L-2019-163, Supplement to License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1
| ML19226A366 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/14/2019 |
| From: | Stamp B Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2019-163 | |
| Download: ML19226A366 (1) | |
Text
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D C 20555-0001 RE:
Turkey Point Nuclear Plant, Unit 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DPR-31 and DPR-41 August14,2019 L-2019-163 10 CFR 50.90 Supplement to License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1
Reference:
FPL Letter L-2018-065, License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1, May 3, 2018 (ADAMS Accession No. ML18123A552)
In the referenced letter, Florida Power & Light Company (FPL) requested amendments to Renewed Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Nuclear Plant Units 3 and 4 (Turkey Point),
respectively. The proposed license amendments revise the Turkey Point Technical Specifications (TS) by revising Reactor Core Safety Limit (SL) 2.1.1.b, to reflect the peak fuel centerline melt temperature specified in WCAP-17642-P-A, Revision 1, "Westinghouse Performance Analysis and Design Model (PADS)".
In the referenced letter, FPL also stated that the approved amendments will be implemented for the Unit 3 Cycle 31 and Unit 4 Cycle 32 reload campaigns scheduled in Spring 2020 and Fall 2020, respectively. Due to unforeseen delays, FPL will implement the amendments for the Unit 3 Cycle 32 and Unit 4 Cycle 32 reload campaigns, currently scheduled in Fall 2021 and Fall 2020, respectively.
Should you have any questions regarding this supplement, please contact Mr. Robert Hess, Turkey Point Licensing Manager, at 305-246-4112.
This letter contains no regulatory commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 14th day of August 2019.
Sincerely, Brian Stamp Site Director, Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035