Responds to NRC Re Violations Noted in IE Insp Repts 50-277/79-04 & 50-278/79-03.Corrective Actions:Test Procedures & Tests Completed & Addl Mgt Controls Implemented
ML19241B131
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/30/1979
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19241B125 List:
References
NUDOCS 7907110719
Download: ML19241B131 (2)


Text

.

PHILADELPHI A ELECTRIC COM PANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 SHILLOS L D ALTROFF ELEC RC O

C ION April 30, 1979 Re:

Docket Nos. 50-277 50-278 inspection No. 50-277/79-04 50-273/79-03 Mr. Boyce H.

Grier, Director U.S.

Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Grier:

Your letter of February 22, 1979, forwarded combined Inspection Reports 50-277/79-04 and 50-273/79-03.

Appendix A addresses an item of non-compliance concerning implementation of test procedures on heat and smoke detectors.

On March 12, 1979, a response was submitted to your uffice in reference to this item.

The response stated at the time that Technical Specification Amendment No.

39 became effective"... procedures for testing smoke and heat detectors had been written and approved by PORC.

It also stated that all Technical Specification r21ated tests had been completed by January 22, 1979.

During a complete review of the fire system surveillance testing program, it was discovered that the t h re e heat detectors located in the HPCI rooms on both units had not been tested once every six months in accordance with Technical Specification 4.14.B.l.d.

This situation was pronptly rectified with the approval of the required test procedures, and the completion of the tests on March 23, 1979.

The review revealed no other deficiencies in this area.

The additional management controls 308 002 7907110719

a' Mr. Boyce H.

Grier Page 2 referred co in our response of March 12, 1979, will preclude future occurrences of this nature.

Should you require any additional information on this subject, plea:e do not hesitate to contact us.

Very t ru ly yours,

../

-v l

308 003

s a aseg a

.g UNITED STATES o

NUCLEAR REGULATORY COMMisslON y B, i *g

4' C /, t WASHINGTON, D. C. 20555 0 ?*OU

((

%, '.s R. $

4 Mr. J. A. Jones Executive Vice Presideat Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street,f4W Washington, D. C.

20036 John J. Burney, Jr., Es

.e Burney, Burney, Sperry a Barefoot 110 florth Fifth Avenue Wilmington, tiorth Carolina 28401 Southport - Brunswick County Library 109 W. Moore Street Southport, fiorth Carolina 28461 Docket File G. Knighton M UtC PDR' A. Schwencer Local PDR D. Ziemann

'#\\

tiRR Rdg P. Check ORB #3 Rdg G. Lainas H. Denton D. Davis E. Case OELD V. Stello 01&E (3) i D. Eisenhut S. Sheppard i

B. Grimes Project Manager R. Vollmer ACRS (16)

T. Ippolito

?;RC Participants R. Reid TERA V. ficonan J. Buchanan 308 006

.