ML19225C815

From kanterella
Jump to navigation Jump to search
Forwards LER 79-047/04L-0
Date released: 08/27/2019 Download: ML19225C815


LER 79-047/04L-0 on 790627:condenser Vacuum Pump Radiation Monitors Inoperable More than Seven Days During Mode 1 Operation.Caused by Moisture Buildup.Engineering Evaluation Is Being Conducted
ML19225C819
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/27/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19225C819 (1)
Forwards LER 79-047/04L-0
ML19225C814
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/27/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19225C814 (1)