Text
'
r t'odi fl ~a t ion f'o.
2
' ~~
r:
r;-7~c SUPPLEMrflTAL AGREEMEiii BET'JEEi!
TEXAS TECH UliIVERSITY A!;D THE U. S. fiUCLEAR REGULATORY COMMISSIO:1 THIS SUPPLEMEi;TAL AGREEl Etii, effectise the 1st day of October, 19 78, by and between the UillTED STATES OF AMERICA (hereinaf ter referred to as the "Goverr, ment"), as represented by the U !ITED ST/
.S f;UCLEAR REGULATORY CCP:115-510:1 (hereinaf ter referred to as the "Conmission"j, and TEXAS TECH Uf1IVERSITY (hereinafter referred to as the " Contractor"),
WITflESSETH THAT:
as hereinafter
'JHEREAS, the parties desire to modi fy Contract tio. I;RC-C4-77-016 provided, and this supplemental agreement is authorized by lav., including the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of 1954, as amended.
f;0' '., THEREFORE, said contract is hereby modified as follows:
Appendix A, attached to this supplemental agreement and rude a part hereof, 1.
provides for the research to be performed by the Contractor during the contract period specified therein.
2.
In Article II - The Period of Performance, the date " September 30, 1979 "
is substituted for the date " September 30, 1978".
3.
In Article III - Ccnsideration, the sum "$ 104,737.00" is substituted for the tim "$ 69,780.00.".
AA2 341 7908020 N 6
i_..
Contract 1,0. I,RC-04-7/-016 Paga !!o. 2 St.
p, ;, - h ve c:, ecuteu th i s dect.:
- . '. ! Tl;:::'
..i CE, t.
U:Oi E STATEE Cf T.",:.?CA 7 r,~
/m ye) 4[d( dt AG BY: %iMey TEllogg i I i'orton, Chief Research ontracts Bran _ch_
m t i.2 t i e )
i;uc. lear Regulatory Comission TEXAS TECH UTHVERSITY
/
Q D
W V
3
- .7,ct,T y,-3:(/
B Y '-
, nos-President .r Ros arch &
-Graduate-Swd je dl el
~
certify th?t I am the I,. _ _Janic_Blount (a:._.:er) of the Contractor named Scurernrv EcscracinScryicos (tiL!e) under this document; that J.
Knov Jones p r-( s i gnato ry )
a,t on behal f of said Contractor wcs then who signed this do:
of said Contractor; that Vice Prerident_f
_Research this document ',ias duiy signed for and on behalf of said Contractor by authority of its 90. rning body and is within the scope of its legal pc..e rs.
hereurto affixed my hand and the real of If! WITIESS WHrREOF. : havo said Cortracter.
/,
y '
A '"
e
/
v (SEAL) 442 342
u E,p n. <n:.al /,g u a. :. a Contract f?o. IJRC-04-77-01 CC:;TECTCR:
I E :' /15 ii a U:;Ph B,1IY APPE:,' DIX A For the Contract period October 1, 1973 through September 30, 1979 Article A-I RESEARCH TO BE PERFORMED BY CC:; TRACTOR (a) The unclassified scope of work under tha. contract, entitled, " Kinematics of Transiating icrnada Wind Fields" incl a, the following:
(1)
Simulate translating tornado windfields, emphasizing effects of speed / direction chan;,us in damage patterns; (2)
Explcrc the roie of dust in mc,~ication of winds
..ith n ternado-like vortices; (3)
Ex y nd and systematize a compri'unsive tornado literature collection, proriucing a tornade-event data tape and asst abling special topic bibliographies; (4) Collaborate with engineers in e:mination of tornado winc fields.
(b)
The Principal Investicator expects to cevote the following approxima ce amoun:(s) of ame t.c the con:ract ucr::
R. Pet r;on =
45 of time for 9 t
- ns of' academic year and 1003 of time for 3 '
nec months ARTICLE A-II WAYE A :D MEAi!S OF PERFOR 'AT;CE (a)
Items for which support will be provida:. as indicated in A-Ill, below 9
1,016.00 (1)
Salaries and Wages (2)
Equipment to be purchased or fabricated by the Contractor
$ (3)
Trcvel (i)
Domestic
),000.00 0
(ii)
Foreicn
$_ f 7 -
m-( '. '
C;her direct costs including frir' Denefits
/E:
'ndirec: c'st: br ed cn a predc..
.ed rate of 52 per. en-2pplic2ble
" a l a r : t s anc wa ge:,.
ta
Modification No. 2
<:oplemental Agreement to f ont ra ct ':0
- _7._77_m,g S-n-dix A La pc 2 (b)
Items, if any, significant to the perform;. ice of this ccatract, but excluded from ccmputation of Support Cost and frca consideratica in proportioninc r.osts:
NO::[
(c)
Time or effort of Principal Investigattr(s) including indirect c::t:
and fringe benefits contributed by Contractor but 'xclude ' from ::m-putation of Support Cost and from consideration proportioning costs:
R. Peterson = 20% of time for 9 months of academic year Article A-III The total estimated cost of items under A-II(a) above for the centrac:
eriod stated in this Appendix A is S 34,957.00
- the Ccmmission will pay 10; percent of the actual costs of these items incurred during the contract perici stated in this Appendix A, subject to the provisions of Article -III and Article S-XX'!I I I.
The estimated NRC Support Cost fc-the contract period statec in this Appendix A is 5 34,957.00 The tstimated NRC Support Cost is funded as follows:
(a)
Estimated unexpended balance from prior ceriod(s) 9-(b)
New funds for the current period
$ 34.
7.00 (c)
The new funds being added in A-III(b) constitute the basis for ad.ance payments provided under Article B-X.
442 34$'