Responds to IE Bulletin.No GE Type AK-2 Circuit Breakers Used in Unit 2 & No Plans for Future Use.Breakers Installed in Unit 1 Control Rod Drive Sys Are Maintained Per Inservice Insp Procedure
ML19225C554
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/10/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 7908010038
Download: ML19225C554 (2)


Text

Y

CENTRAL FILES PDR:HQ A b ..?

NSIC ARKANSAS POWER Cs LIGHT COMPAN',

POST OFFICE BOX 551 LITTLE ROCK ARKANSAS 72203 (5011371-4000 May 10, 1979 1-059-15 2-059-11 Mr. K.V. Seyfrit, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Subject:

Arkansas Nuclear One - Units 1 E 2 Docket Nos. 50-313 & 50-368 License Nos. DPR-51 & NPF-6 IE Bulletin No. 79-09 (File: 1510.1, 2-1510.1)

Gentlemen:

The following is provided in response to your IE Bulletin 79-09.

We have determined that there are no GE type AK-2 circuit breakers installed in our Unit 2 (NPF-6). Additionally, we have no intentions of using the subject breakers in Unit 2 in the future.

We have identified two (?) locations in Unit 1 (DPR-51) where we have GE type AK-2A 25-1 circuit breakers installed. These are installed in parallel in the Control Rod Drive System. We have no plans to install additional breakers of the same type in Unit 1 in the future.

The GE type AK-2 circuit breakers instelled in the CRDS of ANO-1 are inspected and maintained as required by our CRD Breaker In-Service Inspection Procedure 1405.17. This inspection is performed every refueling outage by experienced Plant Maintenance Electricians. The recommended corrective actions as described in GE Service Advice Letter No.175/CPDD) 9.3 are incorporated within the above mentioned procedure.

443 303 (g,.,

03% o 7908010 <9 f

MEMDER M100LE SOUTH UTtuTiES SYSTEM

T. .

r In addition to the In-Service Inspection, conducted every refueling outage, the subject breakers are tripped and reset once a month during the Reactor Protection System Monthly Surveillance check to ensure their proper operation.

Very truly yours,

~

bcw&l C. %A David C. Trimble Manager, Licensing DCT:MW:gw cc: Mr. florman L. fioseley Director, Division of Reactor Operations Inspection Nuclear Regulatory Commission 4350 East West Highway Bethesda, Maryland 20555 Mr. W.D. Johnson U.S. fluclear Regulatory Commission P. O. Box 2090 Russellville, AR 72801 3i)//