Forwards IE Insp Rept 70-0025/79-03 on 790326-30.No Noncompliance Noted
ML19225C407
Person / Time
Site: 07000025
Issue date: 05/14/1979
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Remley M
ROCKWELL INTERNATIONAL CORP.
Shared Package
ML19225C408 List:
References
NUDOCS 7907300245
Download: ML19225C407 (2)


Text

?) G p

'A Il n o

[# %

UNITED STATES

/

>t NUCLEAR REGULATORY COMMiss!ON D

REGION V l.

SulTE 202. W ALNUT CREEK PLAZ A 8

%, ' t

,o 1990 N. C ALIFO R *dl A BOULEG R D

  • eee*

W ALNUT CREEK CALIFORNI A 94596 q

L3 Ef. ~.. ISB mM

[j Docket ilo. 70-25 t i Energy Systams Group Rockwell international Corporation 8900 Desoto Azenc2 Canoga Park, California 91304 Attentica:

Dr. M. E. Remley, Manager Health, Safety and Radiation Services Gentlemen:

Suoject: NRC Inspection at Headquarters and NFuL Sites This refers to an inspection conducted by Messrs. W. J. Cooley and F. F. Fong of this office on March 26-30, 1979 and to the discussions held by them with Messrs. R. J. Jones and M. E. Remley of your staff at the conclusion of '.1e inspection.

Areas examir.ad during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views wi',3 personrel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the scope of this inspection.

During the inspection cne item was cbserved which, while not an item of

'f noncompliance, gave the inspectors concern.

It was observed that the j

final publication of the Nuclear Safety Analysis addressed to changes in N

storage configurations in the Desoto Avenue main vault had not been D

accomplished. Those changes ~ curred near the end of December,1978. It d) was observed that the requireo criticality calculations for the change in the vault configuration had been accomplished, reviewed by the Chair-d man of the Fuels Committee, and reviewed by a member of the Reactor L

Physics Gr'up.

Nevertheless, we believe the Nuclear Safety Analysis publicatic should be accomplished prior to the implementation of changes o this magnitude. No reply to this observation is required at this time 7907300245 o/C/1 434 19 f'

,- ;;,y

~ ~~ f. s '.

I'IS 2-IE/9 Energy Systems Group In accordance with Section 2.790 of the NRC's " Rules of Practice,"

r Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

"?

the enclosed inspection report will be placed in the NRC's Public

!.p Document Room.

If this report contains any information that you believe

'f to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, requesting 3

)j that such information be withheld from public disclosure.

The applica-tion must include a full statement of the reasons why it is claimed that the information is proprietary. The application should be prepared so a

~

thsc any prop ietary information identified is contained in an enclosure to the application, since the application without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glau to discuss them with you.

Sincerely, H. E. Book, Chief Fuel Facility and Materials Safety Branch Enclostre:

IE Inspe ction Report No. 7T-25/79-03 r-)