U.S. flVCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 99900070/79-01 Program No. 51300 Company:
Associated Piping and Engineering Corporation 1707 West Compton Boulevard Compton, California Inspection Conducted: April 2-5, 1979 Inspector h((
rduM S/77 H. W. Roberds, Contractor Inspector, Vendor Y Dath
/
Inspection Branch Approved by:
h//
virMd0
[2d/77 D. M. Hunnicutt, Chief, ComponentsSection II, Datd Vendor Inspection Branch Sunmary Inspection on April 2-5~, 1979 (99900070/79-01)
Areas Inspected:
Implementation of 10 CFR 50, Appendix B criteria and applicable Codes and/or standards including actions on previous inspection findings, qualification of nondestructive examination personnel, nondestruc-tive examination (liquid penetrant), nondestructive examination (radiography) and nondestructive examination (magnetic particle). The inspection involved twenty-eight (28) inspector-hours on site.
Resul ts:
In the five (5) areas inspected, no apparent deviations or unresolved items were identified.
Oh 3\\\\
m p ? M V n; Details A.
Persons Contacted
- H. A. Anderson, Executive Vice President
- R. L. Jordan, Quality Assurance Manacar M. Shanklin, Engineering Manager
- A.
A. Schwarz, Assistant to the Executive Vice President T. R. Duckworth, Chief Inspector
- Denotes those attending the exit interview.
B.
Actions on Previous Inspection Findings (Closed) Deviation (Inspection Report No. 78-02):
Reaudit of areas found deficient during internal audit not performed.
The inspector verified that the required follow-up audits had been performed and a review of the internal audit file did not reveal a similar discrepancy.
C.
Qualification of Nondestructive Examination Personnel 1.
Objectives The objectives of this area of the inspection were to verify that:
a.
The employer, Associated Piping and Engineering Company (AP&E), has developed a written practice for control and administration of NDE personnel training, examination and certification.
b.
Personnal records are complete and are current.
c.
Personnel performing nondestructive examinations have current eye examinations as defined in SNT-TC-1A.
2.
Method of Accomplishment The preceding objectives were ar.:omplished by:
a.
Review of Section 6.0 of the QA Manual, Revision 0, "Non-destructive, Visual and Dimensionai Examination."
b.
Review of Standard Practice Procedure SPP0-601, "Nondestruc-tive Examination Personnel Qualification."
3)
/-
. c.
Review of six (6) personnel certification and qualification record packages including results of eye examinations.
d.
Interviews with cognizant personnel.
3.
Findings Within this area of the inspection, no deviations from canmitments or unresolved items were identified.
D.
Nondestructive Examination (Liquid Penetrant) 1.
Objectives The objectives of this area of the inspection were to verify that:
a.
Nondestructive examination is performed in accordance with approved procedures.
b.
Nondestructive examination procedures meet the requirements of Section V of the ASME Code.
c.
Test results are interpreted by qualified personnel.
2.
Method of Accomplishnent The preceding objectives were accomplished by:
a.
Review of Section 6.0 af the QA Manual, Revision 0, "Non-destructive, Visual, and Dimensional Examination."
b.
Review of Standard Practice Procedure SPPQ-201, Revision 0, dated January 10,1977, " Liquid Penetrant Examination."
c.
Observation of an in-process penetrant inspection on Job No.
F-20137-A, S/N I-7662.
d.
Interviews with cognizant personnel.
3.
Findings Within this area of the inspection, no deviation from commitments or unresolved items were identified.
311 211
_4-E.
Nondestructive Examination (Radiography) 1.
Objectives The objectives of this area of the inspection were to verify that:
a.
Nondestructive examination is performed in accordance with approved procedures.
b.
Nondestructive examination procedures meet the requirements of Section V of the ASME Code.
c.
Test results are interpreted by qualified personnel.
2.
Method of Accomplishment The preceding objectives were accomplished by:
a.
Review of Section 6.0 of the QA Manual, Revision 0, "Non-destructive, Visual, and Dimensional Examination."
b.
Review of Standard Practice Procedure SPPQ-501, Revision 4 of August 18,1978, " Radiographic Examination."
c.
Observation of radiography being performed on Job No.
d.
Review of nine (9) production radiographs on Job No. F-20137, S/N J-7664.
e.
Interviews with cognizant personnel.
3.
Findings Within this area of the inspection, no deviations from commitments or unresolved items were identified.
F.
Nondestructive Examination (Macnetic Particle) 1.
Objectives The objectives of this area of the inspection were to verify that:
a.
Nondestructive examination is performed in accordance with approved procedures.
311 212
. b.
Nondestructive examination procedures meet the requirements of Section V of the ASME Code, c.
Test results are interpreted by qualified personnel.
2.
Method of Accomplishment The preceding objectives were accomplished by:
a.
Review of Section 6.0 of the QA Manual, Revision 0, "Non-destructive, Visual, and Dimensional Examination."
b.
Review of Standard Practice Procedure SPPQ-301, " Magnetic Particle Examinatior.."
c.
Examination of calibration status of magnetic particle test equipment.
3.
Findings Within this area of the inspection, no deviations from commitments or unresolved items were identi'ied.
G.
Exit Meeting The inspector met with the management representatives denoted in para-graph A above on April 5,1979, at the conclusion of the inspection.
The scope of the inspection was discussed with the management repre-
.sentatives present.