NRR-DRMAPEm Resource From: Zoulis, Antonios Sent: Friday, August 16, 2019 3:50 PM To: Miller, Ed Cc: Weerakkody, Sunil
Subject:
IP Revisions(August 2019).pptx Attachments: IP Revisions(August 2019).pptx Ed, Attached are my slides for the August 21, 2019 public meeting.
Antonios 1
Hearing Identifier: NRR_DRMA Email Number: 181 Mail Envelope Properties (BN7PR09MB26923F0017BFD95B1F5E707CE2AF0)
Subject:
IP Revisions(August 2019).pptx Sent Date: 8/16/2019 3:50:05 PM Received Date: 8/16/2019 3:50:08 PM From: Zoulis, Antonios Created By: Antonios.Zoulis@nrc.gov Recipients:
"Weerakkody, Sunil" <Sunil.Weerakkody@nrc.gov>
Tracking Status: None "Miller, Ed" <Ed.Miller@nrc.gov>
Tracking Status: None Post Office: BN7PR09MB2692.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 93 8/16/2019 3:50:08 PM IP Revisions(August 2019).pptx 2221305 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Inspection of Risk-Informed Initiatives Antonios M. Zoulis, Branch Chief PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation August 21, 2019
Risk-informed Inspection Procedure Changes
- Guidance to inspectors when conducting Reactor Oversight Process baseline inspections of 10 CFR 50.65 (maintenance rule), 10 CFR 50.69 (risk-informed categorization and treatment of equipment),
and risk-informed Technical Specification initiatives such as Risk-Informed Completion Times (4B) & Surveillance Frequency Control Programs (5B).
- Intended to provide a better understanding of the regulatory framework, as well as focus inspector efforts.
- Inspection procedure sample size and level of effort remains the same.
- Intent is for the Inspection Procedures to be finalized and in place by January 1, 2020.
2
Risk-informed Inspection Procedure Changes (Cont.)
Draft IPs: ADAMS Package No. ML19197A293
- IP 71111.12, Maintenance Effectiveness
- 10 CFR 50.69 / aging management / new format
- IP 71111.13, Maintenance Risk Assessments and Emergent Work Control
- Risk Informed Completion Times (RICTs)
- IP 71111.18, Plant Modifications
- 10 CFR 50.69 / TS Surveillance Frequency Control Program / RICTs
- IP 71111.22, Surveillance Testing
- TS Surveillance Frequency Control Program
- IP 71153, Follow-up of Events and Notices of Enforcement Discretion
- 10 CFR 50.69 3
Questions?