ML19225C779

From kanterella
Jump to navigation Jump to search
Submits Class III Fee Required by NRC for Inservice Testing Program Review
ML19225C779
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/27/1979
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 7908020429
Download: ML19225C779 (1)


Text

A;aDama Power Company 600 North 18th Street y

Post Office Box 2641 Birmingham. Alabama 35291 Telephone :'05 323-5341 k

L L';j'fei,1Cnt AlabamaPower tre wumm eectre s,1:em July 27, 1979 Docket No. 50-348 Farley Unit 1 Inservice Testing Program Mr. A.

Schwencer, Director Office of Nuclear Reace.or Regulation U. S. Nuclear Regulatory Cot:: mission Washington, D.C.

20555

Dear Mr. Schwencer:

RE: Letter dated May 1, 1979 from F. L.

Clayton, Jr. to A. Schwencer On May 1, 1979 Alabama Power Company mailed its Joseph M. Farley Nuclear Plant - Unit No. 1 Inservice Testit.g Program to Mr. A. Schwencer under the provisions of 10CFR50.55a(g), which states it shall be ravised at each 20-month interval of plant operation.

Alabama Power Company was notified by Mrs. Diggs, NRC, that a fee was required for review. Ther-fore, Alabama Power Company submits a check for $4,000.00 in accordance with ICCFR170.22.

The approval is considere Class II because it involves only a single safety issue and is deemed not to. colve a significant hazards consideration.

Yours very truly, j

F. L. Claytog, Jr.

FLCJr/ KAP:bhj cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge

$Db o

44'o aI cf.

v s

p

$@/.

V) n i

up my