13-2 Welding (Procedure (Vendor) 15E-13-3 Detail Vendor) 15E-13-4 Detail (Vendor) 15E-13-5 Detail (Vendor) 15E-13-6 Detail (Vendor) 15E-13-7 Detail (Vendor) 15E-13-8 Detail (Vendor) 15E-13-9 Tube Layout (Vendor) 15E-13-10 Construction Sheet (Vendor)
Soecifications 4413-A-1 General 4413-C-2 Stainless Steel Equipment 4413-E-1 Tubular Heat Exchangers Material Recuisition 4413-15E-13 SS Heat Exchangers 517 062
DRAFT
-MAY 1979 3.1.15 4E-1 Organic Feed Preheater 4E-2 First U Cycle Strip Feed Heater 4E-3 Second U Cycle. Strip Feed Heater Drawings DS-4E-1 Preheater 4E-l (Bechtel)
DS-4E-2 Preheater 4E-2 (Bechtel)
DS-4E-3 Preheater 4E-3 (Bechtel) 4P-44 Isometric 4E-1 (Bechtel) 4P-63 Isometric 4E-1 (Bechtel) 4P-151 Isometric 4E-2 (Bechtel) 4P-303 Iscmetric 4E-2 (Bechtel) 4P-302 Isometric 4E-3 (Bechtel) 4P-307 Isometric 4E-3 (Becht~el)
Specification As directed by Data Sheet.
Material Requisition Not applicable.
3.1.16. 4E-6 Pulser After-Cooler Drawing 3311-D-1 After-Cooler (Vendor)
Specification 4413-A-1 General 4413-C-2 Stainless Steel Equipment Material Requisition 4413-4 K-6 Pulser Air Compressor 3.1.17 4G-5 Partition Cycle Organic Feed Pump 4G-5A Partition Cycle Organic Feed Pump 4G-9 Partition Cycle Strip Feed Pump 4G-9A Partition Cycle Strip Feed Pump 4G-26 First U Cycle Organic Feed Pump 4G-26A First U Cycle Organic Feed Pump 4G-31 Second U Cycle Organic Feed Pump 4G-31A Second U Cycle Organic Feed Pump The original Allis Chalmers canned pumps were replaced with Crane Chempump canned pumps Model GB.
M7 063
DRAFT MAY 1979 -
3.1.18 4G-ll Instrument Air Line Seal Pump Drawings 4G-19-1 Parts List (Vendor) 4G-19-2 Pump Curve (Vendor) 4G-19-3 Installation (Vendor)
DS-4GM-ll Data Sheet (Sechtel)
DS-4G-11 s Data Sheet (Bechtel)
~
Soecifications 4413-A-1 General 4413-G-1 Pump Specification Material Requisition 4413-4G-19 Instrument Air Line Seal Pump 3.1.19 4G-33 Pu Extraction Column Feed Pump 4G-33A Pu Extraction Column Feed Pump Drawings DS-4G-33 Data Sheet (Bechtel) 15G-6-1 Pu Ext Col Feed Pump (Vendor) 15G-6-9 Motors for Remote Dia Pumps (Vendor) 15G-6-12 Cylinder Activator (Vendor) 15G-6-13 Instru & Parts List (Vendor) 15G-6-19 Install and 0p Instr (Vendor) 15G-6-23 Par.ts List (Vendor)
Soecifications 4413-A-1 General 4413-A-2 General 4413-G-1 Pump Specification Material Reauisition 4413 '.5G-6 Lapp Pumps 3.1.20 4H-1 Cleanout Eductor (4C-1 to 4X-1) 4H-2 Cleanout Eductor (4C-2 to 4C-3) 4H-3 Cleanout Eductor (4C-3 to 4D-6) 4H-4 Cleanout Eductor (4C-4 to 4Y-20) 4H-5 Transfer Eductor (40-1 to 4D-2) 4H-6 Transfer Eductor (4Y-1 to 4D-2) 4H-9 Transfer Eductor (4D-2 to 7D-8) 4H-10 Transfer Eductor (4D-2 to 7D-1) gy 064
DRAFT MAY 197') 4H-ll Transfer Eductor (4D-2 to 70-1) 4H-12 Transfer Eductor (40-2 Catch to Hold) 4H-13 Transfer Eductor (4D-2 Catch to Hold) 4H-31 Transfer Eductor (40-9 to 40-10) 4H 32 Transfer Eductor (4D-10 to 70-2) 4H-33 Transfer Eductor (40-10 to 7D-2) 4H-34 Transfer Eductor (4D-10 to 7D-8) 4H-35 Transfer Eductor (4D-10 Catch to Hold) 4H-36 Transfer Eductor (40-10 Catch to Hold) 4H-3" Transfer Eductor (4X-9 to 40-10) 4H-38 Transfer Eductor (4C-9 to 4Y-25) 4H-39 Transfer Eductor (4C-10 to 4Y-27) 4H-41 Transfer Eductor (40-12 to 4D-13) 4H-42 Transfer Eductor (4D-13 to 5D-2) 4H-43 Transfer Eductor (40-13 to 3D-2) 4H-44 Transfer Eductor (4D-13 to 7D-8) 4H-45 Transfer Eductor (4D-13 Catch to Hold) 4H-46 Transfer Eductor (4D-13 Catch to Hold) 4H-47 Transfer Eductor (4X-Il to 40-12) 4H-50 Transfer Eductor (4X-12.to 4D-13) 4H-51 Transfer Eductor (40-8 to ~70-2) 4H-52 Transfer Eductor (4D-13 Catch to Hold) 4H-54 Transfer Eductor (4D-8 Catch to Hold) 4H-55 Transfer Eductor (4D-8 Catch to Hold)
Drawings DS-4H-1 Data Sheet (Bechtel)
DS-4H-2 Data Sheet (Bechtel)
DS-4H-3 Data Sheet (Bechtel)
DS-4H-4 Data Sheet (Bechtel)
DS-4H-5 Data Sheet (Bechtel)
DS-4H-6 Data Sheet (Bechtel)
DS-4H-7 Data Sheet (Bechtel)
DS-4H-8 Data Sheet (Bechtel)
DS-4H-9 Data Sheet (Bechtel)
DS-4H-10 Data Sheet (Bechtel)
DS-4H-ll Data Sheet (Bechtel)
DS-4H-12 Data Sheet (Bechtel)
DS-4H-13 Data Sheet (Bechtel)
DS-4H-14 Data Sheet (Bechtel)
DS-4H-15 Data Sheet (Bechtcl) 15H-1-2 Eductor Schedule (Vendor) 15H-1-3 Eductor Schedule (Vendor) 15H-1-4 Eductor Schedule (Vendon )
15H-1-5 Special Low Press Drop (Vend >r) 15H-1-6 Special Rate Eductors (Vendor) 15H-1-7 Rate Jet Curve (Vendor) 15H-1-8 Eductor Schedule (Vendor) 51/
065
DRAFT MAY 1979
_ Decifications 4413-A-1 General 4413-C-2 Stainless Steel Equipment e
4413-W-501 Visual Quality of Welds Material Recuisition 4413-15H-1 Process Eductors 3.1.21 4K-1 Pulser Air Compressor Drawings DS-4K-1 Data Sheet (Bechtel)-
4K-6-2 Foundation Plan (Vendor) 4K-6-4 Air Filter (Vendor) 4K-6-5 Wiring Diagram (Vendor) 4K-6-6 Foundation Instructions (Vendor) 4K-6-7 Bed Plate (Vendor) 4K-6-8 Temp Shutdown Switch (Vendor) 4K-6-10 Well for Thermostat (Vendor) 4 K-6-ll Condensate Trap (Vendor) 4K-6-12 Motor Driver (Vendor) 4K-6-14 Unbalanced Forces on Foundation (Vendor) 4K-6-15 Instrument List (Vendor)
Soecifications 4 13-A-1 General 4413-K-3 Pulser Air Compressor Material Requisition 4413-4K-6 Air Compressor 3.1.22 4V-1 Partition Extraction Column Pulser 4V-2 Partition Extraction Column Pulser 4V-3 Part. Pu Scrub Column Pulser 4V-4 Part. Strip Column Pulser 4V-5 Pu Cycle Ext. Column Pulser 4V-6 Pu Cycle Ext. Column Pulser 4V-7 First U Cycle Extraction Pulser 4V-0 First U Cycle Extraction Pulser 4V 9 Second U Cycle Extraction Pulser 4k-10 Second U Cycle Extraction Pulser 4V-!2 Spare Pulser Sl/
066
DRAFT MAY 1979 Drawings 48-T-1 CPP f.ir Pulser Mech Assy (Bechtel) 48-T-2 CPP Air Pulser Mech Assy Mount (Bechtel) 48-T-3 CPP Air Pulser Pivot Arm (Bechtel) 4B-T-4 CPP Air Pulser Cam Details (Bechtel) 4B-T-5 Air Pulser Solenoid (Bechtel) 58-T-6 Poppet Valve Details (Bechtel) 35-595A Valve Shutoff Manual (Vendor) 110061 Installation Manual (Vendor) 6-3017-2 Inst Manual Motor Drive (Vendor) 14E-B-323 Air Pulser Mod Sketch (Bechtel) 14E-E-324 Air Pulser Mod Sketch (Bechtel) 35-394-A Valve Air Shutoff (Vendor)
R-002-3 Rotalarm Actuator (Vendor) 14B-B-303 Revised Air Pulser D'etails (flFS) 14B-B-304 Revised Air Pulser Assy (NFS) 14C-B-308 Revised Air Pulser Cam (f4FS) 14E-B-324 Air Pulser Modification (NFS) 14E-B-337 Revisions for Pulsers (NFS) 14C-T-352 Pulser Casting (NFS) 14B-T-354 Air Pulser (NFS) 14E-T-402 Pulser Moutning Base (NFS) 148-D-599 Air Pulser Tappet Soecifications 4413-A-1 General 4413-C-2 Stainless Steel Specification Material Requisition 4413-4V-63 Air Pulsers 3.1.23 4Y 4C-1 Aqueous Decanter 4Y 4C-7 Aqueous Decanter 4Y 4C-8 Aqueous Decanter 4Y 4C-9 Aqueous Decanter 4Y 4C-ll Aqueous Decanter 4Y 4C-12 Aqueous Decanter 4X-24 Measuring Fot 4C-9 4Y-28 Measuring Pot 4C-ll
'tY-32 Measuring Pot 4C-7 Drawings 4A-D-1 Decanters 4X-1, 7, 8, 9,11,12 (Bechtel) 4B-D-8 Metering Pots 4Y-14, 24, 28, 32 (Bechtel) 15D-1-5 Decanters (Vendor) 15D-1-6 hetering Head Pots (Vendor) j}[
Ob
DRAFT MAY 1979 Soecifications 4413-A-1 General 4413-C-2 Stainless Steel Specification 4413-C-504 Documents Reg'd for Vessels Material Recuisition 4413-150-1 SS Decanters & Measuring Pots NOTE: The following items were field fabricated at the site to Bechtel field piping specifications and field requisitions.
3.1.24 4Y-5 HAP Surge Tank Drawings 4Y-5 Surge Tank (Bechtel) 4P-8
'Line Isometric (Bechtel) 4P-9 Line Isometric (Bechtel) 3.1.25 4Y-6 HBU Surge Tank Drawings 4Y-6 Surge Tank (Bechtel) 4P-44 Line Isometric (Bechtel) 4P-63 Line Isometric (Bechtel) 3.1.26 4Y-3 Phace Separator for 4D-1 Airlift Drawings 4Y-13 Phase Separator (Bechtel) 4P-8 Line Isometric (Bechtel) 4P-9 Line Isometric (Bechtel) 3.1.27 4Y-14 Measuring Head Pot for 4C-1 Feed Drawings 4P-4 Line Isometric (Bechtel) 4P-5 Line Isometric (Bechtel) 4P-10 Line Isometric (Bechtel) 4P-541 Line Isometric (Bechtel)
<)l O n'
DRAFT MAY 1979 3.1.28 4Y-15 Level Control Pct for 4C-1 Drawings 4Y-15 Level Control Pot (Bechtel) 4P-ll Line Isonetric (Bechtel) 4P-12 Line Isometric (Bechtel) 3.1.29 4Y-17 Level Control Pot for 4C-2 Drawings 4Y-17 Level Control Pot (Bechtel) 4P-37 Line Isometric (Bechtel) 4P-38 Line Isometric (Bechtel) 3.1.30 4Y-19 Level Control Pot for 4C-3 Drawings 4Y-19 Level Control Pot (Bechtel) 4P-49 Line Isometric (Bechtel) 4P-52 Line Isometric (Bechtel) 3.1.31 4Y-20 Level Control Pot for 4C-4 Drawings 4Y-20 Level Control Pot (Bechtel) 4P-58 Line Isometric (Bechtel) 4P-59 Line Isometric (Bechtel) 3.1.32 4Y-21 IAU Surge Tank Drawings 4Y-22 Surge Tank (Bechtel) 4P-179 Line Isometric (Bechtel) 4P-180 Line Isometric (Bechtel) 3.1.33 4Y-22 IDU Surge Tank Drawinas 4Y-22 Surge Tank (Bechtel) 4P-269 Line Isometric (Bechtel) 4P-270 Line Isometric (Bechtel) b i '~
Ob/
DRAFT MAY 1979 3.1.34 4Y-25 Level Control Pot for 4C-9 Drawings 4Y-25 Level Control Pot (Bechtel) 4P-173 Line Isometric (Bechtel) 4P-174 Line Isometric (Bechtel) 3.1.35 4Y-27 Level Control Pot for 4C-10 Orawings_
4P-202 Line Isometric (Bechtel) 4P-203 Line Isometric (Bechtel) 3.1.36 4Y-29 Level Control Pot:for 4C-ll Drawings 4P-259 Line Isometric (Bechtel) 4P-260 Line Isometric (Bechtel) 3.1.37 4Y-31 Level Control Pot for 4C-12 a
Drawings 4P-293 Line Isometric (Bechtel) 4P-294 Line Isometric (Bechtel) 3.1.38 4Y-33 Level Control Pot for 4C-7 Drawings 4P-342 Line Isometric (Bechtel) 4P-345 Line Isometric (Bechtel) 3.1.39 4Y-35 Level Control Pot for 4C-8 Drawings _
4P-390 Line Isometric (Bechtel) 4D-393 Line Isometric (Bechtel)
S1/
070 k
DRAFT MAY 1979 3.1.40 4Y-42 Phase Separator for 4H-2 Discharge to 4C-3 Drawings 4P-38 Line Isometric (Bechtel) 4P-56 Line Isometric (Bechtel) 3.1.41 4Y-54 Phast Separator HLW Sample Drawings 4P-435A Li.ie Isometric (Bechtel) 4P-662 Line Isometric (Bechtel) 3.1.42 4Y-56 Phase Separator ICW Sample Drawings 4P-198A Line Isometric (Bechtel) 4P-285 Line Isometric (Bechtel) 3.1.43 4Y-57 Phase Separator IEW Sample Drawings 4P-317A Line Isometric (Bechtel) 4P-283 Line Isometric (Bechtel) 3.1.44 4Y-45 Level Control Pot for 4D-6 Drawings SP-260 Line Isometric (Bechtel) 4P-376 Line Isometric (Bechtel) 3.2 11FS 3.2.1 4C-12A Diluent Wash Column Drawings D-1004 8" Diluent Wash Column (flFS)
D-1005 Detail of 18" Section (flFS)
D-1015 20" Air Reservoir (ilFS)
D-1016 Field Erection (flFS)
B-1017 6" Control Pot (liFS)
B-SK-1019 Line from Column 4G12A (f1FS)
B-1017 6" Disengaging Pot (ilFS)
SKB-1032 3" Vent Pots (flFS)
SKB-1046 In-Cell Piping 4C-12A (f(FS) g}j Uik 7
f DRAFT MAY 1979
- Soacifications As specified on drawings.
Material Reauisition N.A.
3.3 General B-1000 Dilvent Wash Mat'l Bal (NFS)
D-1001 P&ID Diluent Wash (NFS)
D-1011 Detail of Diluent Run Tank (NFS)
D-1012 8" Steam Stripper (NFS)
B-1013 Solvent Distillation Matl Eal (UFS)
D-1014 16' Decanter Tank (NFS)
B-SK-1018 Detail of Steam Column (flFS)
B-SK-1022 Schematic for Decanter (NFS)
C-1024 1-1/2" Super Heater (dFS)
B-1027 6" Disengaging o t 4Y-138 (NFS) c D-1028 Mounting of Steam Condenser (flFS)
SKB-1041 Steam & Jet Line to 4C-12A (NFS)
SKB-1042 Steam & Air Line in Cell (NFS)
D-1044 Assem. & Paping of Pulser Unit (NFS)
C-1045 Diluant Wash Schematic (NFS) 4E-D-229 Raschig Ring Corrosion Spec Holder (NFS)
[] { /
O
.