ML19225C360

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 9 to License NPF-5
ML19225C360
Person / Time
Site: Hatch 
Issue date: 07/05/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19225C355 List:
References
FRN-790705, NUDOCS 7907270350
Download: ML19225C360 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N0. 50-366 GEORGIA POWER COMPANY, ET AL.

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY j

OPERATING LICENSE The U. S. Nuclear Regulatory Corm 11ssion (the Commission) has issued Amendment No. 9 to Facility Operating License No. HPF-5 issued to Georgia Power Company, Oglethorpe Electric Membership Corporation, Municipal Electric Association of Georgia and City of Dalton, Georgia, which revised Technical Specifications for operation of the Edwin I. Hatch Nuclear Plant', Unit No. 2, located in Appling County, Georgia.

The amendment is effective as of its date of issuance.

This amendment modifies temporarily the Technical Specifications by deleting the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) System isolation signals on indicated high steam flow on the HPCI and RCIC steam supply lines.

This temporary change will pemit the conduct of the special startup testing as described it your submittal.

The application for the amendment complies with the standards and requirements or the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Comission has made appro-priate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, 4ch are set forth in the license amend-ment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

427

073, 7907270 3 f D O

/

.. The Conmission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(3)(4), an environmental impact sta'ement or nega-tive declaration and environmental impact appraisal need not be prepar :d in connection with issuance of this amendment.

For further details with respect to this action, see (1) the appli-cation for amendment dated July 2,1979,(2) Amendment No. 9 to License No. NPF-5, and (3) the Cocu ;sion's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C., and at the Appling County Public Library, Parker Street,iBaxley, Georgia 31513.

A single copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Maryland this 5th day of July 1979.

FOR THE NUCLEAR REGULATORi COMMI'SSION M

Thomas A/)/ Wppolito, Chief Operating Reactors Branch #3 Division of 0,;erating Reactors 427 0 13