ML19239A170

From kanterella
Jump to navigation Jump to search
NUREG/CP-0312, Proceedings of the Radon Barriers Workshop
ML19239A170
Person / Time
Issue date: 08/31/2019
From: Arit H, Benson C, Mark Fuhrmann, Waugh J, Mike Williams
Office of Nuclear Regulatory Research, Navarro Research and Engineering, Univ of California - Berkeley, University of Virginia
To:
Meyd D
References
NUREG/CP-0312
Download: ML19239A170 (233)


Text

NUREG/CP-0312 Proceedings of the Radon Barriers Workshop July 25-26, 2018 NRC Headquarters, Rockville, MD Office of Nuclear Regulatory Research

AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material Non-NRC Reference Material As of November 1999, you may electronically access Documents available from public and special technical NUREG-series publications and other NRC records at libraries include all open literature items, such as books, NRCs Library at www.nrc.gov/reading-rm.html. Publicly journal articles, transactions, Federal Register notices, released records include, to name a few, NUREG-series Federal and State legislation, and congressional reports.

publications; Federal Register notices; applicant, Such documents as theses, dissertations, foreign reports licensee, and vendor documents and correspondence; and translations, and non-NRC conference proceedings NRC correspondence and internal memoranda; bulletins may be purchased from their sponsoring organization.

and information notices; inspection and investigative reports; licensee event reports; and Commission papers Copies of industry codes and standards used in a and their attachments. substantive manner in the NRC regulatory process are maintained at NRC publications in the NUREG series, NRC regulations, The NRC Technical Library and Title 10, Energy, in the Code of Federal Regulations Two White Flint North may also be purchased from one of these two sources. 11545 Rockville Pike Rockville, MD 20852-2738

1. The Superintendent of Documents U.S. Government Publishing Office These standards are available in the library for reference Washington, DC 20402-0001 use by the public. Codes and standards are usually Internet: bookstore.gpo.gov copyrighted and may be purchased from the originating Telephone: (202) 512-1800 organization or, if they are American National Standards, Fax: (202) 512-2104 from American National Standards Institute
2. The National Technical Information Service 11 West 42nd Street 5301 Shawnee Road New York, NY 10036-8002 Alexandria, VA 22312-0002 www.ansi.org www.ntis.gov (212) 642-4900 1-800-553-6847 or, locally, (703) 605-6000 Legally binding regulatory requirements are stated only in A single copy of each NRC draft report for comment is laws; NRC regulations; licenses, including technical available free, to the extent of supply, upon written specifications; or orders, not in NUREG-series publications.

The views expressed in contractor prepared publications in request as follows:

this series are not necessarily those of the NRC.

Address: U.S. Nuclear Regulatory Commission The NUREG series comprises (1) technical and Office of Administration administrative reports and books prepared by the staff (NUREG-XXXX) or agency contractors (NUREG/CR-XXXX),

Multimedia, Graphics, and Storage &

(2) proceedings of conferences (NUREG/CP-XXXX),

Distribution Branch (3) reports resulting from international agreements Washington, DC 20555-0001 (NUREG/IA-XXXX),(4) brochures (NUREG/BR-XXXX), and E-mail: distribution.resource@nrc.gov (5) compilations of legal decisions and orders of the Facsimile: (301) 415-2289 Commission and Atomic and Safety Licensing Boards and of Directors decisions under Section 2.206 of NRCs regulations (NUREG-0750).

Some publications in the NUREG series that are posted at NRCs Web site address www.nrc.gov/reading-rm/ DISCLAIMER: This report was prepared as an account doc-collections/nuregs are updated periodically and may of work sponsored by an agency of the U.S. Government.

differ from the last printed version. Although references to Neither the U.S. Government nor any agency thereof, nor any employee, makes any warranty, expressed or implied, material found on a Web site bear the date the material or assumes any legal liability or responsibility for any third was accessed, the material available on the date cited partys use, or the results of such use, of any information, may subsequently be removed from the site. apparatus, product, or process disclosed in this publication, or represents that its use by such third party would not infringe privately owned rights.

NUREG/CP-0312 Proceedings of the Radon Barriers Workshop July 25-26, 2018 NRC Headquarters, Rockville, MD Manuscript Completed: June 2019 Date Published: August 2019 Prepared by: Mark Fuhrmann1, Craig Benson2, Jody Waugh3, Morgan Williams4, and Hans Arlt1 1 U.S. Nuclear Regulatory Commission 2 University of Virginia 3 Navarro Research and Engineering, Inc.

4 University of California Berkeley Mark Fuhrmann, NRC Project Manager Office of Nuclear Regulatory Research

ABSTRACT The Radon Barriers Project is a research program to study the effects of changes in the properties of in-service engineered earthen covers over uranium mill tailings as these covers age.

Field studies were conducted at four mill tailing disposal sites: Falls City in Texas, Bluewater in New Mexico, Shirley Basin South in Wyoming, and Lakeview in Oregon. Small areas on these sites were excavated, radon fluxes were measured, numerous observations were made, and samples were taken for a variety of parameters, such as saturated hydraulic conductivity, root counts, moisture, density, lead-210 concentrations, soil texture, structure, chemistry, and nematode counts.

On July 25-26, 2018, a one-and-a-half-day workshop took place at NRC Headquarters to discuss findings from the project with regard to the current state of the barriers and comparison to their as-built condition and natural analog sites, prediction of long-term evolution, monitoring approaches, and long-term implications. Presentations included detailed background and project findings on the following:

  • NRC and DOE/LM activities that led to the Radon Barriers Project
  • radon fluxes and their variability, radon diffusion coefficients, and radon travel times through the covers
  • hydraulic conductivity of the barriers at various depths and comparisons to hydraulic conductivity at nearby natural analog sites
  • ecological evolution of covers and the impact of vegetation on cover properties, especially on water percolation, radon flux, and evapotranspiration
  • soil architecture observations, including soil structure, biology, and chemistry
  • potential use of lead-210 as a long-term indicator of radon transport within barriers A facilitated discussion followed each presentation to discuss long-term evolution of the sites as suggested by the project findings, use of the findings for maintenance and prediction, future information needs, and policy implications.

iii

TABLE OF CONTENTS ABSTRACT .......................................................................................................................................... iii ABBREVIATIONS AND ACRONYMS ...............................................................................................vii 1 INTRODUCTION .............................................................................................................................1-1 1.1 Background .........................................................................................................................1-1 1.1.1 Regulations ................................................................................................................1-1 1.1.2 Overview of the Radon Barriers Project ....................................................................1-3 2 PRESENTATIONS ..........................................................................................................................2-1 2.1 Introductory Remarks .........................................................................................................2-1 2.1.1 Welcome by Ray Furstenau, Director of the NRC Office of Nuclear Regulatory Research ....................................................................................................................2-1 2.1.2 Remarks by Justin Marble from DOE/EM .................................................................2-1 2.2 A Timeline of NRC Activities on Engineered Surface Barriers Used at Disposal Sites for Radioactive Material ......................................................................................................2-2 2.2.1 Abstract ......................................................................................................................2-2 2.2.2 Presentation ...............................................................................................................2-3 2.3 Engineered Covers for UMTRCA Sites and DOE/LMs Projects ....................................2-13 2.3.1 Abstract ....................................................................................................................2-13 2.3.2 Presentation .............................................................................................................2-15 2.3.3 Question and Answer Session for: Engineered Covers for UMTRCA Sites and DOE/LMs Projects. .................................................................................................2-56 2.4 The Radon Barriers Project Objectives, Test Conditions, and Plant Ecology .................2-57 2.4.1 Abstract ....................................................................................................................2-57 2.4.2 Presentation .............................................................................................................2-59 2.4.3 Question and Answer Session for: The Radon Barriers Project Objectives, Test Conditions, and Plant Ecology.................................................................................2-84 2.5 Cover Soil Development and Changes in Engineering Properties..................................2-86 2.5.1 Abstract ....................................................................................................................2-86 2.5.2 Presentation .............................................................................................................2-88 2.5.3 Question and Answer Session for: Cover Soil Development and Changes in Engineering Properties. .........................................................................................2-105 2.6 Field Evaluation of Radon Fluxes from Radon Barriers at In-Service Uranium Mill Tailings Disposal Facilities...............................................................................................2-109 2.6.1 Abstract ..................................................................................................................2-109 2.6.2 Presentation ...........................................................................................................2-111 2.7 Radon Diffusion Coefficients ..........................................................................................2-132 2.7.1 Abstract ..................................................................................................................2-132 2.7.2 Presentation ...........................................................................................................2-134 2.7.3 Question and Answer Session for: Field Evaluation of Radon Fluxes from Radon Barriers at In-Service Uranium Mill Tailings Disposal Facilities, and Radon Diffusion Coefficients .................................................................................2-140 2.8 A Survey of Soil Morphology and Process with Implications to Long-Term Performance at Four UMTRCA Sites .............................................................................2-143 2.8.1 Abstract ..................................................................................................................2-143 2.8.2 Presentation ...........................................................................................................2-144 2.8.3 Question and Answer Session for: A Survey of Soil Morphology and Process with Implications to Long-Term Performance at Four UMTRCA Sites. ................2-178 v

2.9 Can Lead-210 Be Used to Indicate Long-Term Radon-222 Transport in Radon Barriers?..........................................................................................................................2-180 2.9.1 Abstract ..................................................................................................................2-180 2.9.2 Presentation ...........................................................................................................2-182 2.9.3 Questions and Answers Session for: Can Lead-210 Be Used to Indicate Long-Term Radon-222 Transport in Radon Barriers? ..........................................2-194 3 NEXT STEPS ..................................................................................................................................3-1 3.1.1 Presentation ................................................................................................................3-1 3.1.2 Discussion ...................................................................................................................3-2 4 REFERENCES ................................................................................................................................4-1 WORKSHOP ATTENDEES ...................................................................................... A-1 vi

ABBREVIATIONS AND ACRONYMS ACAP Alternative Cover Assessment Program ADAMS Agencywide Documents Access and Management System Bq/m2-s becquerel(s) per meter square per second CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CNWRA Center for Nuclear Waste Regulatory Analysis DOE U.S. Department of Energy ECTG Engineered Covers Technical Group EM Office of Environmental Management (DOE)

EPA U.S. Environmental Protection Agency ET evapotranspiration Ksat field-saturated hydraulic conductivity Ks field-saturated hydraulic conductivity LFRG Low-Level Waste Disposal Facility Federal Review Group LM Office of Legacy Management (DOE)

LTS&M long-term surveillance and maintenance m2 square meter(s) m2/s square meter(s) per second m/s meter(s) per second NMSS Office of Nuclear Material Safety and Safeguards NRC U.S. Nuclear Regulatory Commission UMTRCA Uranium Mill Tailings Radiation Control Act of 1978 vii

1 INTRODUCTION The Radon Barriers Project (formally called Effectiveness of Surface Covers for Controlling Fluxes of Water and Radon at Disposal Facilities for Uranium Mill Tailings) is a research program created to study the effects of changes in the properties of in-service engineered earthen covers over uranium mill tailings as these covers age. On July 25-26, 2018, a one-and-a-half-day workshop on the Radon Barriers Project took place at U.S. Nuclear Regulatory Commission (NRC)

Headquarters to present and discuss findings from the project with regard to the current state of the barriers and comparison to their as-built condition, prediction of long-term evolution, monitoring approaches, and long-term implications. Participants included the project principal investigators and key team members; NRC staff from the Office of Nuclear Regulatory Research, the Office of Nuclear Material Safety and Safeguards, and the NRCs Region IV; and staff from the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Appendix A to this report lists the attendees.

The purpose of this study is to evaluate the effects of soil structure formation by abiotic and biotic processes on the hydraulic conductivity and gaseous diffusivity of radon barriers, how structural development varies with depth and thickness of the radon barrier, and how structure influences transmission of radon and seepage of water through radon barriers. This research is a collaboration between the DOE Office of Legacy Management (LM) and the NRC, with investigators at the University of Wisconsin, University of Virginia, University of California at Berkeley, and Navarro Research and Engineering Inc. (the DOE contractor). Additional support was provided by DOE/EM through the Consortium for Risk Evaluation with Stakeholder Participation (CRESP).

The research team visited four uranium mill tailing sites: Falls City in Texas, Bluewater in New Mexico, Shirley Basin South in Wyoming, and Lakeview in Oregon. Small areas on these sites were excavated, radon fluxes were measured, numerous observations were made, and samples were taken for a variety of parameters, such as saturated hydraulic conductivity, root counts, moisture, density, lead (Pb)-210 concentrations, soil texture, chemistry, and nematode counts.

These conference proceedings provide an extended abstract and the slides from each presentation, as well as key points from the discussions, which are summarized. In addition to results from this project, presentations often gave background information and discussed other related work at a number of sites to better define the context of the Radon Barriers Project.

1.1 Background

1.1.1 Regulations The NRC regulates uranium mill tailings under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Two types of sites are defined: (1) Title I sites are those that were inactive or no longer in use when UMTRCA was passed, and (2) Title II sites are those that were in use or issued a license after UMTRCA was passed. Currently, there are 21 Title I sites and 27 Title II sites, although more will be added over time.

1-1

Requirements for Title I sites in Title 40 of the Code of Federal Regulations (40 CFR) 192.02, Standards, Subpart A, Standards for the Control of Residual Radioactive Materials from Inactive Uranium Processing Sites, include the following:

Control of residual radioactive materials and their listed constituents shall be designed to: (a) Be effective for up to one thousand years, to the extent reasonably achievable, and, in any case, for at least 200 years, and, (b) Provide reasonable assurance that releases of radon-222 from residual radioactive material to the atmosphere will not: (1) Exceed an average release rate of 20 picocuries per square meter per second, or (2) Increase the annual average concentration of radon-222 in air at or above any location outside the disposal site by more than one-half picocurie per liter.

Provide reasonable assurance of conformance with [a number of] groundwater protection provisions.

Because the standard applies to design, monitoring after disposal is not required to demonstrate compliance with respect to 40 CFR 192.02(a) and (b). This average applies over the entire surface of the disposal site and over at least a 1-year period.

The NRC regulates Title II sites as stipulated in 10 CFR 40.28, General License for Custody and Long-Term Care of Uranium or Thorium Byproduct Materials Disposal Sites, with technical criteria in Appendix A, Criteria Relating to the Operation of Uranium Mills and the Disposition of Tailings or Wastes Produced by the Extraction or Concentration of Source Material from Ores Processed Primarily for Their Source Material Content, to 10 CFR Part 40, Domestic Licensing of Source Material. Title I sites are regulated under 40 CFR Part 192, Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings, and are licensed through 10 CFR 40.27, General License for Custody and Long-Term Care of Residual Radioactive Material Disposal Sites, to DOE or other Federal agencies. Additional information can be found at https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/mill-tailings.html and https://www.energy.gov/lm/articles/us-department-energy-office-legacy-management-2015-umtrca-title-i-and-title-ii-disposal.

Requirements in 10 CFR Part 40, Appendix A, for Title II sites include the following:

  • Criterion 1 states that the general design goal or broad objective in siting and design decisions is permanent isolation of tailings and associated contaminants by minimizing disturbance and dispersion by natural forces, and to do so without ongoing maintenance.
  • Criterion 4d requires a full, self-sustaining vegetative cover or rock cover to reduce wind and water erosion to negligible levels.
  • Criterion 5 incorporates ground water protections standards imposed by the U.S. Environmental Protection Agency (EPA) under 40 CFR Part 192, Subparts D and E, and Criterion 7 requires ground water monitoring.
  • Criterion 6 requires an earthen cover (or approved alternative) over wastes and that the site shall be closed in accordance with a design which provides reasonable assurance of control of radioactive hazards to (i) be effective for 1000 years, to the extent reasonably achievable, and in any case for at least 200 years, and (ii) limit release of radon (Rn)-222 from uranium byproduct materials, ....to the atmosphere so as not to exceed an average 1-2

release rate of 20 picocuries per meter square per second (pCi/m2 s) to the extent practicable throughout the effective design life determined pursuant to (1)(i) of this Criterion. The average release rate applies to the entire surface of each disposal area over a period of at least 1 year, but a period that is short compared to 100 years.

1.1.2 Overview of the Radon Barriers Project 1.1.2.1 Drivers and Objectives Hans Arlts presentation (see Section 2.2 of this volume) gave a timeline of the NRCs activities with regard to mill tailing covers. A major impetus for much of this work was NUREG/CR-7028, Engineered Covers for Waste Containment: Changes in Engineering Properties and Implications for Long-Term Performance Assessment, issued in December 2011. The report assesses the performance of engineered covers in terms of percolation of water through the covers at disposal sites that were not UMTRCA facilities. All of the covers documented in the report (27 test sections at 12 sites) were vegetated with a mixture of annual and perennial grass mixtures. No covers were studied with a riprap surface or without vegetative root systems.

Changes in cover hydraulic properties (saturated hydraulic conductivity and the alpha parameter for the soil water characteristic curve) both increased, indicating the formation of larger pores as a result of pedogenic processes such as wet-dry and freeze-thaw cycling. These changes were observed on materials that had been in place for time periods of 3.8 to 8.9 years.

The NRC established the Engineered Covers Technical Group (ECTG) to discuss and review the implications of NUREG/CR-7028. Their review is documented in Arlt et al. (2011), which noted that an important conclusion of the report is that compacted soil materials used in cover materials do not retain as built properties over the period of regulatory interest as assumed in most performance assessments. The properties of these materials change to values typical of surrounding soils within 5 to 10 years after installation. For some properties the change may be several orders of magnitude, which may potentially lead to increased water infiltration and augmented radon flux out of the system. However the sites discussed in that report were generally not uranium mill tailing sites and all were vegetated, whereas most mill tailing sites have rock covers.

No radon studies were conducted or reviewed for NUREG/CR-7028; in fact, few, if any, studies of radon emissions after the initial closure survey have been conducted at mill tailings disposal sites. However, that report showed that hydraulic conductivity of barrier materials increases over time. A reasonable inference is that radon emissions may also increase, as discussed in Chapter 5, Potential for Increased Radon Release due to Processes Documented in NUREG/CR-7028, of Arlt et al. (2011). The ECTG made a number of suggestions, and some of these evolved into the Radon Barriers Project.

1.1.2.2 Radon Barriers Project Sites The Radon Barriers Project team assembled a list of 24 sites that were evaluated as potential research sites using parameters, such as climatic influence, vegetation, barrier vulnerability, source activity, and NRC priority, derived from Arlt et al. (2011). Four sites were selected; Table 1 gives some of their general properties. Slides from Jody Waughs presentation on page 2-62 of this report show their locations. Pages 2-62 through 2-81 show climate information, images of the sites, test pit descriptions, and plant ecology information for each site.

1-3

Table 1. Radon Barriers Project Research Sites Waste Site Title Closure Cover Area Type of Waste Activity Date Acres Cover Tons (curies of radium-226)

Falls City I 1994 127 Veg 7,100,000 1277 Bluewater II 1995 354 main cell Rock 23,000,000 11200 Shirley Basin S II 2000 142 Veg 5,300,000 974 Lakeview I 1988 16 Rock/Veg 926,000 42 cubic yards Navarro Research and Engineering staff prepared an extensive field work plan document for the work to be conducted at each site. These plans include maps and cover diagrams and the field workflow for excavation, sampling, measurements, and site restoration to the original construction criteria. They also contain sections on safety and health, training requirements, and environmental management. The NRC staff conducted a National Environmental Policy Act review in accordance with NUREG-1748, Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, issued August 2003, and concluded that the actions were categorically excluded under 10 CFR 51.22(c)(6). As such, the NRC staff did not prepare an environmental assessment; a categorical exclusion checklist provided documentation. Field work was planned at analog sites for each location. If needed, a cultural resources survey (archeological reconnaissance (Phase III)) was conducted.

After completion of the field research, each pit was refilled with the various soil types that had been excavated and saved in separate piles. The radon barrier material was restored to the required density, and moisture content and a radon flux check was conducted. Closure reports were prepared Navarro Research and Engineering, documenting the test results to demonstrate that the excavations had been closed to the required criteria.

1-4

2 PRESENTATIONS 2.1 Introductory Remarks 2.1.1 Welcome by Ray Furstenau, Director of the NRC Office of Nuclear Regulatory Research I am the new, by about 3 weeks, director of the NRCs Office of Nuclear Regulatory Research. I came from DOE, and this work reminds me of some of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) work done at DOE sites. This is a jointly funded effort between DOE/LM and the NRC. Research dollars are limited, so this is a great example of a collaborative effort with the NRC on the regulatory side and DOE/LM, under Carmelo Melendez, with whom I worked quite a bit. I certainly like to see these things happen, and I understand that it has been pretty successful.

DOE/LM put out a newsletter with an article called, Got it Covered, Are Natural Processes Changing Engineered Disposal Cells? It is a very good article. It gets across why we are doing this sort of work. These are sites that were built with some assumptions about time frames that can go beyond human history, and so we need to validate these assumptions. Are these covers getting worse or getting better? The article shows pictures of some of you down in holes that you dug in these sites. Hopefully you replaced the dirt before you left. These are long-term effects, and they are probably different at each site. The weather is different, the hydrology is different, and the natural cover is different. So this is a timely workshop.

We want to have free-flowing discussions to really try to understand how these sites are behaving and how they may change over time. Is maintenance necessary or not necessary? What are the implications for long-term performance of these barriers? It is important not just for covers on uranium mill tailings, but in the DOE world it applies to CERCLA sites as well.

2.1.2 Remarks by Justin Marble from DOE/EM I am with the DOE/EM Office of Waste Disposal. DOE designs, constructs, operates, and ultimately closes waste disposal facilities under CERCLA and also for our unique, self-regulating role under DOE Order 435.1, Radioactive Waste Management, for the radioactive materials part of the waste. So covers do matter to LM and to EM.

Design of the cover is a crucial part of the document package submitted in order to get disposal authorization under DOE Order 435.1 to build and operate the disposal facility. Compliance is ensured in part through one of the groups I am involved with, the Low-Level Waste Disposal Facility Federal Review Group (LFRG). I am one of the co-chairs of this group, and Sherri Ross is the other co-chair. She came from the DOE Savannah River Site but now is at headquarters.

The two of us are the leads in LFRG for the DOE Order 435.1 process for the authorization of low-level radioactive waste disposal facilities. Covers play a large part in the review process.

Specifically, we have performance objectives for radon that we try to meet to the extent possible, during the institutional control period of 100 years and for the 1,000-year compliance period.

2-1

2.2 A Timeline of NRC Activities on Engineered Surface Barriers Used at Disposal Sites for Radioactive Material Presented by Hans Arlt Senior System Performance Analyst U.S. Nuclear Regulatory Commission 2.2.1 Abstract Engineered surface barriers help to isolate harmful waste and can be a risk-significant barrier at many disposal sites, including sites with uranium mill tailings. The purpose of covers can include (1) preventing waste from getting to the environment (stability), (2) preventing the environment from getting to the waste (keep dry), and (3) preventing people from getting to the waste (no direct dose). NUREG-1623, Design of Erosion Protection for Long-Term Stabilization, issued September 2002, provides guidance on long-term erosion protection for soil covers. To better understand whether the properties of these earthen covers evolve over time, the NRC issued NUREG/CR-7028, which shows that changes to the engineered properties of certain surface cover components, especially saturated hydraulic conductivity, have occurred relatively quickly (over about 10 years). The influence of coupling erosion and hydrology on the long-term performance of engineered surface barriers was examined and described in NUREG/CR-7200, Influence of Coupling Erosion and Hydrology on the Long-Term Performance of Engineered Surface Barriers, issued May 2016.

The NRC staffs level of interest in engineered surface covers has increased since the release of NUREG/CR-7028. Because of this interest, the NRC staff have been active in trying to understand more about engineered barrier systems, and staff from the Center for Nuclear Waste Regulatory Analysis (CNWRA) have reviewed and evaluated numerous aspects of surface covers, including evaluating approaches to simulating engineered cover performance and degradation. Codes best suited for these tasks were selected, and software verification testing was performed. CNWRA staff documented modeling of infiltration through Title II soil covers and methods for monitoring net inflow through soil covers, in addition to analyzing mill tailings cover performance and bottom liner performance for mill tailings impoundments.

The NRC staff organized a workshop on engineered barrier performance in 2010 involving the participation and attendance of a wide range of stakeholders. All aspects of cover performance and changes of component properties were presented and discussed, in addition to experiences gained by state and Federal regulators, cover monitoring devices and systems, modeling experiences, model support, and multiple lines of evidence to gain confidence in long-term performance. The NRC documented the workshop in NUREG/CP-0195, Proceedings of the Workshop on Engineered Barrier Performance Related to Low-Level Radioactive Waste, Decommissioning, and Uranium Mill Tailings Facilities, issued August 2011.

2-2

2.2.2 Presentation 2-3

2-4 2-5 2-6 2-7 2-8 2-9 2-10 2-11 2-12 2.3 Engineered Covers for UMTRCA Sites and DOE/LMs Projects Presented by Jody Waugh 1 2 3 4 W.J. Waugh , C.H. Benson , W.H., Albright , C.N. Joseph 1 2 Navarro Research and Engineering, Inc., University of Virginia, 3 4 Desert Research Institute, University of Arizona 2.3.1 Abstract DOE/LM is responsible for long-term surveillance and maintenance (LTS&M) of disposal cells for uranium mill tailings throughout the United States. The long-term protectiveness of disposal cells relies on engineered earthen covers to limit radon flux, rainwater percolation flux, and erosion.

Past LM studies have demonstrated how natural ecological and soil-forming processes are changing the as-built engineering properties of disposal cell covers. The LM Strategic Plan includes four strategies for improving the long-term sustainability of environmental remedies:

(1) evaluate long-term performance, (2) collaborate with LTS&M experts, (3) explore innovations that improve and inform remedies, and (4) improve LTS&M plans as warranted to maintain compliance objectives while reducing costs. LMs execution of the Strategic Plan included a suite of studies designed to help answer several questions (see below) about the effects of natural processes acting on engineered covers. Collaboration with the NRC on the Radon Barrier Study is a key component of this effort. LM plans to use the results of these studies to inform LTS&M decisions, such as whether to discontinue herbicide spraying at selected sites.

Will soil formation increase permeability and percolation? During the 1990s and early 2000s, DOE/LM measured the field-saturated hydraulic conductivity (Ks) of radon barriers at five LM sites using air-entry permeameters. Sites selected for study encompassed ranges of climates, ecologies, and cover designs within the LM portfolio. In general, Ks was higher where plants were rooted in radon barriers compared to areas without vegetation, and higher near the tops than near the bottoms of radon barriers. Similar to the results reported in NUREG/CR-7028, geometric means of Ks for the five sites were generally between 1x10-7 and 1x10-5 meters per second (m/s),

whereas the design target, according to UMTRCA cover design reports, was 1x10-9 m/s. A similar increase in radon barrier Ks led to an annual percolation flux of up to 17 percent of precipitation in an LM test of a rock-armored cover without vegetation near Grand Junction, CO.

Will plants take up and accumulate contamination? DOE/LM and the University of Arizona studied the uptake of elements of concern in plants growing on seven UMTRCA covers located at arid and semiarid sites near Native American communities. Concentrations in current-year leaf and stem tissues harvested from plants growing on disposal cell covers and in reference areas near the disposal cells were compared with maximum tolerance levels set for animal diets by the National Research Council (2005). For 14 of 46 comparisons, levels of uranium and other elements of concern were higher in plants growing on engineered disposal cells covers compared to reference area plants, indicating possible mobilization of these elements from the tailings into plant tissues. However, with one exception, all concentrations in plants were well below maximum tolerance levels (MTLs). Selenium, the only element that exceeded its MTL, likely originated in local seleniferous soil used to construct disposal cell covers.

Will soil formation and ecological succession increase radon diffusion and flux? Results of the LM/NRC Radon Barrier Study addressed this question and are presented by Dr. Craig Benson (Section 2.6) and Dr. Mark Fuhrmann (section 2.7).

2-13

Will dust deposition influence erosion and ecological succession? At many arid and semiarid UMTRCA sites, aeolian dust is filling the interstitial spaces in rock riprap layers that were designed to control wind and water erosion. Dust accumulation in these layers may influence the long-term protectiveness of disposal cell covers in both positive and negative ways. DOE/LM plans to begin a study in 2019 to address several LTS&M questions: What are the rates of soil infilling rock layers? What are the chemical, physical (engineering), biological, and morphological properties of these emerging rock-soil matrixes? How will soil formation in this layer influence ecological succession, radon attenuation, water percolation, and erosion of rock-armored covers?

Are evapotranspiration (ET) covers a sustainable alternative? DOE/LM is investigating alternatives to conventional resistive cover designs for uranium mill tailings. A cover constructed in 2000 near Monticello, UT, was designed to mimic the natural soil-water balance as measured in nearby undisturbed native soils and vegetation. To limit percolation, the alternative (water balance or ET) cover relies on a thick sandy clay loam soil overlying a coarse sand capillary barrier for water storage, and a planting of native sagebrush steppe vegetation to seasonally release soil water through ET. Water balance monitoring within a 3.0-ha drainage lysimeter embedded in the cover during construction provides convincing evidence that the cover has performed well. Mean annual percolation was 0.1 percent of precipitation (range of 0.0 to 0.8 percent of precipitation) over 18 years. Plant species diversity, percent cover, and leaf area increased over the 18-year period.

Are natural processes effectively transforming conventional covers into ET covers, and if they are, should we enhance this process? DOE/LM studies are weighing the environmental tradeoffs of natural and enhanced (managed) transformation of conventional UMTRCA covers into ET covers.

Past and current studies show that ecological and soil-forming processes have already changed as-built engineering properties of conventional covers. Results so far suggest that if vegetation is allowed to establish or is planted on disposal cells, conventional covers may begin to function more like ET covers without undue increases in environmental or regulatory risk. Soil-forming processes may have increased radon flux, but mean fluxes remain below the regulatory standard.

Contaminant concentrations in plants growing on covers also remain well below risk thresholds.

In an LM test cover without plants, soil-forming processes increased percolation flux from near 0 percent to 17 percent of precipitation within 5 years. However, in a second test cover, ET reduced percolation flux from 12.0 percent to 0.1 percent of precipitation 3 years after planting during three dry years. LM will continue to evaluate natural and enhanced conversion of conventional covers into ET covers to help inform LTS&M decisions.

2-14

2.3.2 Presentation 2-15

2-16 2-17 2-18 2-19 2-20 2-21 2-22 2-23 2-24 2-25 2-26 2-27 2-28 2-29 2-30 2-31 2-32 2-33 2-34 2-35 2-36 2-37 2-38 2-39 2-40 2-41 2-42 2-43 2-44 2-45 2-46 2-47 2-48 2-49 2-50 2-51 2-52 2-53 2-54 2-55 2.3.3 Question and Answer Session for: Engineered Covers for UMTRCA Sites and DOE/LMs Projects.

Question. Considering conversion of rock armored resistive covers to ET covers, you spoke about aeolian transport of fines and you talked about plowing the rock cover.... ripping it.....did you consider just adding soil to the cover?

Reply. Yes we have also considered adding soil as an option. At some sites, Mother Nature is already doing that for us with aeolian deposition of fine textured soil in the rock riprap. Morgan Williams will be working with us on an aeolian deposition study next year. Regarding adding soil, the cost of ripping is actually cheaper but it may be more disruptive. The ripping process did not mix the rock and soil very well. It left large clods and voids that created channels for preferential flow. However, for mine land reclamation, ripping is often done on the contour to provide furrows to capture runoff water. This can reduce erosion and promote plant growth and higher ET.

Question. What about contaminant uptake in the plants?

Reply. Plants are grown on covers not for uptake of contaminants or phytoremediation, but for controlling the soil water balance. However at some sites we have studied the use of desert plants for phytoremediation: uptake of uranium, ammonium, and nitrate. For example, we published on phytoremediation of ammonium and nitrate in groundwater at Monument Valley.

We have graduate students continuing to work on uptake of contaminants by deep-rooted plants growing on disposal cell covers. [editors note: a more detailed talk about plant uptake of metals at some UMTRCA sites was given by the presenter at the DOE Long-Term Stewardship Conference, Grand Junction CO, August 20-23, 2018].

Question. You mentioned plant uptake studies on mill tailing sites. What would be most useful would be analyzing for Pb-210. It ought to show up in plants as an indicator of radon.

Concentrations would be low but might be measurable. There would be two pathways; one from radon decay in the plant and the other from Pb-210 uptake from the soil, if the plant takes up Pb. If the student has samples left it might be something to look at.

Reply. Years ago we adapted a leaf porometer to measure radon transport in plants through the transpiration stream. It was very low, but that was a single point in time. Lead-210 would be more time averaged.

2-56

2.4 The Radon Barriers Project Objectives, Test Conditions, and Plant Ecology Presented by Jody Waugh W.J. Waugh1, W.H. Albright2, C.H. Benson3, M. Fuhrmann4, W.J. Likos5, and M.M. Williams6 1 2 3 Navarro Research and Engineering, Inc., Desert Research Institute, University of Virginia, 4 5 U.S. Nuclear Regulatory Commission, University of WisconsinMadison, 6

University of California-Berkeley 2.4.1 Abstract DOE/LM, the NRC, and university partners are collaborating on a study of the effects of ecological and soil-forming processes on the engineering properties and long-term performance of radon barriers. Here we present the overall objectives of the study, the process for selecting study sites and test conditions on disposal cell covers, the purpose and selection of analog sites, and results of an early characterization of plant succession on engineered covers and at analog sites.

Radon Barrier Study Objectives. The objectives of the study can be summarized as a set of general questions:

  • Soil morphology: Can we identify and quantify soil-forming processes that are changing as-built engineering properties of UMTRCA covers? How does soil formation vary for ranges of cover thicknesses, soil types, ecological conditions, and climates? Is soil formation in covers systematic, predictable, and depth dependent?
  • Soil engineering: Can we measure depth-dependent effects of soil formation on radon diffusion, radon flux, and hydraulic properties of radon barriers? Can we improve field monitoring and modeling of radon flux and water percolation in covers that have been altered by soil-forming processes?
  • Long-term performance: Can we project the long-term effects of ecological and soil-forming processes on radon flux and water percolation in radon barriers?

Study Site Selection, Test Conditions, and Analog Sites. The selection of study sites was intentionally biased. Our site selection process identified disposal sites and test locations on covers where we anticipated the greatest increases in radon flux and hydraulic conductivitythe worst case conditions, not the average condition. Selection of sites involved a ranking of Title I and II sites based on attributes such as design vulnerability, climatic influence, vegetation, source activity, and regulatory priority. The four sites selected for study encompassed a range of cover designs, climates, and ecological conditions within DOE/LMs portfolio: Falls City, TX; Bluewater, NM; Shirley Basin South, WY; and Lakeview, OR. We included test locations on covers where deep-rooted plants grew and where as-built radon flux values were highest. We sampled each site at the end of a period of high ET following a season of historically low precipitationwhen radon barriers would likely be seasonally driest. Soil morphology, soil engineering properties, and plant ecology were also characterized at analog sites. Analog sites had undisturbed profiles of the same soil type as that used to construct the radon barrier. Analog soil profiles represent a possible long-term condition or end state of the radon barrier.

Plant Ecology. Plant succession is a driver of pedogenic changes in radon barrier engineering properties. We compared plant community composition and abundance on the four disposal cells 2-57

with their analog sites using a Relevé method. We used plant ecology data to infer effects of land use practices, current seral stages, and trajectories of plant succession, while recognizing the inherent uncertainty in these inferences related to climate change, future invasive species, and future land use.

The top-deck vegetation at Falls City is dominated by planted hay grasses that are considered to be invasive. The vegetation at the Falls City analog site consists of mid-seral native plants but is a poor late-succession reference area because of heavy grazing. A relatively sparse mix of early seral grasses and annual weeds grows on the Bluewater cover. The two Bluewater analog sites are relatively undisturbed with late seral species and are good late-succession reference areas for the disposal cell cover. Similar to Falls City, the top-deck terraces at Shirley Basin South were planted with both introduced and native forage species that are currently managed for livestock grazing. Mostly early seral and weedy species grow on the rock slope, and wetland species at the base of the slope indicate ephemeral saturation. The mid to late seral shrub steppe at the Shirley Basin South analog site is a poor late-succession reference area because of historical grazing.

The top deck at Lakeview was planted with grasses but is dominated by mid to late seral shrubs, likely because of poor water storage in the thin soil layer covering the rock riprap layer. The analog site, with diverse mid to late seral vegetation protected from grazing, is a good late-succession reference area.

2-58

2.4.2 Presentation 2-59

2-60 2-61 2-62 2-63 2-64 2-65 2-66 2-67 2-68 2-69 2-70 2-71 2-72 2-73 2-74 2-75 2-76 2-77 2-78 2-79 2-80 2-81 2-82 2-83 2.4.3 Question and Answer Session for: The Radon Barriers Project Objectives, Test Conditions, and Plant Ecology.

Question. Do these cover sites have permanent meteorological stations?

Reply. Yes, some do, but they have not been in place since the covers were built. Some were put in place to monitor soil moisture probes.

Question. Did the DOE/LM Monitoring Plan feed into your choice of the sites for the Radon Barriers Project?

Reply. Yes, to some degree. We considered certain LM sites that are currently monitored or that may be monitored in the future. But screening was primarily separate from LM monitoring.

We looked at an NRC document that examined site parameters, especially radon flux, and used that as input [editors note: this report is Arlt et al, 2011]. The primary input for site selection was a table of parameters that was put together by the project team. Other factors came into play such as timing for the field work relative to climate seasonality. Radon flux may be higher during dry seasons.

Question. First, are these studies trying to determine whether we need to do any active maintenance or what maintenance is needed? Second, over the longer term, how do you factor in other variables in the evolution process, such as fire and its impact on ecology and ET?

Reply. On the second part of the question; in some ecosystems fire rejuvenates vegetation by returning nutrients to the soil and increasing productivity. It may return the vegetation to an earlier successional stage. At Monticello, where we now have a late successional vegetation, the ET cover functioned well when only pioneer species were present before the late successional vegetation became established. So evapotranspiration has been adequate over the entire 18 years of plant succession. At one point sagebrush populations on the cover were reduced due to voles eating roots, but we still had a favorable water balance. Regarding the first part of the question; all of these studies, the earlier LM work and our current Radon Barriers Project, are intended to glean information about how well these covers are performing. This will tell us what we should be monitoring during inspections and what we can do to improve sustainability of the covers. All of these studies will inform future management of these sites.

Question. Do you have recommendations for sites coming into the portfolio that provide an opportunity at time equals zero? What do you recommend to integrate into annual monitoring as opposed to what was done at sites 20 or 30 years ago? What can we build on from the onset of monitoring?

Reply. DOE/LM is both a land manager as well as a remedy manager. In Texas we have a site called Ray Point which is a Title II site that will be transitioned. This could present an opportunity to do landscape management. Everything around that site is hayed. So we have an island that could be managed as habitat for pollinators. It might be an area where woody plants like honey mesquite and black acacia could be allowed to establish. We have proposed allowing these plants to establish in test plots, and then monitoring soil moisture profiles and using RAECOM to estimate radon fluxes. This monitoring data would be compared to areas on the cover where these woody plants are not allowed to grow. So this is one example of how we might manage a site differently and monitor to see if this is a favorable management strategy.

Question. We talked about moisture profiles and how ecological succession will impact soil structures and permeability or ET. There is a tradeoff when soil structure is developed with increased percolation or suitability for plants to grow, creating evapotransporative demand, but this leads to increased radon diffusion.

2-84

Reply. This study will factor into weighing the pros and cons of these natural processes acting on covers. We need to look at this site by site. For example, does the radon barrier have adequate storage to act as an ET cover? Do we continue to manage these covers as low permeability covers as they were designed, even though permeability and saturated conductivity have increased, or do we go to other management strategies? At some point we need to screen sites. For example, at sites where groundwater contamination is a problem, we may be more interested in limiting percolation. At other sites we may want to start looking at radon from a risk standpoint rather than using the 20 pCi/m2/s criterion? So there may be opportunities for monitoring on a site by site basis.

Question. What is your opinion on grazing these sites? Would it be better to let the grazed sites go to more native vegetation?

Reply. Managed grazing can increase productivity and increase ET. That can be part of a management tool kit. However, the sites currently being hayed are not necessarily managed for maximum ET. It is just a way to manage vegetation on the site. Land use and vegetation management need to be considered from the perspective of long-term cover performance.

2-85

2.5 Cover Soil Development and Changes in Engineering Properties Presented by Craig Benson Dean of Engineering, University of Virginia 2.5.1 Abstract Earthen covers for waste disposal facilities often are constructed under conditions that are in disequilibrium with the surrounding environment. Atmospheric interactions with the cover that cause freeze-thaw and wet-dry cycles induce structural development in cover soils, resulting in substantial changes in the engineering properties until they reach equilibrium with the environment. Biota intrusion also induces structural development and alterations in engineering properties. Understanding these changes in the engineering properties of cover soils and their transition to an equilibrium hydrologic condition is critical to predicting the long-term efficacy of final covers to control the ingress of meteoric water and the egress of gases within the waste mass.

Identifying changes in the hydraulic properties of earthen covers, and relating these changes to the structure in the cover profile, was an objective of this study. Understanding how these changes are influenced by depth below ground surface was also an objective, particularly identifying a limiting depth (if it exists) beyond which structure does not develop and the hydraulic properties do not change. The findings from this study build on findings from the Alternative Cover Assessment Program (ACAP), in which numerous final cover test sections were constructed, monitored, and ultimately exhumed to determine whether the hydraulic properties of the cover soils (or geosynthetics) had changed. The ACAP study showed that saturated hydraulic conductivity (Ks) of the cover soils generally increased, sometimes by several orders of magnitude, and ultimately reached an equilibrium state between 1x10-7 and 1x10-5 m/s independent of the initial condition or the climatic setting. Changes in water retention characteristics, defined by the soil-water characteristic curve SWCC), were also observed.

Formation of soil structure caused the porosity (i.e., saturated volumetric water content) and van Genuchtens parameter to increase, and the n parameter to decrease. These changes in the SWCC generally correspond to a broader distribution of pore sizes, the presence of large pores from structural development, and lower water retention. The covers examined in the ACAP study were much younger and generally thinner than those used at UMTRCA sites. The ACAP study did not include measurements of gas flux.

This study evaluated covers at four disposal facilities for uranium mill tailings. The covers were located in different regions of the United States with widely varying climates: Falls City, TX; Bluewater, NM; Shirley Basin South, WY; and Lakeview, OR. The covers at these sites had been in service for 17 to 22 years at the time of this study and were constructed in response to UMTRCA. The covers employed different designs, were constructed with different materials, were located in widely varying climates, and had very different vegetative communities [editors note: see Section 2.4, pp. 2-62 to 2-81]. Samples were collected at various depths from the cover at each site to evaluate changes in hydraulic properties. Geomorphological surveys were conducted to characterize the structure that developed in the cover profile [editors note: see Section 2.8, pp.2-144]. Sampling and geomorphological characterization were also conducted at analog sites adjacent to each facility to understand the likely very long-term equilibrium of the cover soils. This presentation describes data from three sites (Falls City, Bluewater, and Shirley Basin South). Data from the Lakeview site were not available for dissemination at the time of the workshop.

2-86

Hydraulic properties of the cover soils at depths shallower than 1.5 meters below ground surface generally were consistent with ranges of hydraulic properties recommended in NUREG/CR-7028.

At deeper depths, the changes in hydraulic properties were more modest. At the analog sites, hydraulic properties of the soils were comparable to the upper bounds reported in NUREG/CR-7028, regardless of depth, suggesting that the depth dependence observed in the covers represented an intermediate condition rather than a long-term condition and that the upper limits in NUREG/CR-7028 were representative of the long-term equilibrium state.

The Shirley Basin South site was an exception. At this site, the hydraulic properties remained virtually unchanged at all but the shallowest depths. The cover soils were very hard and had very little structure associated with pedogenesis, except near the surface. The cover at Shirley Basin South was constructed with natural montmorillonite-rich clays (bentonites) that resist structural change, at least in the near-term (17-year) service life of the cover at the Shirley Basin South site at the time of this study.

2-87

2.5.2 Presentation 2-88

2-89 2-90 2-91 2-92 2-93 2-94 2-95 2-96 2-97 2-98 2-99 2-100 2-101 2-102 2-103 2-104 2.5.3 Question and Answer Session for: Cover Soil Development and Changes in Engineering Properties.

Question. The barrier material at Shirley Basin South is a montmorillonitic clay. All your past data have shown that this type of material has high swelling capacity and can shrink a lot; what is so special about this material that gives it the very low saturated conductivities that you measured?

Reply. This kind of cuts across the grain; a plastic clay that is less permeable should shrink the most. This material is very plastic. When we have looked at bentonitic clays in earlier studies, they were in thin layers, such as in geosynthetic liners that had relatively low stresses. This is a deep system. It has a lot of ion exchange capacity. Id be interested to see from Morgan Williamss work if this clay is sodic, and I suspect that it is highly sodic (that is, has a lot of sodium in it). There may be no mechanism in the field to exchange ions that would change its structure.

Question. These clays are potentially more vulnerable if there is a change in a characteristic such as pH that could change the clays double layer.

Reply. Bentonites are very sensitive to chemistry, which controls the swelling and water that binds to the clay. The question is whether there is a mechanism for that chemical change to occur in that environment. If so, you need to account for that. The analog sites suggest, from what we are seeing, and we will learn more, that this sodic bentonite is persistent. There really is no ion exchange mechanism to drive the process where the addition of calcium or magnesium would alter the clay structure and reduce its swelling capacity. We see this with sodium bentonite geosynthetic clay liner layers when they are put into an environment with calcium or magnesium present, which, within a few years, replace the sodium and completely alter its properties. There does not seem to be a mechanism here for that to happen.

Question. You could have a riprap layer that could be a source of calcium.

Reply. Yes, if you have a surface protection barrier that is a source of calcium or magnesium that is eluted over millennia and infiltrates down in a salt front, that could change properties over time.

Question. How about aeolian dust?

Reply. That might also have the same effect.

Question. We might need to think about this a bit. At Shirley Basin South, there were actually gypsum spears distributed throughout the clay. Gypsum is calcium sulfate. There must be a lot of calcium and sulfate present to allow gypsum to precipitate or even to preserve these crystals.

Maybe that is what leads to the properties of the system; it is already calcic.

Question. Another observation is that the pH was in the 3-4 range.

Reply. Yes, for spears to grow, you have essentially saturated chemical conditions.

Question. As we look at these sites, are we getting properties that resemble the natural original conditions?

Reply. That is what our analog sites are meant to tell us. The properties of the analog sites are meant to represent those natural conditions that are nearby and in the same material. They suggest that our engineering properties are trending toward those natural conditions. In retrospect, when we did our earlier studies, it would have been great to have done analog studies at every site to gather that type of information on the long-term end state. We are approaching that in our data.

2-105

Question. These cases have no synthetic layers, but how would a synthetic layer above a radon barrier change pedogenesis and the time frame?

Reply. That is an important question. These are earthen systems. At Monticello, there is a geomembrane above the radon barrier. It was not put in for radon control, but that membrane has resulted in important controls on water movement up and down and on water pressure in the radon barrier. If a plant come in and puts roots down, it begins to pull water. That changes pore water pressure, which creates stress, which in turn creates cracks.

Question. Are seams in geomembranes welded?

Reply. Yes, they are welded. There are two techniques: extrusion welding or fusion welding.

One is like metal welding using a heat gun and a rod; you are adding material. The other uses clamps to press the two pieces together and applies heat and pressure. The former case provides a thicker bond and longer antioxidant depletion times. It is harder to tell with the fusion weld how good the seal is.

Question. Can you compare methods to measure hydraulic conductivity when they built these covers versus the methods used today? I am curious whether there may be a bias between the methods.

Reply. All ACAP data that I showed earlier are about 10 years old and used essentially the same method used today. A group of us developed these methods over a 30-year period. We have not looked at hydrologic data from the early sites. When they built the Title I sites, they did not measure hydrologic properties of the radon barrier because the early UMTRCA criteria were concerned only with radon. Only later did hydraulic conductivity come as a criterion. Even if measurements had been made back then, those measurements would have been pretty lousy.

Back in the 1980s and late 1970s, our measurement techniques were not very good. So we have not been able to do an as-built versus recent hydraulic conductivity comparison. We have compared as-built versus recent radon fluxes. Our more recent studies with lysimeters at Cheney, Monticello, and the ACAP sites all use state-of-the-art methods.

Question. What do you recommend for measurements after these covers are built?

Reply. We collect data during construction to demonstrate that what we have built is what was designed. Therefore, hydraulic properties are generally the primary ones. For radon barriers, you would measure radon fluxes and get moisture saturation profiles. The testing methods are really important. Many methods are used for construction quality control, but generally the samples are from small, thin, tubes that really dont mean very much. You need larger samples for cover systems.

Question. You said you need 300-400-millimeter-diameter samples for hydraulic conductivity because of scale issues. Doesnt that depend on the features and processes of the system? If you have a sample with a gopher hole or a tap root that will make a difference, so wouldnt you need to look at correlation length of the system? Maybe 300 to 400 millimeters is a good rule of thumb, but it can be more complicated.

Reply. Yes, vastly more complicated. The size recommendation is very empirical. We measured properties at different sample sizes, made a graph of property versus size, and looked for changes. It is very much an engineering approach. Its a rule of thumb. In essence, we need to capture the network of pores that control flow in the field. Until the sample is big enough to get that representative network of pores, you will underestimate saturated hydraulic conductivity and bias unsaturated flow as well. A sample of 300 millimeters is pretty good; it works most of the time. [Editors note: see slide 18 in Section 2.5.2, page 2-96.]

2-106

Question. But for construction, smaller samples can be just fine. The samples are small, but they can be representative.

Reply. That can be right; it depends. If you write good specifications for liners that are compacted and you have taken all structure out, then measurements of hydraulic conductivity and density can be fine. Partly what is shaping my thinking on this is that if we are going to build to represent the long-term conditions, we will not be compacting to a high density. Then we will need larger samples.

Question. For construction quality control, small samples can be fine, but, yes, if you excavate like you have in this project, for longer term properties then you probably need larger samples.

Reply. Certainly, for longer term properties, you need larger samples.

Comment. Something that we have observed, and Morgan Williams will talk about this later for Falls City, is that structure is sometime retained from the original borrow site material. So when the cover is being built and compaction criteria are met, it is still possible for the material to retain structure so that there is macropore flow to begin with. Then you need larger samples to capture that.

Reply. We see that in covers where original structure is present. For liners, we put a lot of energy into clod destruction and chopping everything up so that we remove all of that structure.

However, that is not the case in these historic covers especially. They were being built fast.

Question. You have given us information on how systems change with time. I am more interested in performance. How do you see dynamics change from the top down? Do you see wetting fronts going further into the protective layer or is there a dampening effect?

Reply. Your question is how does percolation effect performance? Is moisture getting into the waste? Is it increasing or decreasing in response to cover evolution? It depends on the system. In systems we installed in the west, evolution of the barrier often does not have that significant an effect on percolation. Even though there is higher saturated conductivity, we can still store a lot of water. We are managing smaller amounts of water, and we are managing most of it in the top of the cover. So there is not that much percolation. That is not universal.

For example, a cover in California has a protective clay barrier with 1 meter of course textured alluvium over it. When we excavated it 6 years after construction, there were lots of cracks, and it was very permeable. We got a lot of water through that cover over time, and that was in the Sonoran Desert with 100 mm of rain per year. In the east, where there is a lot of water to manage, as structure develops you will have a lot more percolation. In the southeast, we measured percolation from 20 mm per year early on to 200 millimeters per year several years later. That is in an earthen system. It will become congruent with recharge of the natural system. If the natural recharge is 200, 300, or 400 mm per year, that is where the cover system is going. Geosynthetics change that. That is why we use a lot of geomembranes for water management in the east.

Discussion. Ecology has something to do with it. At Apple Valley, we didnt establish the anticipated vegetation and got annual grasses. They finesse water uptake and put a lot of energy into seed production. So understanding what is growing and the seasonal extraction of water is important.

Reply. It is coupling hydrology and ecology. At that site, there was a mat of roots right on top of the clay barrier. That is where the water was. The roots accumulated there, pulled the water out, and burrowed into the clay. The ecological system is very opportunistic. Coupling the ecology and the hydrology and understanding how they evolve are important.

Question. You had a dramatic-looking slide of a radon barrier that was cracked and had roots in it. Was that Monticello? I thought Monticello had a geomembrane on it.

2-107

Reply. The Monticello disposal facility has a geomembrane on top of the radon barrier. But Jody Waugh had the foresight to conduct a series of caisson experiments there, probably 10 years prior to construction of the Monticello facility. They were small, 300-millimeter-diameter caissons at first and then they were 10-foot diameter caissons. This image came from the 10-foot caisson that Jody Waugh constructed [editors note: see Section 2-5, pp. 2-97 to 2-98]. It has the same profile but no geomembrane. The geomembrane was added to the design later because it was a Superfund site and the geomembrane was needed to meet some ARARs.

Question. Any idea what the hydraulic conductivity is of the material in that slide?

Reply. It was about 1x10-4 cm/s under stress. Actually, I measured that one and can give you the exact numbers.

Comment. On that caisson, vegetation was adequate. There was very little percolation in the lysimeters even though structure had developed, leading to greater hydraulic conductivity. The native sagebrush vegetation kept it pretty dry. Monticello has about 4 mm per year of percolation over 18 years. Monticello is toward the wetter end of the range where an ET cover will work. It is in the southwest but at high elevation, has a short growing season, and gets snow. There is a shorter window of water extraction for the plants growing there, but it still works.

Reply. If anyone is going to the DOE/LM Long-Term Stewardship Conference at Grand Junction, Craig Benson will be giving a talk on the hydrology of the three sites we have on the Colorado Plateau. There is a tour of the Cheney site too.

2-108

2.6 Field Evaluation of Radon Fluxes from Radon Barriers at In-Service Uranium Mill Tailings Disposal Facilities Presented by Craig Benson Dean of Engineering, University of Virginia 2.6.1 Abstract Field studies of in-service final covers for waste containment have shown that structure develops rapidly in earthen cover soils in response to wet-dry cycles, freeze-thaw cycles, and biota intrusion. This structure includes well-connected larger pores, altering the hydraulic properties of the soils. The saturated hydraulic conductivity generally increases (sometimes by several orders of magnitude), and water retention diminishes. These same pores can be pathways for radon migration, especially as the water saturation diminishes. However, until now, no comparable field studies have been conducted to evaluate whether these alterations have resulted in an increase in radon flux.

This study measured radon fluxes at four disposal facilities for uranium mill tailings in different regions of the United States with widely varying climates: Falls City, TX; Bluewater, NM; Shirley Basin South, WY; and Lakeview, OR. These sites have been closed for approximately two decades before this study and were constructed in response to UMTRCA. The covers employed different designs, were constructed with different materials, were located in widely varying climates, and had very different vegetative communities [editors note: see Section 2.4, p. 2-62].

Samples were collected from the cover at each site to evaluate changes in hydraulic properties of the cover soils [editors note: see Section 2.5, p. 2-86]. Geomorphological surveys were conducted to characterize the structure that developed in the cover profile [editors note: see Section 2.8, p. 2-144]. This presentation describes data from three sites (Falls City, Bluewater, and Shirley Basin South). Data from the Lakeview site were not available for dissemination at the time of this workshop.

At each site, test pits were exhumed in the cover profile down to the top of the radon barrier, and to the surface of the underlying tailings in some cases. Radon fluxes were measured on the surface of the radon barrier and, when possible, directly on the surface of the tailings. Flux chambers of different sizes were used to assess the importance of scale on radon flux: large (2.32 square meters (m2)), medium (0.59 m2), small (0.071 m2), and extra small (area = 0.018 m2).

Radon concentration was measured with electronic radon detectors (RAD7 alpha trackers) and activated carbon canisters. Tests were conducted at various locations on each cover corresponding to conditions that can lead to different soil structure and water saturation. Profiles of gravimetric water content and dry unit weight were measured in each test pit, and water saturation profiles were computed from the data. In some locations, measurements were conducted in paired test pits, one with a surface feature such as a large deep-rooted plant and the other a nearby control.

All sites met the regulatory limit for average radon flux of 0.74 becquerel per meter square per second (Bq/m2-s) (20 pCi/m2-s), although some flux measurements at the Bluewater and Falls City sites exceeded this regulatory limit. Radon concentrations measured using activated carbon samplers in the flux chambers were 60 percent of the concentrations measured using the RAD7, on average, and radon fluxes computed with the activated carbon data were 9 percent of those computed with the RAD7 data, on average. Size of the flux chamber had no systematic effect on radon flux, indicating that decades of pedogenesis had not created a pore network causing scale-dependent radon flux.

2-109

Falls City, TX. The Falls City site has a grass-covered top deck and rock-covered slopes.

Mesquite bushes are scattered across the top deck. The rock-covered areas retained more moisture in the radon barrier (likely because of a capillary break effect) and had lower radon fluxes than areas in the vegetated top deck. Fluxes measured in an area of the top deck where a mesquite bush had rooted into the cover were substantially higher than those from the control pit. The average flux measured during this study (2016) was comparable to the average as-built flux (1994). However, the fluxes measured in this study varied over a greater range compared to the as-built condition, and fluxes measured at several locations in this study were larger than the highest flux measured in the as-built condition.

Bluewater, NM. The Bluewater site is rock covered over the entirety and is comprised of several different disposal units. The average flux in each of the disposal units at the Bluewater site evaluated in this study (2016) was below the regulatory limit. However, the average flux measured in this study was nearly 10 times higher than the average as-built flux (1995).

Settlement in one area of the cover at the Bluewater site results in seasonal ponding, yielding higher water contents, higher water saturation, and lower fluxes. The highest radon fluxes at the Bluewater site, two of which were above the 0.74 Bq/m2-s regulatory limit, were measured directly on an area where deep-rooted saltbush had established. The geometric mean of fluxes from this pit below the saltbush were about an order of magnitude greater than the average flux measured in a control pit. Fluxes were also high in an area directly below a large ant mound.

Shirley Basin South, WY. The Shirley Basin South site is vegetated with local species. The soil cover at this site is constructed with a highly plastic clay rich in montmorillonite (bentonite) that retained moisture and was extremely dense and hard. Fluxes on the surface of the radon barrier in this study (2017) were very low, even though the fluxes from the tailings were much higher in some cases than fluxes from the tailings at other sites. None of the fluxes were close to the regulatory limit, and the average flux measured in this study was similar to the average as-built flux (2000).

Summary. The average radon flux at each site remained below the 0.74 Bq/m2-s regulatory limit after approximately two decades of service and pedogenic development in the cover profile. However, the range of radon fluxes is larger than in the as-built condition, suggesting that structural development has resulted in some areas where the flux is higher than in the as-built condition. Average fluxes were comparable to the average as-built flux at two of the sites (Falls City and Shirley Basin South), whereas the average flux at one site (Bluewater) was about an order of magnitude higher than the as-built flux. Radon fluxes were larger in areas where surface features were present that exacerbate structural development (large ant mounds, large deep-rooted woody vegetation) and reduce the water saturation of the radon barrier.

[Editors note: The questions and answers for this presentation are combined with those for the next presentation presenting diffusion coefficients determined from the radon fluxes.]

2-110

2.6.2 Presentation 2-111

2-112 2-113 2-114 2-115 2-116 2-117 2-118 2-119 2-120 2-121 2-122 2-123 2-124 2-125 2-126 2-127 2-128 2-129 2-130 2-131 2.7 Radon Diffusion Coefficients Presented by Mark Fuhrmann Mark Fuhrmann1, Alex Michaud2, Nicholas Stephani2 1

U.S. Nuclear Regulatory Commission, 2University of WisconsinMadison 2.7.1 Abstract Excavations were made into radon covers at four uranium mill tailings disposal sites to expose the upper surface of the radon barrier and the upper surface of the underlying mill tailings waste.

Radon flux measurements were taken at the top of the radon barrier and at the top of the waste as described in Benson et al. (2017) at each location. From these pairs of fluxes and the local thickness of the barrier, effective diffusion coefficients were calculated using the RAECOM model (see NUREG/CR-3533, Radon Attenuation Handbook for Uranium Mill Tailings Cover Design, issued April 1984; NUREG/CR-2765, A Mathematical Model for Radon Diffusion in Earthen Materials, issued October 1982; and NRC Regulatory Guide 3.64, Calculation of Radon Flux Attenuation by Earthen Uranium Mill Tailings Covers, issued June 1989). The RAECOM code is available at the Wise Uranium Project Web site (http://www.wise-uranium.org/ctch.html). This code can also perform one-dimensional, steady-state radon diffusion calculations for a multilayered system that can be defined as needed, giving steady-state fluxes and concentrations at defined locations within the barrier profile. It can estimate diffusion coefficients from the thickness, moisture, and porosity data based on an empirical relationship from Rogers and Nielson (1991).

For this work, calculations of effective diffusion coefficients (D) for radon were based on the measured inlet flux at the bottom of the radon barrier and the exit flux measured at the top of the barrier. The inlet (bottom) flux from the waste and the barrier thickness were entered into the RAECOM code and the diffusion coefficient was iterated until a top flux was obtained that was close to that observed at the site. Using that diffusion coefficient, results were calculated in terms of a flux profile through the thickness of barrier material, giving fluxes at the depths defined in the model. These fluxes, along with the measured fluxes at the bottom of the barrier (top of the waste) and the top of the radon barrier, were plotted against depth in the barrier.

They were also were used to calculate modeled Pb-210 profiles [see Section 2.9]. Travel times for radon moving through the barrier were estimated based on the diffusion coefficient and barrier thickness and are expressed both as days and as the number of Rn-222 half-lives needed to traverse the barrier.

At Falls City, the average effective diffusion coefficient is 2.6x10-7 (m2/s) on the top deck, which is vegetated; the number of half-lives needed to traverse the barrier is about 5.5. This suggests that about 2 percent of radon generated from the waste reaches the top of the barrier before it decays.

The lowest fluxes are found at Pit 6 on the rock-covered side slope, where radon would need about 63 half-lives to cross the barrier. At that transport rate, no Rn-222 would exit the cover, all of it decaying within the radon barrier.

At the Shirley Basis South, site diffusion coefficients range from 1.1x10-7 to 6.1x10-9 m2/s, with an average of 2.6x10-8 m2/s for 20 measurements. Transport times, expressed as the number of radon half-lives, indicate that at least 10 and as many as 96 half-lives are needed to traverse the barrier. Most pits had high bottom fluxes (pit 3 was very high); this allows good confidence in the calculation of D. The barrier retains radon well. This site had especially low radon transport rates due to the smectite-rich cover material and its retention of moisture.

2-132

At the Bluewater site, fluxes and diffusion coefficients varied substantially. For example, at Pit 4 A and B, the effective diffusion coefficient averaged 5.4x10-8 m2/s, with an average travel time of 15.3 half-lives for eight measurements. In contrast, at Pit 5 A and B, the effective diffusion coefficient averaged 1.8x10-6 m2/s, giving a travel time of about 0.5 half-life. Very little radon retention takes place at Pit 5, while essentially no radon is lost from Pit 4. Even within a single pit, there can be notable variability. For example, at Pit 3, one measurement resulted in a diffusion coefficient of 1.4x10-7 m2/s, giving a travel time of 4.6 half-lives. Only a meter or two away, a diffusion coefficient of 4x10-8 m2/s was determined, with a travel time of 16 half-lives.

For the Lakeview site, the measurement of fluxes, even fluxes from the waste, was problematic due to the very low radon counts. Effective diffusion coefficients ranged from 3x10-6 to 7x10-8 m2/s, with most being around 5x10-7 m2/s, and travel times of less than one half-life.

2-133

2.7.2 Presentation 2-134

2-135 2-136 2-137 2-138 2-139 2.7.3 Question and Answer Session for: Field Evaluation of Radon Fluxes from Radon Barriers at In-Service Uranium Mill Tailings Disposal Facilities, and Radon Diffusion Coefficients Question. We know moisture content is very important for radon flux. Could you use geophysical methods to scan the whole site and get an overall average for moisture content?

Reply. You probably could use DOE/EMs electrical resistivity method or radar to create a map of water content.

Comment. Actually, those methods are really difficult in high-clay-content materials.

Comment. We know the relationship between radon flux and moisture contentthe wetter the better. We know the moisture content as-builtthey wet the material as much as possible to get optimum compaction. They measured moisture content as they built so they could continue building the barrier. They did not let the material dry out. So the question is how representative are the as-built measurements, without any structure development, to long-term conditions.

Mark Fuhrmann has shown us how long it takes for radon to diffuse through the barriers. If you measure radon flux right away, the radon may not have enough time to come into equilibrium.

So there is some question about how representative those as-built flux values are of initial conditions.

Comment. If you look at the construction specifications, these barriers are built in layers, and builders have to show that moisture and compaction requirements are met. That is the easiest way to control the quality of the radon barrier. So you should have a pretty good record.

Reply. Our whole construction quality assurance/quality control system has completely evolved. The whole focus was on compaction. In the old system, QA/QC was highly variable.

Today, it is a different storyvery predictable that you meet construction specifications.

Comment. When they were building these sites, as shown in the completion reports, there were sometimes well over 1,000 measurements of moisture and bulk density reported as different lifts were put on. That was to show optimized water content for compaction. If, as Jody Waugh was saying, they go immediately to radon flux measurements, after adding moisture, that will bias flux measurements low. We might have biased high.

Comment. But the flux is still within the flux criteria, so that tells me that there is a lot of margin built into the barrier.

Comment. Yes, and if you compare our bulk density and moisture content values for some of these sites, I think Falls City is one of them, our measurements are darned near the same as the as-built values.

Reply. Another point that Jody brought up is that the flux measurements were made as soon as the radon barrier was done, so that they could continue putting on other layers of the cover.

The radon barrier is probably not in equilibrium with the flux of radon coming up from the waste, so the flux measurements may be biased low. Looking at the as-built test results, there are a lot of questions and methods have changed, yet our measurements and the as-built values are pretty much the same, which is really remarkable.

Comment. There is a regulatory requirement to perform that radon measurement within a certain amount of time, maybe 90 days.

Question. Did you measure the radium-226 content of the tailings? The emanation factor can differ significantly, depending on moisture conditions.

Reply. No, we were not allowed to touch the tailings. The completion reports typically have numbers for the emanation factor that were determined experimentally. I dont know how that relates to emanation in current conditions. At Shirley Basin South, the waste is pretty coarse grained and well drained.

Comment. On many of these sites, the barrier was not put directly on the tailings. There was a lot of very low-activity material, like windblown material, that they gathered up and put on top of 2-140

the tailings. So there was low-activity material above the tailings, and then the radon barrier was put over that.

Comment. That is why the Shirley Basin South site was so different. The radon barrier was directly on top of the tailings ponds. So we actually got to the surface of the waste, and it was visually different than the barrier material.

Question. Was an assumption about compaction built into the regression equation for the estimate of the diffusion coefficient? Didnt the equation assume a value like 95-percent compaction?

Reply. No, this equation is from Rogers and Nielson (1991), and they gathered a lot of data for it. Their relationship involves porosity and percent water saturation.

Question. The hydraulic properties change over time as the site is aging. The percolation rate probably goes back to what it was in the natural environment. Radon appears to be a different story. Although the site is changing, flux appears to be close to the way it was in the beginning.

What further investigations do you need to do to verify that?

Reply. It is not what we expected. We expected that if we see changes in hydrology, we should see changes in flux. One fluid changes, so we should see similar changes in the other fluid too. That is not what we saw. This was a relatively small sample size of four sites, but with very different climates, construction methods, and cover profiles. There is some change in flux, but it is not as dramatic as changes in hydraulic properties. Maybe the range over which the diffusion coefficient varies over the practical range of moisture content is not the same as the range of hydraulic properties. Flux varies over two orders of magnitude, but hydraulic properties vary over six orders of magnitude. That probably has something to do with it.

Comment. Thinking of pore size distribution and connectivity of pores, maybe the saturated conductivity does not reflect changes in storability of the soil unit. If you attempt to make an impermeable barrier, it is in a state that is not happy with the environment. Perhaps nature is changing it in such a way that there are changes in saturated conductivity that are significant, but the changes in resistance to gas diffusion are much smaller.

Reply. That is valid. These are two different processes. One is a gas diffusion process, and the other is advection. Radon diffusion is controlled largely by water saturation and the saturated conductivity is controlled by the largest poresdifferent mechanisms.

Comment. Does some portion of the moisture characteristic curve potentially correlate to the radon diffusion coefficient?

Reply. You could look at shape changes to possibly pick up changes in radon diffusion coefficient.

Question. If saturated conductivity increases, does that translate to higher moisture content, which would mean a lower diffusion coefficient of radon?

Reply. Yes, sometimes, but it should drain more readily.

Comment. You might have to factor in vegetation and ET. ET drives most release of moisture.

Comment. Conductivity doesnt indicate levels of moisture content but only how fast moisture can move through.

Comment. Yes. If the barrier is more permeable, then a wetting front moves in more quickly, but it also will drain more quickly.

Question. The graph of hydraulic conductivity seems to indicate that, except for Shirley Basin South, it appears that changes are not yet finished. The deeper layers of the radon barrier did not seem to have changed yet. For the other three sites, it seems like the top layer of radon barrier had changed to values that you recommended, but some of the deeper ones had not.

2-141

Reply. This is most clear at Bluewaterwe have one profile that is 2.5 meters deep, and we took five block samples. The trend is beautiful. [Editors note: see Section 2.5 p. 2-101]

Comment. If the bottom layer of radon barrier is close to its as-built condition, that will have an effect on the radon flux. Change has not extended to that depth.

Comment. Some of the Pb-210 data may speak to that.

Comment. This goes to the whole issue of the effect of changes stopping at a certain depth or extending deeper with more time.

Comment. This is the beauty of the analog studies. Looking at these analog sites may be able to tell us what is not a steady-state condition in the same material. Could the analogs inform the ultimate depth of structure formation?

Comment. The comparison of the natural analogs vs. the engineered barrier is of interest.

There must be some differences; the barrier is put in with some machine, soil structure is destroyed, and then you assemble the soil as a barrier. The natural analog is untouched for thousands of years. Is there a point of disconnect where the analog part gets shaky?

Comment. Great point. Our analog sites are limited to the four DOE sites. They are in or near the disposal cell property. Considerable opportunity exists to explore natural analog sites regardless of whether they are on the property or not.

Comment. We need to grow the catalog. It would be nice to be able to go to the catalog and just pick one, or one that is close, when we are doing a performance assessment review.

Comment. Ideally, we should go to the same borrow area as was used for the barrier material.

Comment. We did that, but there is debate about it. In some instances, there are disadvantages to limiting your search to the borrow area.

2-142

2.8 A Survey of Soil Morphology and Process with Implications to Long-Term Performance at Four UMTRCA Sites Presented by Morgan Williams Ph.D. Candidate, Applied Soils Laboratory, University of California at Berkeley 2.8.1 Abstract One of the primary uncertainties associated with the long-term success of geotechnical designs is the dynamic nature of soil condition over space and time. As part of an ongoing DOE/LM and NRC study that seeks to determine the impact of soil change on the performance of engineered cover systems in the UMTRCA portfolio, we have characterized the morphology of soils across the disposal cells in Bluewater, NM; Falls City, TX; Shirley Basin South, WY; and Lakeview, OR.

Comparisons between as-designed and current radon barrier morphology indicate that patterns of soil change not only differ among the four sites studied but also across individual locations surveyed on the Bluewater and Lakeview sites. Herein, we highlight several key contributors to observed soil morphological conditions, including original barrier system design and present surface conditions. We give special emphasis to the decadal emergence of soil and root morphology at lateral distances away from individual surface features, including squirrel trail grass, bitterbrush, saltbush, rabbitbrush, and harvester ant mounds at the Bluewater and Lakeview sites. Although morphological relics of manufacturing (such as individual lift events) and visually striking heterogeneity in clay mineral composition are evident, we find, with few annotated anomalies, that emergent soil architecture within radon barriers across the individual profiles observed at the Falls City and Shirley Basin South sites are generally uniform, with the exception of small variations in very fine root development. Detailed diagrams and annotated photographs are provided that map soil morphology under dozens of surface features across the four sites surveyed, offering a unique window into commonly abstracted subsurface conditions of in-service radon barrier systems. A first-order effort to connect measured hydraulic performance (KSAT) against a soil morphological development index is presented for the Bluewater site. We find that the emergence of soil architecture controls saturated hydraulic conductivity (KSAT) at Bluewater, which results in the co-emergence of soil microbial food webs with potential implications for the long-term stabilization and maintenance of KSAT regulating soil architecture.

The talk concludes with a discussion on efforts to estimate the rates and qualities of soil change that are expected to occur over radon barrier design lifetimes (of 200-1,000 years) through the careful selection and study of adjacent natural analog sites. Such sites capture the cumulative imprint of earth surface processes on soil architecture under shared site and material factors, offering our best estimates of long-term soil condition and engineering performance of radon barrier systems through space and time.

2-143

2.8.2 Presentation 2-144

2-145 2-146 2-147 2-148 2-149 2-150 2-151 2-152 2-153 2-154 2-155 2-156 2-157 2-158 2-159 2-160 2-161 2-162 2-163 2-164 2-165 2-166 2-167 2-168 2-169 2-170 2-171 2-172 2-173 2-174 2-175 2-176 2-177 2.8.3 Question and Answer Session for: A Survey of Soil Morphology and Process with Implications to Long-Term Performance at Four UMTRCA Sites.

Question. What can you tell us about the animal burrows?

Reply. There were several types of animal burrows. We saw field mouse burrows at one site.

There were ground squirrel burrows at Lakeview and ants at Bluewater. At Lakeview, the squirrels did not get through the rock material. But in the natural analog site, without rocks, they go down a meter. We also observed ant mounds at the Bluewater and Falls City sites. We excavated several ant mounds at Bluewater, and found that they extended through the depth of the barrier and to a lateral distance of roughly 125 cm from the center of the mound. We didnt excavate the ant mound in Falls City.

Comment. The evidence about the rock barrier being effective against intrusion is particularly important to substantiate that design. We design the biointrusion barriers, but often we dont know how well they function. Actually, the design is pretty empirical; could we take block samples that contain these former burrows?

Reply. I took four block samples in this profile and they were all next to each other, so yes, the top block sample will have relics of burrows.

Question. The animal burrows look like they were filled. Were there voids or was there backfill material in them?

Reply. There was one burrow with an open void and that was an active burrow at a depth of about 40 centimeters. The rest were backfilled. They were abandoned, and surface flow redistributed sediment into them over time. That is why they have a dark color. They are filled with top soil that was moved into the subsurface. We also saw evidence of in-filled insect (possibly beetle) burrows at Bluewater occurring to a depth of 50 cm under the Saltbush profile.

Question. Does vegetation ever find these abandoned burrows?

Reply. It is pretty hard to say. The roots go everywhere. They look for moisture. It is just a function of how hard they need to work for it. This is pretty loosely consolidated material, and there was no preference for roots to move along abandoned burrows.

Question. How natural are the natural analogs? Are the distribution and number of plant species what we think has been there the last 1,000 years or are they what you see after grazing or some other impact?

Reply. At Shirley Basin South, the landscape is pretty denuded from grazing. The surface ecology is not perfect for an analog site. When choosing an analog, you would like an ecology that mimics the cell itself. Managers would never allow the cell to be as degraded as the analog site we were able to find there. However, long-term soil development that disturbed only goes back a few hundred years. The majority of that soil morphology at Shirley Basin South has been formed in the Holocene in post-glacial outwash.

Comment. Bluewater is a very intact ecosystem. The analog area was limited from grazing because it was on the mill property. So for 80 years, that has been an intact environment. That landform has been stable for the last 2,000 to 3,000 years. It is on an alluvial terrace. At some point it was more active, but over the last several thousand years it has been stable. Finding the correct analog that shares physical and biological conditions with the engineered cover, at relevant timescales is a challenge, but very informative.

Comment. The area at Falls City is grazed quite a bit. There probably would be a lot more black acacia and mesquite. It has been pretty thinned out as it was grazed. Lakeview is another site where the ecology is fairly advanced with some late seral ecology. There are a 2-178

couple of old western junipers growing there; their presence shows that the land has not been disturbed for a long time. The sagebrush, bitterbrush, and rabbitbrush association we see at Lakeview is late seral, so it probably is a good analog site. The landscape development varies from site to site and can depend on how the area was managed over the decades.

Question. How much does recent land management matter?

Reply. We have a really good understanding of range land management and the impact of overgrazing on soil structure and degradation of soil quality over a 2- or 3-year period.

However, the subsurface morphology, which is what we expect the radon barrier to deviate toward, may be more resistant to degradation over a short period. However, if shifts of the surface ecological conditions happen over a long-enough time, will that impact the subsurface?

It is very hard to tease that effect out. For selection of the right analog, you should have good information that goes back 500 years into the past, at least.

Comment. The ideal analog site is right next to the borrow area for the disposal cell. At Bluewater, that was late successional vegetation, so it was a good site. At Falls City and Shirley Basin South, the analog sites were heavily disturbed by grazing for decades.

Comment. On the time scale of a couple of decades, especially with root growth, if grazing impacts the plant distribution, that would impact root growth with respect to subsurface properties.

Reply. It could. Once soil architecture is developed, how is it maintained over time?

Vegetation may create aggregate structure and also stabilize that structure. Because of its biological activity, exuding hydrophobic compounds coat the peds, making the soil structure resistant to shrinking and swelling events and stabilizing the structure. Changing from sagebrush steppes to grassland, some of these processes are not known on the decade scale.

Pedology on the time scale of UMTRCA covers is an emerging field with more opportunities to explore.

2-179

2.9 Can Lead-210 Be Used to Indicate Long-Term Radon-222 Transport in Radon Barriers?

Presented by Mark Fuhrmann Mark Fuhrmann1, Alex Michaud2 and Michael Salay1 1

U.S. Nuclear Regulatory Commission, 2University of WisconsinMadison 2.9.1 Abstract The long-term behavior of engineered earthen covers for UMTRCA sites has prompted research by DOE and the NRC to assess changes in properties of four covers that are each about 20 years old. One design criterion is intended to provide reasonable assurance that the Rn-222 release flux will not exceed 20 pCi/m2-s (0.74 Bq/m2-s) for a period of 1,000 years to the extent reasonably achievable and in any case for at least 200 years. Radon flux measurements are typically conducted for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and are subject to substantial short-term impacts of changing moisture content and barometric pressure. Our hypothesis is that profiles of Pb-210, a daughter of Rn-222 with a 22.3-year half-life, within radon barriers will provide an indicator of where Rn-222 decayed and therefore its transport within the barrier over long times. The concentration of Pb-210 will increase for about 250 years, until the two radionuclides come into secular equilibrium.

Samples of radon barrier materials from four in-service sites have been analyzed for Pb-210. In all cases, Pb-210 was detectable, often was substantially above background values, and had higher concentrations at the bottom of the radon barriers where much of the Rn-222 lingers and decays as it moves up from the tailings. In some profiles, Pb-210 was found to decrease to background partway through the barrier, indicating that all Rn-222 had decayed before reaching the surface; in these cases, radon fluxes at the top of the barrier were generally at background. In other cases, Pb-210 concentrations were greater than background toward the surface of the barrier. In these locations, measured radon fluxes at the top of the radon barrier were elevated, indicating radon migration through the entire radon barrier and long-term release of a small fraction of radon that entered the barrier from the waste.

To relate Pb-210 concentrations to radon flux, we used the RAECOM code to model diffusive transport of radon (NUREG/CR-3533, Regulatory Guide 3.64). This code was originally used to estimate thicknesses of the barriers prior to construction, but it can also be used to estimate diffusion coefficients from measured top and bottom fluxes, as well as to provide calculations of radon flux and steady-state concentration at defined depths within the barrier profile. A spreadsheet model was developed to convert Rn-222 flux profiles from RAECOM to Pb-210 concentrations and to calculate the ingrowth of Pb-210 as the barrier ages.

We observed two types of Pb-210 profiles within the barrier material. The first is a curve that continually decreases with distance from the waste until it reaches the background Pb-210 concentration. From that point, the Pb-210 concentration remains constant as the surface of the barrier is approached. Calculated Pb-210 values based on the modeled radon flux, from our top and bottom flux measurements and the age of the barrier, correspond with the measured Pb-210 results quite well. The second type of profile shows a more complex pattern in which Pb-210 increases from the bottom of the barrier to a maximum 5 or 10 cm up from the bottom. Then the Pb-210 concentration drops rapidly but does not attain background concentrations; it remains elevated as the top of the barrier is approached. This type of profile seems to conform to the moisture saturation profile of the barrier material and was observed at only two locations at the 2-180

Shirley Basin South site; it is unclear whether these locations represent an unusual set of controls on Rn-222 transport/Pb-210 deposition. Approaches to modeling this type of profile are being discussed.

Findings from this work indicate that Pb-210 profiles are promising for quantifying long-term Rn-222 transport in radon barriers. Two approaches to better understanding long-term transport in radon barriers are suggested; the first is the use of detailed Pb-210 profiles to define Rn-222 transport mechanisms within the barrier as a means of testing assumptions about transport mechanisms used in models as well as the impacts of moisture content and preferential pathways. The second is a monitoring approach that uses samples from the upper portion of the barrier (perhaps the top 25 cm taken by Geoprobe) to determine whether Pb-210 is elevated compared to the background concentration. Our data strongly suggest that Pb-210 concentrations greater than background in the upper portion of the barrier are an indicator of elevated radon flux from the top of the barrier.

2-181

2.9.2 Presentation 2-182

2-183 2-184 2-185 2-186 2-187 2-188 2-189 2-190 2-191 2-192 2-193 2.9.3 Questions and Answers Session for: Can Lead-210 Be Used to Indicate Long-Term Radon-222 Transport in Radon Barriers?

Comment. It would be really interesting to overlay your lead concentration plots on the photos, like you did with the density, moisture, and depth diagrams.

Reply. We started doing that with the moisture content. There's more that we can do to tease out information.

Comment. I would argue you want a conceptual site model for each one of those. How do you calculate diffusion, and what model would you use for that? You brought up clay and the sorption of Pb-210 on clay, and the other issue is the moisture content. It would be a very good performance indicator if you could overlay data with regard to Pb-210, but you have to have that conceptual site model and the effective mathematical model describe whats going on with Rn-222 and the lead.

Comment. It would be interesting to also look at root counts versus moisture and Pb-210.

Reply. Good idea.

2-194

3 NEXT STEPS Discussion Led by Craig Benson Dean of Engineering, University of Virginia 3.1.1 Presentation 3-1

3.1.2 Discussion Craig Benson. I was thinking about the different stakeholders we have here. We have folks from DOE/EM who are more on the design construction operation side, and people from DOE/LM who work on the long-term management stewardship of the sites. And then we have folks from the NRC who are on the compliance side. So we all have a different role in this, and oftentimes those roles don't overlap. Yet we would like to have something that is congruent between what the NRC would want in terms of a system in which you have a high degree of confidence to meet your goals for meeting regulatory requirements. For EM, you would like to have something that's cost effective to build and that you can build, operate, and permit in a practical way. You also want something that LM can manage and maintain in perpetuity without an extraordinary amount of effort or resources, something that LM has a high degree of confidence will last. How do we bring those three different goals together? Those are the challenges we can think about as we direct our work going forward. How do we go about doing that?

One of the things that we talked about last night is that a lot of our design work now is around a uniform set of criteria that we apply to every site. The risk is different depending on the site.

Certainly, a mill tailings site has different risks than the saltstone disposal facility or the HLW tanks at Hanford; they all pose different risks and they are in different environments with different receptors. The emissions from those sites have different impacts and potential effects. We need to be able to create a process by which we are really focusing on managing risk. When creating facilities, our approach to design, maintenance, and permitting should be around managing the risks as opposed to managing the process. Its really a more flexible approach. We need to think about how we can create resilient designs that fit in with that function well, that are sustainable in 3-2

perpetuity, and that meet the performance goals. Finally, how can the NRC have confidence that we actually can build the facility and have some confidence that its going to work over a very long period of time?

How can we create a resilient stable-state design that represents the long-term condition, not only when we build it but 1,000 years from now? This means design, construction, and monitoring so that we really understand the processes involved and how they're going to affect the system. We need to be sure the design is resilient enough so that it functions in the context of those processes. For example, if we have an anthill ingress into a facility, that design needs to still function in the context of that type of disruption. They are all kind of big-picture ideas, but then how do you get there?

We just started to make some notes on how to get there [editors note: see slide 2 of the presentation, Section 3.1.1, page 3-2]. These are just ideas meant to start a conversation. First of all, we think about the types of risk that we have. These are different types of factors that affect how we would go about designing a facility and the type of approach we want to take, given the risks. There is climate. Where do our facilities sit? The climate is very different for Burrell than it is at Bluewater, versus that at the Savannah River Site, versus out at Hanford. These are very different climates and very different settings.

The second item is to start to better understand natural sustainable systems. We engineer things and then nature changes them. I guess we're better at that than we were 30 years ago, when we started really working in containment systems. That's really the essence of trying to get out a resilient designlook at what nature tells us. The big force that we're dealing with is nature trying to take the system in a certain direction, and entropy is going to push it to a longer term stable state. We need to try to get to that stable state from the beginning. We are looking for these natural sustainable systems that provide long-term isolation with minimal intervention.

Jody talked about this last night. There are debris flows on the western slope in Colorado that are essentially natural riprap deposits that have been in place for millennia. They provide great examples for us of a natural system that will function for thousands of years. They are essentially undisturbed in the context of disruptive environments. We can characterize them, understand them, and then understand how we can translate those into engineering designs. We can then develop methods to replicate these natural and sustainable systems so we can have a higher degree of confidence in their performance. In this way, a regulator can actually believe we know what we're doing, and the regulator can be confident that we can design a facility with a high degree of reliability.

Can we develop simple and cost-effective techniques for surveillance to confirm the function? I think what Mark Fuhrmann is doing in terms of Pb-210 fits that perfectly, and it is something that others can also do. A process that involves digging gigantic holes, taking samples, and doing all kinds of neat analysis is expensive and slow. We did four sites in 3 years. If we had a technique where we get a lot of samples with a Geoprobe like Mark has suggested, and if we take 20 samples in a day and perform the analyses in a month, we could have an idea of how that system is functioning. It may not be in great detail, but it might tell us whether the system is functioning, or it might give us more detail. Can we develop these kinds of simple and cost-effective techniques for surveillance to allow us to confirm function? DOE/LM could use such a technique to check on sites periodically and report back to DOE and the NRC to demonstrate that the function is meeting the goals.

3-3

Jody Waugh. I think there may be really practical questions on how we're managing these sites.

There are three questions that are related to legacy sites that we manage. One is that the long-term surveillance plan right now requires us to spray herbicides to kill the vegetation. It's a very practical question; do we have to continue spraying or can we let the vegetation grow? If we spray, does this mean we are going to spray herbicides for 1,000 years? How does the risk associated with 1,000 years of herbicides compare to the risk associated with the radon?

Then, how do we manage the sites going forward? In some cases, vegetation growing at a site may be beneficial. Transpiration may control the water balance and prevent percolation. But there are tradeoffs. Weve shown that vegetation tends to dry out the radon barrier, create root channels, and enhance structure development, therefore increasing radon flux. For example, at Bluewater, we have a ground water contamination plume that's moving away from the site toward an area where the local farmers pumped water for irrigation. As a result, at that site, maybe the risks are greater associated with ground water contamination than they are from an increase in radon flux.

Thinking of another site, Shirley Basin South is a mining area and the subsurface is just full of uranium. Natural uranium in the ground water is high, so maybe what the tailings contribute really doesn't matter.

Next, is there a way to do risk-informed performance monitoring? We start out with an unfocused one-size-fits-all approach, but maybe we should move to more risk-informed performance monitoring. Even coming out of the 2010 workshop on engineered barrier performance (NUREG/CP-0195), we asked this question. This leads to the third question that Craig has already alluded tohow should we go about monitoring? Do we have the technologies available currently to monitor? Is there a simple, inexpensive way over time to monitor or estimate radon flux using Pb-210? Similarly, is there a method to monitor and estimate whether we're getting percolation flux for sites where the risks are greater with ground water contamination?

Those three questions are key. We need to decide whether to spray or not. We need to know whether ET and controlling the water balance or whether controlling the radon fluxes is the higher priority. We need to be able to monitor if we go to risk-informed performance monitoring.

Craig Benson. The risk defines the monitoring priorities.

Jody Waugh. The last item is how do we prioritize sites and allocate resources to address the previous three questions?

Tom Nicholson. How do you interact with EPA?

Jody Waugh. Im a DOE/LM contractor. Im not a policy person and so I dont really interact with EPA. Im sure LM does, but Im on the applied science side of LM as a contractor, and I really cant speak to these policy aspects.

Tom Nicholson. We have risk to public health and risk to the environment. If I were EPA or the States, I would ask that LM give me an indication over the long term of how well these systems are going to operate with regard to public health and the environment.

Jody Waugh. In the past, we have done ecological risk assessments at some of these sites, and I think its something we could build on moving forward. We havent done those types of assessments in a while. The focus has been on compliance with UMTRCA.

3-4

Craig Benson. Sherri, as the chair of LFRG, what is DOE/EMs perspective?

Sherri Ross. We use models to predict how the facilities are going to perform, and we recognize uncertainty and variability in them. We try to prioritize additional research and information needs, and we conduct annual reviews of our operations and facilities. Our models are living documents that need to be maintained and current. There is both compliance monitoring and performance monitoring of facilities. We use our models to try to predict and give reasonable assurance so we can authorize the operations to proceed, but our models are considered living documents. We do additional research and development to maintain those as current and factor in new information as we go, including performance monitoring and separate compliance monitoring. Typically, we will hopefully not run into compliance issues early on. For CERCLA facilities, it is a three-agency approval process to operate, involving DOE, EPA and the State. Typically, the remedies are reviewed by the agencies on 5-year frequency, where they specifically look at what data you have accumulated. Is new information in sync with your model? Do you need additional information?

The reviews look at ground water samples and air monitoring, and theres a frequency for monitoring. You do want to focus on those barriers and the performance of the barriers that are really needed. What's the major risk for the facility, depending on what you're disposing there and on operations?

Tom Nicholson. You brought up the word remedy. So after 5 years of collecting data and doing good analysis, what causes you to want to use a remedy? What is the indicator that says something has to be done or that it's fine for 5 more years, and well look again after another 5 years wait? What are the indicators that say remediation has to be implemented?

Sherri Ross. Its the requirements. There are the regulations, and you look at your risk assessment so you know what contaminants are there. What is the risk they imposed? Does an action need to be taken? Those are typically three-agency decisions, and they evaluate those questions together. They look at proposed options and then select an action collectively.

The three agencies will agree to the proposed remedy, implement it, and perform 5-year reviews. The agencies agree to what data are being collected and evaluate them. The agencies may decide 10 years down the road that they need to consider a different parameter.

For example, the agencies might say that they know they do not have a lot of uranium here or that they do need to better evaluate radon performance. Then they might want to monitor for Pb-210 in the subsurface. Its an evolving process that does not start with all the answers at once. They evaluate and see whether additional actions are needed. DOE/EM does that at its operating disposal facilities. On an annual basis, DOE/EM needs to know what it disposed of last year. Typically, DOE/EM is under CERCLA, and those are 5-year remedy reviews by all three agencies, so it's very similar to the questions you're posing here under LM. We will also install closure caps, but a lot of ours are mixed waste. Theres a liner so I don't think thats directly applicable.

Ming Zhu. I would like to add, as Sherri mentioned, DOE has been using the risk-informed approach in all phases, from design, construction, and operation to site closure. As Sherri alluded to, DOE Order 435.1 guides the use of performance assessment to support all those three phases. Using the LFRG process for disposal facilities and even for high-level liquid waste when we go through tank waste closure, we will follow a similar process for closure. In addition, for remedy actions theres discussion about when you can turn off pump and treat and the criteria we should use to make that decision. Thats part of the 5-year review that we do under the EPA requirements. Theres active discussion on the need to come up with some kind of formal guidance to make that decision a little more robust. Thats part of the reason why we stood up the Performance and Risk Assessment Community of Practice, to share information, 3-5

develop consensus, and hopefully document the group consensus as guidance to our sites.

Craig is one of the leaders in that group and is developing one key piece for the performance assessmenthow to predict the long-term performance of engineered structures. Roger Seitz is another key player in that group who has already developed a white paper on how to manage uncertainties given all the factors that need to be taken into account in the final decision. The point I want to drive home is we are using the risk-informed approachalthough maybe its not formally called thatbut consensus seems to be in recent years to make decisions a little more robust.

Craig Benson. Perhaps elevating that idea would be really helpful. I think that group has come together a lot over the last few years and has really started to gel.

Hans Arlt. I really like what Jody spoke about. When I look at these uranium mill tailings covers, there are two issues. One is with the ground water being contaminated from the waste when the water filters through the cover. The other one is with the radon release. Right now there doesn't seem to be a problem with radon release, but there's an indication that there might be a problem in the long term. The biggest releases were from root systems and animals like ants. It seemed that the fauna and flora are not good for radon release. You're seeing the beginning of that at some of the sites, some more than others, so you had impacts from anthills and roots and those dont seem to repair themselves. In other words, once an anthill is there, it's there, and you have that problem for a long time. Once you have that root system there and it loosens up the soil, thats there even if the plant dies. So it seems like you have the beginning of a potential problem, and you have 170 years or so to go. I think a lot of these covers are 30 years old. I would think somehow that one may be able to model long-term impacts so if you have a certain rate for how many anthills develop at a site and how many plants are there.

These rates are changing. Shirley Basin South seems to have really fantastic compacted clay, even though it has really high sources. I would guess that if you modeled that site, even after hundreds and hundreds of years, youre not going to have a problem, although you might eventually have a problem at some point if roots develop.

Jody Waugh. Yes, that gets back to something I introduced yesterday during the presentation when we talked about starting with a conceptual ecological succession model. We are starting with as-built conditions. There's no ecology; we call this primary succession. It's like a rock surface that eventually turns to soil, but what we're starting with is the engineered as-built site.

Then, we're trying to define this dynamic end statepotential natural vegetation or late seral stage. I had a cartoon up there trying to illustrate this seral stage concept [editors note: see Section 2.4.2, page 2-65]. Wed like to develop these models for each site, at least conceptual successional models, and then be able to define where we are currently in this progression, that is, this trajectory that we are projecting. So we define where we currently are and how much more ecological change we would anticipate. Then, because that seems to be the key driver, we need to define the soil morphological changes in response to the ecological change and, most critically, the changes in engineering properties.

Hans Arlt. I was talking about modeling what happens if you just leave the system alone, as it keeps on doing what it is doing. It seems to me DOE/LM may be thinking about changing some of these sites. You have the slide showing plowing in the riprap [editors note: see Section 2.3.2, page 2-49]. Youve been talking about that for a very long time and so Im wonderingwhats the decision there? When the decision is made, will you change the covers by plowing in the riprap, or do you plan on looking at that for another 10 or 20 years? Theres no sense in modeling what happens if you leave the system alone if you're going to change the site.

3-6

Jody Waugh. Currently, we are looking at how Mother Nature is changing the sites.

Particularly for arid sites, theres probably no need to try to pull soil up into the riprap if Mother Nature is depositing aeolian dust and filling that for us.

Hans Arlt. So your opinion is that DOE/LM is thinking maybe we shouldn't be so active?

Maybe we should just leave it the way it is? Maybe stop the herbicide as the most active thing, and then one could just model what one has and then see whether there is potentially a problem. Models, of course, have a lot of uncertainty, but maybe you can get kind of a ballpark idea of whether there will be a problem in 50 years or 70 years at some of these sites.

Jody Waugh. Yes, if the cover begins looking like the analog site within 170 years or 970 years, how will the cover perform with that morphological stage, that ecology, that water balance, and associated engineering properties?

Hans Arlt. It may be that the radon release is fine at some of the sites, even with a lot of vegetation and animals. However, you might have three or four sites where it is a problem and you cant let it continue going the way it is goingmaybe we need to put in a geomembrane.

Jody Waugh. I get to look at sites individually, like comparing Shirley Basin South to Bluewater. In one case, maybe radon flux is a greater concern for risk, while at the other, percolation of water is probably the greater risk. We need to be able to screen, categorize, and prioritize all these sites as to the best way to manage a particular site moving forward. Should we let it transform into an ET cover or do we need to keep spraying? It's a tradeoff. The wetter the better for radon attenuation, but plants need to dry out the cover if we want to prevent percolation so tailings are not a continuing story.

Sherri Ross. I would like to see us apply what we've learned into the design. Most of these sites studied were arid sites, and, except for some of the plants that had deep, deep roots, plant roots will follow the water. If you design the top of your cover to be well above where radon decays, then you may not need long-term maintenance. One of the goals of DOE is to minimize long-term maintenance. If you know what plant life will grow on the covers, you can design for that so they don't actually degrade your barrier.

Jody Waugh. A lot of these covers were designed with a protective layer. You might remember the three designs we had at the beginning. The earlier ones just had rock right over the top of the radon barriers, the cover wasnt protected. Later, the covers had a protective layer. That protective layer is also a water storage layer, and we dont see the roots going down into the radon barriers below the protective layer very much. We're not in the design business, but if you design one that way, we would like to monitor that type of design.

Sherri Ross. For the purpose of the continuing living documents, what are you learning in your maintenance and monitoring? How can you apply that information? At a facility that already has a closure cap, it is difficult but you could install a top layer if you determined that its necessary. However, the information could be applied when you do design the next facility closure cap.

Jody Waugh. When you are designing the cover, think about where it's going to gowhere Mother Nature is going to take this cover. Earlier, Craig brought up looking at natural systems and natural analogues; this is really important, but we havent developed it much. The glacial debris flow is a really good example. Its an analog site right near the Grand Junction disposal cell. During the Pleistocene, as the glaciers were melting on top of the Grand Mesa, basalt 3-7

mixed with soil came down and basically armored the Mancos Shale. This is a really high-clay-content shale that was used to build a radon barrier. We have this natural analog with soil and rock armoring these slopes, and were going to look at this to see how stable it is.

Morphologically, the slopes have been stable for 10,000 years. We look at the water balance.

The vegetation is growing. We can see calcium carbonate is forming in the soil. The water is not moving very deep so its been stable. So I take engineers to that site and ask them to engineer that natural analog to use in the design for a disposal cell, because it's already proven to last for 10,000 years.

Mark Fuhrmann. For existing sites, your idea of using a succession model to get information on different stages of vegetation on that site over different times suggests that we need more detailed information on the impact of that type of vegetation on a very small scale because we see how patchy radon fluxes are. However, we dont know about water ingress on that scale.

We know that about 40 centimeters is a good size for a measurement. We do know that the radon fluxes are somehow very patchy, but we are not sure why. If a vegetative system moves in such that you've got a large plant every 100 meters or so, you need to know more about how the radon and hydraulic conductivity are influenced around that plant on a granular-enough scale that you can then take your succession model and plug in these properties of flux over the whole site. This would then give you estimates of your radon fluxes at the boundary and your water transport through the cover, in order to be able to estimate how these things are behaving in 200 years.

Jody Waugh. We do have some evidence for water balance and water percolation, and how well vegetation may control that at the Monticello ET cap. It is a really good first example of where we enhanced establishment of late successional vegetation. I showed a photo yesterday

[editors note: see Section 2.3.2, page 2-43]. Instead of waiting for Mother Nature to put in sagebrush grass steppe vegetation, we planted it. We didnt wait for the natural succession to take place. Over the course of 20 years and at a site that is relatively wet and has a short growing season, ET has been adequate to cut percolation flux down to almost zero. Of course, it was designed as an ET cover. In the second example, and I talked a little bit about it yesterday, there is the test lysimeter facility that we've built at the Grand Junction disposal cell.

As the disposal cell cover is being managed, we spray the vegetation, nothing grows, and we are monitoring the water balance. On the other part of the test cover, over the past 3 years, weve seeded it and were allowing vegetation to come in. The percolation flux has dropped considerably. We need to keep monitoring, but theres evidence from these studies that this is a feasible approach. I think at some point we are going to have to apply water balance modeling to evaluate results.

Mark Fuhrmann. We seem to be able to understand the balance between radon flux and water transport processes, but how can you design around that tradeoff? Maybe there are ways to design the cover in layers that allow you to get both.

Jody Waugh. When we talk about the ecological succession as at the Grand Junction disposal cells, a good example is aeolian dust thats beginning to fill the rock. Its changing the plant habitat, whereas initially that rock was acting as a mulch and keeping the cover wet. Now, the dust has created habitat for deep-rooted plants. You saw the photographs that I showed yesterday [editors note: see Section 2.3.2, page 2-41]. At these sites, were beginning to see that the aeolian dust is filling spaces between the rocks, holding a lot of the moisture closer to the surface and increasing surface evaporation. Now were seeing shallow-rooted grasses and forbs start to grow on that surface. Mother Nature may be starting an ET cover for us by depositing dust. Going back to Hans Arlts questions, rather than ripping, maybe we just want to 3-8

enhance that process. Maybe we want to fill the rock with fines so that its not acting as a mulch, and so we have shallow-rooted plants and a more favorable water balance.

Tom Nicholson. In order to enhance performance, you have to understand the conceptual model of the site as it is today, and how those processes are working. We worked with the University of Arizona back in the high-level waste days, and we talked about conceptual model uncertainty and parameter uncertainty. The issue you've been bringing up with Mark now involves scenario uncertainty. You think you know the Burrell site or the Canonsburg site, but you have invasive species such as Japanese knotweed, which is adding nutrients, mulch, and all kinds of carbon. The argument is that you think you know the scenario you're building in as a succession, but now there are invasive species. The other issue is that nature often goes through cycles, and so therefore you could have a long-term drought or a fire. How will that change things? That has to be built into your scenarios.

Jody Waugh. On the slides I presented yesterday [editors note: see Section 3.2.3, page 2-55], I ended with the uncertainties in climate going forward and invasive species, fire, drought, and so on.

Roger Seitz. With regard to this kind of design, a lot of our barrier designs include a bio-barrier that is basically cobbles. How durable will that be if it is going to fill in? How can we effectively develop a bio-barrier that's going to do its job for a long time to protect against intrusion by plants and critters? How do you design that?

Jody Waugh. We included a bio-barrier at Monticello, but it's not a surface rock, it is just above the capillary barrier interface at the ET cover at Monticello. Years ago at Pacific National Laboratory and also at Los Alamos, Tom Harkinson did some work looking at the turnover of soils by burrowing animals and different types of barriers needed for different types of burrowing animals. When we designed Monticello, we used these earlier studies to get a rock size and a rock spacing. We didnt want to change the storage or the flow of water. We just wanted to prevent, in the case of Monticello, prairie dogs from getting down to the capillary interface.

Roger Seitz. From what we're seeing, animals and plants are what create problems for radon.

The other point goes back to Tom Nicholson asking, what triggers a change? We started thinking about this idea of performance monitoring probably in the 1990s. If you are using sensors, its a really fine line because you want to get this information, but inevitably some sensors are not very reliable. Youre going to get bad readings, and youre going to get good readings. My caution would be that, before you even start, you need to know how you are going to explain results that are outliers. For example, we end up spending tons of time and money explaining results from pneumatic piezometer sensors. The fact that we did not state upfront to the regulators that we may get some strange measurements means that there are problems as soon as you get strange measurements.

Craig Benson. Having a data quality process is important so that you have a high degree of confidence that what you're measuring is actually telling you what you think it is. That informs the design or the maintenance or the decisionmaking that you need to do.

Tom Nicholson. If I can't tie it to risk then it's a waste of money.

Roger Seitz. But you may gain information on Pb-210 or moisture. We're looking at moisture, but before you start reporting it officially you need to explain that you're going to see strange 3-9

things. It is much easier to say it before you start than to state that when you start seeing the strange results. Then people don't believe you and you lose credibility.

Craig Benson. That is what I like about this room. We have different parties here. You need to agree on what you're going to do as a partnership as opposed to trying to satisfy some party. I have spent an enormous amount of time in the last 18 months trying to understand the data that we get and what they mean relative to what was expected. We should be really careful about it.

Roger Seitz. Pneumatic piezometers are interesting instruments and so are advanced potentiometers. You can get all kinds of information from them, and in a compliance environment it can be very difficult to deal with.

Craig Benson. I think your point about the bio-barrier is how to actually get to a stable-state design. There are examples in nature that tell us how we should go about engineering bio-barriers that we can build into new facilities. We ought to be trying to harvest that information proactively so that we can create resilient designs that everybody has a high degree of confidence in. We need to realize they are never going to be perfect, we still need to monitor and check them. I know in my own work I've talked to people who are working on performance assessments, people in LFRG, and people at the sites, and the problems I'm working on are one-off problems that people are struggling with. Im thinking of trying to do this a little more holistically. How do we look at the family of issues to get to a stable-state design?

Mark Fuhrmann. From the point of view of the analogs, something that came up in that engineered barrier performance conference in 2010 (NUREG/CP-0195) was from the NRC perspective about developing a catalog of natural analogs. That hasnt really gone anywhere, and we are still talking about it. Im more stuck at the current situation at some of these sites and the issue of having a good understanding of what processes are really driving radon fluxes. I have a better handle on radon, I dont have much of a handle on water. Some of the Pb-210 work will help resolve this. We've assumed diffusion in a homogeneous medium as the model for transport in these things. That is how the covers were built, and that's how they were designed with a substantial margin, so they're okay. Do we need to have a better handle on transport processes, as these things do change? The patchiness in radon flux bothers me. We see such big differences in flux over areas that are less than 1 meter or so. I don't know how that patchiness will evolve, and I'm not even sure we understand very well what's driving it, except in a general sense. Do we have tiny fast pathways that are advective? I don't know, maybe in some spots.

Do we have much lateral transport? Some of these have a fair amount of sand and layering within the barriers. Does measuring it here mean anything about what's actually going on directly down below? Or is the radon coming from 50 feet or 100 feet over? We don't know that. I don't know how important that is. Maybe just the whole general flux is the key, and all these details are not so important. They suggest to me that they're telling us something about how the cover is changing, but I'm not sure what that means. I am curious to see others opinions about that.

Tom Nicholson. The question is, do you understand what could be the mechanism that is operating under what position, and how did they change with time and your spatial distribution? A system that may have been very diffusion dominated at first becomes less and less so if you get changes in the barrier that Mark is talking about. Is it really important for this net flux that either radon is going up or a contaminant is going down into the ground water system? When does it become important?

Mark Fuhrmann. It becomes important if it's an indicator of how things are changing. If it's just an indicator of the way it was built, then maybe you don't need that information. That question 3-10

would be different at different sites. I don't know how granular you need to get about mechanisms to have a good handle on how things are changing. That is what Im struggling with.

Tom Nicholson. Is that mechanism causing significant flux of contaminant to the atmosphere or the ground water and under what conditions does it become significant? Knowing this you include it in your modeling. Models can really help you in that regard, and through the natural analogs, where does it make a difference and where does it not make a difference.

Craig Benson. You have to assume that your models captured the mechanisms.

Tom Nicholson. When we were looking at Yucca Mountain, we looked at Rainier Mesa as a prototype of what Yucca Mountain might become by considering the recharge, the snow melt, and other things. There was value in looking at areas very close by with similar mechanisms. It was very valuable.

Mark Fuhrmann. We've been looking at analogs, but we cant really look at them in situ for radon transport because they dont have a source term thats anything like what were worried about at the sites. We could look at them from the point of view of water transport. For gas diffusion, you could do tracer studies. Would that be a benefit?

Craig Benson. I think you can look at those analogs and find similar processes that you could use to validate some of the models and answer some of the questions. You could test those hypotheses if you use tracer experiments or look at other gases that might be migrating in that system, and you could validate some of the assumptions.

Doug Mandeville. If I had to review a cover design today, what would I be looking for? If it was for a Title II site, the regulations do allow for a vegetative or rock cover. My process for reviewing that would depend on whether I should focus more on the radon emanation or the ground water percolation. Knowing that site-specific part would be important. Also, no licensee and no members of the public are at this workshop. They may have vastly different viewpoints on this than we do. The licensee is going to want to spend the minimum amount possible to design and build a cover that meets the regulations. Their concerns are vastly different than what DOE/LMs concerns will be.

Tom Nicholson. When you do a review, what information are you looking for?

Doug Mandeville. We have a reasonable assurance standard that it will last for 200 to 1,000 years.

Bill Von Till. We haven't had an application like this for a long time. Interestingly enough, we had the potential site in Virginia. Virginia Uranium wanted to have a conventional mill and mine; a pretty large one at that. The company almost came up with an application to us, but politics overcame that. In the process, it pretty much thought through the entire design. This is in a very wet climate, where Virginia Uranium is trying to overcome the type of rain events there. This is in Chatham Virginia, so it is central Virginia near the North Carolina border. Virginia Uranium went through a total design for a new conventional mill. There's also a mill site that has been licensed out in Colorado on the western slope, Pinion Ridge. As far as this kind of review for the actual cover and reclamation plan, I dont think weve dealt with an ET type of cover design in our regulatory reviews. Monticello was more of an EPA site. Ive been to Monticello, and it looks to me like that's a great design. I dont know what the cost differences are between that site and a conventional site, if the licensee were to have to pay that money. The other thing I might offer is 3-11

one of the things we and DOE/LM management are looking to do. The regulations say to build this cover so theres minimum maintenance. I don't know whether thats a good system, it probably is not because I think you're going to have look at the performance indicators and monitor other things over time to really assure the safety of the public. However, the regulations, as they stand now, call for designing for minimal maintenance. How do you design such an impoundment with that standard in mind, with minimal maintenance? What do you have to do, plant the saltbush brushes and the type of vegetation so they can take over in 5 years and then be very stable and then walk away from it? What's necessary to design and build a site that's going to last without a lot of maintenance?

Craig Benson. That's the crux of the question. How do you get to stable-state performance?

Tom Nicholson. What do you have to do to maintain the site from the standpoint of changes such as severe erosion, rainfall, and drought? You have to think in terms of how the site may undergo change.

Bill Von Till. You really do, and for 1,000 years. Just in 20 years, we've seen a lot of problems at some of these sites, like L-Bar and other sites where DOE had to come in and spend a lot of money. Look at Bluewater and the slumping problem. In just a 20- or 30-year period, youve seen a lot of maintenance necessary for the sites that were built with what was supposedly the Cadillac design. Now maybe the ET cover is the Cadillac design. Would an ET cover work in Virginia?

Jody Waugh. What does the design look like at White Mesa?

Craig Benson. I was just thinking about that one. From an owners point of view, Energy Fuels has a uranium mill where we've been working on an enclosure. We had a group of folks who have designed a water balance cover, an ET cover, for that site. We're actually evaluating it at that site right now. We've built a large test section. We've got a vegetation monitoring program.

I've been working on the hydrology part. They are very interested in that design because it's very sustainable. I think you can build it and it will have minimal maintenance. It will continue to function better and better over time because it fits in with the natural system. That was what was really attractive to the owner.

Bill Von Till. That is Energy Fuels Resources at White Mesa. It is regulated by the Agreement State of Utah. It has lined impoundments. It is semi-operational now, really in standby mode now. Are they thinking of actually submitting that kind of design to Utah?

Craig Benson. Yes. It is already submitted, and it has essentially interim approval, provided our test section gives the data that prove out that it actually works. Mainly its uranium mill tailings, but today Energy Fuels Resources runs a vanadium circuit there too, so there are some other metals.

There is a compacted layer, not necessarily a low-permeability clay barrier, but there is a well-compacted layer at the base that is meant to control radon. It is about 2 meters thick, I think.

Jody Waugh. How does the design compare to Monticello?

Craig Benson. Its actually very similar to Monticello. Id say it is almost identical, except it doesnt have a geomembrane at the bottom and perhaps it is a little thinner.

Hans Arlt. If you put in a geomembrane at these sites, would that solve all the problems or not?

I'm not suggesting it because I know it costs money. I just want to find out if you put one in would 3-12

that solve the radon release and infiltration for at least 200 years? Let's just assume they last for 200 years and you have good quality control. If you don't have quality control then you can forget it, but if you have quality control let's assume it lasts for 200 years. I'm just curious whether anyone would have a problem with that?

Craig Benson. Im always anxious to answer questions asking whether we are going to solve all the problems. We are building composite barriers for hydrologic control and for gas emissions.

They work really well and they do last. We completed a study a few years back (Tian et al., 2016) with the latest science, not only ours. They last about 1,900-2,000 years for polyethylene of the type of materials we are creating now, that is, if it is embedded in the cover.

Tom Nicholson. The value of your membrane, I would think, is to stabilize the situation. You will have silt moving down through the riprap that will cause a fairly uniform layer. The geomembrane wont let it go any further, so this is causing a stable situation temporarily. Youd have to model it and think about plant succession and other things that will cause that geomembrane to fail and degrade eventually.

Jody Waugh. We went through this exercise with Monticello. We did a series of lysimeter studies to show that an ET cover would probably work there. It was a Superfund site, and so we're dealing with EPA. The EPA staff members said that they really liked this but they wanted us to put a geomembrane in there anyway. So we ended up with an ET cover, a radon barrier, but also the geomembrane. Thats what allowed us to create this huge lysimeter. We decided that if we're going to have a geomembrane, lets see whether we can capture water coming through the ET cover. EPA just decided that although it liked what we were doing, we needed to add the geomembrane.

Tom Nicholson. Did that add any value or just make people feel better?

Craig Benson. We don't really know. Even at Monticello, we could probably point to 0.2- or 0.3-millimeter-per-year percolation over 18 years. That 0.3 millimeter is really coming out on the membrane. Although at the bottom of the ET cover it is 0.3 millimeter, the membrane takes it from 0.3 millimeter to about zero, so there is reduction. Whether that reduces risk at all is hard to say. Monticello is a lined facility with a composite double liner with leachate collection. It does give you benefits by keeping things moist, itll keep roots away, and ants will not go through while it's there.

Roger Seitz. What is the cost difference?

Craig Benson. The cost difference is about 75 cents per square foot. Maybe in the DOE/EM world it is a dollar a square foot. You have to validate that its functioning.

Roger Seitz. That's one thing that Ive been trying to push. Since weve invested in these liners with the need for performance monitoring, that liner is your performance monitor and you're collecting leachate, especially for sites with a double or composite liner.

Nick Orlando. I have a couple of clarifying questions. First, you were sampling locations at four sites that were fairly biased. You focused on areas where it appeared that there was some changeslumping or where there were trees or deep-rooted plants. You saw no cases where there was an indication that the radon flux was different from the as-built in areas that weren't impacted, is that correct?

3-13

Craig Benson. Well, we didn't really have a true control, I guess. We did bias our sampling.

Nick Orlando. So the areas where you did your biased sampling, you saw some increases in the radon flux over the as-built?

Mark Fuhrmann. At one site I know the average of the as-built and the average of our sampling were very similar. I think maybe they were each biased in different ways, but you know it's very hard to determine for something done 20 years ago.

Nick Orlando. My point is that the burrowing animals, burrowing insects, and deep-rooted plants seem to be the problem for disrupting the cover. The shallow-rooted plants maybe not so much, with the dust coming in. Is that mostly a 60-percent true statement?

Morgan Williams. Just speaking to the morphology of the plants, even the shallow-rooted plants like the grasses have root structures that penetrate through the radon barrier. Those factors seem to control hydrologic properties more so than coarsely rooted vegetation because they're more evenly distributed, and fine roots are everywhere. [Editors note: at Bluewater, the plant-impacted location was pit 5, where the bottom flux was 1.85 Bq/m2-s with an average top flux of 0.63 (n=6), and the nearby, unvegetated control was pit 4 with a bottom flux of 11.99 Bq/m2-s with an average top flux of 0.018 (n=8). Both bottom fluxes were substantial.

Thus, the unvegetated location (with an attenuation factor of 670) provided much greater retention of radon than did the vegetation impacted location (with an attenuation factor of 2.9).]

Nick Orlando. For the most part, the current suite of sites in the DOE portfolio is rock armored. I can think of two or three that are grassShirley Basin South and Fall City.

Jody Waugh. The top slope of Durango is vegetated.

Nick Orlando. Right now, the long-term surveillance plan that DOE uses to manage the sites includes provisions for repair and maintenance and emergency procedures. There is a little table in the back of the plan that says a category 5 or a priority 5 (I won't call it an emergency, but a priority 5 thing) is the observation of any vegetation. If the majority of the sites are rock armored and the issue is burrowing plants, burrowing insects, and deep-rooted plants, DOE is supposed to be addressing those. If theres a regulatory mechanism in place that appears to address the main causes of potential disruption, like plants or animals, what is going to be the regulatory outcome?

You are going to do all this great science. Mark will have his lead analog figured out. What do we do if the majority of the issue is something that can pretty much be resolved just by close inspection of the site and spraying plants? It is not the best thing to do, but the risk of pulling up an acacia tree is probably pretty low. So keep that in mind, that from a regulatory perspective some of these problems may already be taken care of. Focus on what the regulatory outcome of all of this will be. What is the regulator going to do to DOE or the State or whomever is the long-term custodian based upon what your science shows?

Craig Benson. That is the synthesis part, what are the impacts in terms of regulation or design?

Nick Orlando. There may already be a regulatory mechanism that is addressing some portion of the problem.

Jody Waugh. I think thats right. When we focus on the radon part, there is a regulatory mechanism. If we remove the plants, the barrier stays moist. We have lower radon diffusion and flux by removing the plants. However, this is the tradeoff I was trying to illustrate yesterday.

3-14

At some of the sites, perhaps water percolation would be a greater risk than an increase in radon flux, such as at Bluewater. By removing the plants and maintaining the rock cover, we're essentially harvesting water because were reducing evaporation. Where will that water go? My lysimeter studies are suggesting that we will get an increase in percolation flux. Theres the tradeoff with the plants. If we were just focused on radon flux using the mechanisms in place to get rid of the plants, we are going to have a wetter cover, especially with rock on it. How about those sites where we have a ground water problem and were concerned about the tailings as a continuing source for ground water contamination? At those sites where ground water may be the greater risk, maybe we should be managing the water balance, and plants help us do that. That's the tradeoff; we have to look at this on a site-by-site basis.

Craig Benson. I think the impact from a regulatory perspective informs decisionmaking. I take an action, I have a series of consequences in the field. Do we go in and remove all the plants or do we think about what's the priority here? Maybe radon flux will go up but maybe it's low enough that is doesnt make a difference. I've been worrying more about the ground water.

Hans Arlt. I work in performance assessment and the answer is almost always site specific.

Tom Nicholson. Thats right. It is the risk that you're focusing on. Glendon Gee said, why are you dumping all this rock on top of those Hanford tanks where you're just creating a recharge mound? You need to know what causes the risk to increase dramatically. How does something malfunction? For instance, it isn't just vegetation, it's the type of vegetation. Some vegetation grows deeper roots. They could be the pathways of fluids. You have to understand the site and get into the conceptual model and tie it directly to risk; risk in the short term and the long term.

Jody Waugh. My understanding is the regulatory mechanism isn't in place for us to manage these sites as risk-informed performance monitoring like we're talking about. We have a long-term surveillance plan, and for a lot of the sites that plan says spray the vegetation. We follow the plan. That was one of the questions that came out of the 2011 workshop. How might the regulations change if they become more based on risk-informed performance monitoring? If they do change, how does DOE/LM go about monitoring these sites to demonstrate performance?

Nick Orlando. Is DOE considering proposing to let the vegetation grow on one site and see what happens? And change the long-term surveillance plan? Is that the proposal?

Jody Waugh. We did back in the 1990s on the Burrell site. We measured hydraulic conductivity with air-entry permeameters where the deep-rooted plants were growing, we measured the moisture content, we reran RAECOM with those in situ water contents, and we came to the conclusion that the plants growing really didnt matter. We submitted that to the NRC, we proposed to change the long-term surveillance plan and let the plants grow. The NRC agreed, and so there is a model of change. Theres a case history.

Craig Benson. At Cheney right now, we've got side-by-side experiments, in which we ran test covers identically for 7 years and now we are letting one of them go.

Jody Waugh. I should mention that at Burrell there are 4 curies of radium in the whole thing, so it is exceptionally low.

3-15

Craig Benson. I think this has been really helpful. We're going to prepare a document from this workshop. I don't know about the process but it would be good if people have a series of recommendations in that document. It would be good to get all the different stakeholders to reflect on those as part of our review process.

Tom Nicholson. The NRC put on a workshop in 2010. What has changed in those years?

Where is the focus today? I think it would be very helpful if you prepared conference proceedings.

The public was not here, and the States were not here, but Im sure we would be very interested in seeing what comes out, not only the conference proceedings from this workshop but also the white paper that youre talking about.

Craig Benson. I was thinking about what's going on at White Mesa. The last workshop proceedings came out in 2011. It drove White Mesa to a different type of design.

Tom Nicholson. I also was thinking about what Ming Zhu brought up earlier. What we are doing now is moving towards the risk informed. Hes saying that Craig and Roger are helping him look at uncertainties and other issues. I think that we didnt discuss that much in 2010. We did talk more about disruptive scenarios. We did talk about some modeling, like using the Siberia code, but, as Mark brought up earlier, are we looking at individual, very localized issues and trying to expand that over the whole site? How do you understand the whole site performance as opposed to individual locations?

Craig Benson. We've done a lot of one-off analysis, and I think we really need to begin to think of it as a system as opposed to pieces. Ming Zhus group, the Performance Assessment Community of Practice, is really a great vehicle to share a lot of this information. In 2011, it was kind of still nascent and was just really taking off. That group has become very active, so that's a good vehicle for this type of activity.

Ming Zhu. We will make sure to invite you all to our next meeting so that you can hear some discussion, or it would be very good for you to share some of your presentation information with the group.

Craig Benson. Thank you everybody.

Mark Fuhrmann. I'd like to thank Tom Aird especially for helping out with the webinar.

3-16

4 REFERENCES 10 CFR 40.28, General License for Custody and Long-Term Care of Uranium or Thorium Byproduct Materials Disposal Sites.

10 CFR 51.22(c)(6) Criterion for Categorical Exclusion.

40 CFR 192.02, Standards, Subpart A, Standards for the Control of Residual Radioactive Materials from Inactive Uranium Processing Sites.

Arlt, H., R.L. Johnson, D. Mandeville, G. Alexander, M. Meyer, J. Philip, J. Kanney, M. Fuhrmann, and T. Johnson, Documentation of the Engineered Covers Technical Group (ECTG) Activities by U.S. NRC Staff, 2011 (ADAMS Accession No. ML112300105).

Benson, C., W. Albright, M. Fuhrmann, W. J. Likos, N. Stefani, K. Tian, W. J. Waugh, and M.

M. Williams, Radon Fluxes from an Earthen Barrier Over Uranium Mill Tailings after Two Decades of Service, WM-2017, 2017 Waste Management Conference, March 5-9, 2017, Phoenix, Arizona, USA.

CNWRA, Analysis of Mill Tailings Cover Performance, August 2012 (ADAMS Accession No. ML12256A992).

CNWRA, Evaluation of Approaches to Simulate Engineered Cover Performance and Degradation, October 2007 (ADAMS Accession No. ML072950120).

CNWRA, Methods for Monitoring Net Inflow Through Soil Covers of Uranium Mill Tailings Impoundments, November 2013 (ADAMS Accession No. ML14015A328).

CNWRA, Modeling of Net Infiltration through Soil Covers at Selected Title II Uranium Mill Tailings Sites, April 2015 (ADAMS Accession No. ML15121A610).

CNWRA, Software Validation Test Plan and Report for Channel-Hillslope Integrated Landscape Development (CHILD) Version 2.3.0, November 2008 (ADAMS Accession No. ML083360379).

CNWRA, Software Validation Test Plan and Report for EAMS Version 2.09 and SIBERIA Version 8.33, October 2008 (ADAMS Accession No. ML083020359).

CNWRA, Software Validation Test Plan and Report for GeoStudioTM VADOSE/W© 2007 Version 7.11, October 2008 (ADAMS Accession No. ML082980094).

CNWRA, Uranium Tailings ImpoundmentsBottom Liners and Their Performance, January 2015 (ADAMS Accession No. ML15055A117).

Department of Energy Order 435.1 Radioactive Waste Management.

National Research Council, 2005, Mineral Tolerance of Animals: Second Revised Edition, The National Academies Press, Washington, DC, https://doi.org/10.17226/11309.

NRC Regulatory Guide 3.64, Calculation of Radon Flux Attenuation by Earthen Uranium Mill Tailings Covers, 1989.

4-1

NUREG/CP-0195, Proceedings of the Workshop on Engineered Barrier Performance Related to Low-Level Radioactive Waste, Decommissioning, and Uranium Mill Tailings Facilities, August 3-5, 2010, T.J. Nicholson and H.D. Arlt, August 2011 (ADAMS Accession No. ML11238A056).

NUREG/CR-2765, A Mathematical Model for Radon Diffusion in Earthen Materials, K.K.

Nielson and V.C. Rogers, 1982.

NUREG/CR-3533, Radon Attenuation Handbook for Uranium Mill Tailings Cover Design, Rogers, V.C., K.K. Nielson, D.R. Kalkwarf, 1984.

NUREG/CR-7028, Engineered Covers for Waste Containment: Changes in Engineering Properties and Implications for Long-Term Performance Assessment, Volumes 1 and 2, C.H.

Benson, W.H. Albright, D.O. Fratta, J.M. Tinjum, E. Kucukkirca, S.H. Lee, J. Scalia, P.D.

Schlicht, and X. Wang, December 2011 (ADAMS Accession No. ML12005A110).

NUREG/CR-7200, Influence of Coupling Erosion and Hydrology on the Long-Term Performance of Engineered Surface Barriers, C.L. Smith and C.H. Benson, May 2016 (ADAMS Accession No. ML16125A124).

NUREG-1623, Design of Erosion Protection for Long-Term Stabilization, 2002 (ADAMS Accession No. ML052720285).

NUREG-1748, Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, 2003 Rogers, V.C., K.K. Nielson, Correlations for Predicting Air Permeabilities and 222Rn Diffusion Coefficients of Soils, Health Physics, pp. 225-230, Vol. 61, #2, 1991.

Tian, K., C. Benson, and J. Tinjum, Antioxidant Depletion and Service Life Prediction for HDPE Geomembranes Exposed to Low-Level Radioactive Waste Leachate, J. Geotechnical

& Geoenvironmental Eng., Vol. 143, # 6, June 2016.

4-2

WORKSHOP ATTENDEES Name E-Mail Address David Esh david.esh@nrc.gov Lloyd Desotell lloyd.desotell@nrc.gov Lifeng Guo lifeng.guo@nrc.gov Randall Fedors randall.fedors@nrc.gov Cynthia Barr cynthia.barr@nrc.gov Greg Chapman gregory.chapman@nrc.gov George Alexander george.alexander@nrc.gov Mike Salay michael.salay@nrc.gov Dominick Orlando dominick.orlando@nrc.gov John Saxton john.saxton@nrc.gov James Webb james.webb@nrc.gov Doug Mandeville douglas.mandeville@nrc.gov Robert Evans robert.evans@nrc.gov Thomas Nicholson thomas.nicholson@nrc.gov Bill Von Till bill.vontill@nrc.gov Ron Linton ron.linton@nrc.gov Joseph Kanney joseph.kanney@nrc.gov Meredith Carr meredith.carr@nrc.gov Jacob Philip jacob.philip@nrc.gov Zahira Cruz zahira.cruz@nrc.gov Varughese Kurian varughese.kurian@nrc.gov Elise Striz elise.striz@nrc.gov Thomas Lancaster thomas.lancaster@nrc.gov Mark Fuhrmann mark.fuhrmann@nrc.gov Hans Arlt hans.arlt@nrc.gov Mike Cheok michael.cheok@nrc.gov Mark Thaggard mark.thaggard@nrc.gov Andrea Kock andrea.kock@nrc.gov Thomas Aird thomas.aird@nrc.gov Justin Marble justin.marble@em.doe.gov Skip Chamberlain grover.chamberlain@em.doe.gov Sherri Ross sherri.ross@em.doe.gov A-1

Name E-Mail Address Juan Morales juan.morales@em.doe.gov Silvia Garcia silvia.garcia@em.doe.gov Ximena Lugo ximena.lugo@em.doe.gov Ming Zhu ming.zhu@em.doe.gov Kurt Gerdes kurt.gerdes@em.doe.gov Jaffet Ferrer-Torres jaffet.ferrer-torres@hq.doe.gov Craig Benson chb4x@virginia.edu Jody Waugh jody.waugh@lm.doe.gov Morgan Williams morgan.williams@berkeley.edu William Likos likos@wisc.edu A-2

NUREG/CP-0312 Proceedings of the Radon Barriers Workshop August 2019 July 25-26, 2018 NRC Headquarters, Rockville, MD Mark Fuhrmann, Craig Benson, Jody Waugh, Morgan Williams and Technical Hans Arlt Division of Risk Analysis Office of Nuclear Regulatory Research U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Same as Above The Radon Barriers Project is a research program to study the effects of changes in the properties of in-service engineered earthen covers over uranium mill tailings as these covers age. Field studies were conducted at four mill tailing disposal sites: Falls City in Texas, Bluewater in New Mexico, Shirley Basin South in Wyoming, and Lakeview in Oregon. Small areas on these sites were excavated, radon fluxes were measured, numerous observations were made, and samples were taken for a variety of parameters, such as saturated hydraulic conductivity, root counts, moisture, density, lead-210 concentrations, soil texture, structure, chemistry, and nematode counts.

On July 25-26, 2018, a one-and-a-half-day workshop took place at NRC Headquarters to discuss findings from the project with regard to the current state of the barriers and comparison to their as-built condition and natural analog sites, prediction of long-term evolution, monitoring approaches, and long-term implications.

Presentations included detailed background and project findings that included: radon fluxes, diffusion coefficients and transport times, ecology, hydraulic conductivity changes and depth profiles, soil structure, impacts of plants and insects, soil architecture, soil biology, and Pb-210 profiles.

Uranium mill tailings, disposal of uranium mill tailings, UMTRCA covers, radon barriers, radon fluxes, radon diffusion coefficients, radon transport times, ecology, hydraulic conductivity, soil structure, impacts of plants and insects, soil architecture, soil biology, Pb-210.

NUREG/CP-0312 Proceedings of the Radon Barriers Workshop August 2019