Similar Documents at Surry |
---|
Category:E-Mail
MONTHYEARML24282A9732024-10-0808 October 2024 Temporary SW Piping LAR Acceptance Email ML24116A2822024-04-25025 April 2024 Acceptance of Requested Licensing Action: Surry TS Change Section 3.8 Containment Temperature and Pressure Requirements and Surveillances ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24075A1762024-03-15015 March 2024 Email, Acceptance of Requested Licensing Action: Surry TSTF-577, Rev. 1 ML24144A2432024-03-0808 March 2024 002 Radiation Safety Baseline Inspection Information Request ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML23058A1442022-12-0909 December 2022 Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22277A7252022-10-0303 October 2022 Additions to Turbine Bldg Wind Load Audit ML22256A3032022-09-13013 September 2022 Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR ML22256A2312022-09-13013 September 2022 Acceptance Email TS Change for New Fuel Framatome Agora and SFP Criticality Review ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR ML22223A1182022-08-0404 August 2022 2022004 - Plant Surry RP Inspection - Document Request Letter E-mail ML22200A1032022-07-19019 July 2022 Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22193A0052022-07-11011 July 2022 Acceptance of Requested Licensing Action: Admin Changes to Technical Specifications ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22161B0052022-06-0909 June 2022 Acceptance Email TSTF 547 LAR ML22137A1622022-05-17017 May 2022 Acceptance of Requested Licensing Action Amendment Turb Bldg. Loading Basis Change License Amendment Request ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b ML21144A2592021-05-0606 May 2021 003 Radiation Safety Baseline Inspection Information Request 2024-04-25
[Table view] Category:Inspection Report
MONTHYEARIR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) IR 05000280/20230022023-08-0404 August 2023 – Integrated Inspection Report 05000280/2023002 and 05000281/2023002 IR 05000280/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000280/2023001 and 05000281/2023001 IR 05000280/20234012023-04-21021 April 2023 – Security Baseline Inspection Report 05000280 2023401 and 05000281 2023401 ML23086B9172023-03-24024 March 2023 Steam Generator Tube Inspection Report for the Fall 2022 Refueling Outage IR 05000280/20220062023-03-0101 March 2023 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2022006 and 05000281/2022006 ML23041A0232023-02-13013 February 2023 Integrated Inspection Report 05000280/2022004 and 05000281/2022004 IR 05000280/20220032022-11-0707 November 2022 Integrated Inspection Report 05000280/2022003 and 05000281/2022003, Operation of an Independent Spent Fuel Storage Installation Report 07200055/2022001, and Exercise of Enforcement Discretion IR 05000281/20224022022-10-21021 October 2022 Security Baseline Inspection Report 05000280/ 2022402 and 05000281/2022402 IR 05000280/20224042022-10-19019 October 2022 Security Baseline Inspection Report 05000280/2022404 and 05000281/2022404 IR 05000280/20224032022-09-0808 September 2022 Security Baseline Inspection Report 05000280/2022403 and 05000281/2022403 IR 05000280/20220052022-08-24024 August 2022 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Reports 05000280/2022005 and 05000281/2022005) IR 05000280/20220022022-08-0404 August 2022 Integrated Inspection Report 05000280/2022002 and 05000281/2022002 Final IR 05000280/20220112022-07-0606 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000280/2022011 and 05000281/2022011 IR 05000280/20220012022-05-11011 May 2022 Integrated Inspection Report 05000280/2022001 and 05000281/2022001 IR 05000280/20224012022-03-29029 March 2022 Security Baseline Inspection Report 05000280/2022401 and 05000281/2022401 IR 05000280/20224052022-03-22022 March 2022 Material Control and Accounting Program Inspection Report 05000280/2022405 and 05000281/2022405 IR 05000280/20220102022-03-15015 March 2022 NRC Inspection Report 05000280/2022010 and 05000281/2022010 IR 05000280/20210062022-03-0202 March 2022 Annual Assessment Letter for Surry Power Station, Units 1 and 2 (Reports No. 05000280/2021006 and 05000281/2021006) IR 05000280/20210042022-02-11011 February 2022 Integrated Inspection Report 05000280/2021004 and 05000281/2021004 IR 05000280/20210032021-11-24024 November 2021 Integrated Inspection Report 05000280/2021003 and 05000281/2021003 IR 05000280/20213012021-11-10010 November 2021 NRC Operator License Examination Report 05000280/2021301 and 05000281/2021301 IR 05000280/20210112021-11-0101 November 2021 Triennial Fire Protection Team Inspection Report 05000280/2021011 and 05000281/2021011 ML21265A4532021-10-0505 October 2021 Inspection Report 2021 FOF (IP92707) IR 05000280/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for Surry Power Station, Units 1 and 2 (05000280/2021005 and 05000281/2021005) IR 05000280/20210012021-08-26026 August 2021 Updated Inspection Plan for Surry Power Station, Units 1 and 2 -(05000280/2021001 and 05000281/2021001) IR 05000280/20210102021-08-16016 August 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000280/2021010 and 05000281/2021010 IR 05000280/20210022021-08-12012 August 2021 Integrated Inspection Report 05000280/2021002 and 05000281/2021002 IR 05000280/20214022021-06-14014 June 2021 Security Baseline Inspection Report 05000280/2021402, 05000281/2021402 and 07200002/2021401 ML21120A1552021-04-30030 April 2021 Integrated Inspection Report 05000280/2021001 and 05000281/2021001 IR 05000280/20200062021-03-0303 March 2021 Annual Assessment Letter for Surry Power Station, Units 1 and 2 NRC Inspection Reports 05000280/2020006 and 05000281/2020006 IR 05000280/20214012021-02-0909 February 2021 Security Baseline Inspection Report 05000280/2021401 and 05000281/2021401 IR 05000280/20200042021-02-0202 February 2021 Integrated Inspection 05000280/2020004 and 05000281/2020004; and 07200055/2020003 IR 05000281/20200402020-12-30030 December 2020 95001 Supplemental Inspection Supplemental Report 05000281/2020040 2024-08-26
[Table view] |
Text
ML19225C358 From: Pursley, William To: Barry Garber; Lee Ragland; william.terry@dom.com Cc: Diaz, Jose; Kellner, Bob; Bonser, Brian
Subject:
Surry Public Radiation Safety Baseline Inspection 2019003 Document Request Date: Friday, August 02, 2019 6:04:00 PM Attachments: SUR EB3R 2019003 Doc Req.doc.pdf Barry/Lee/Bill Attached is the information request for the upcoming Surry RP Public Baseline Inspection beginning September 16, 2019. In addition to myself, Jose Diaz is the other inspector.
Please let me know that you received this request via phone or email. Also, if you have any questions or need clarification on any of the information requested, do not hesitate to contact me.
We have recently learned that if the information is put into one large Zip file on Certrec, we can access and download all the files using Certrec fairly easily. If you have any questions, give me a call.
- Regards, Bill William Pursley USNRC RII Health Physicist 404 997-4517
Surry Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2019003 During the week of September 16, 2019, the Nuclear Regulatory Commission (NRC) will perform the baseline Radiation Safety Inspection at the Surry Nuclear Plant (NRC inspection procedures 71124.06, 71124.07 and 71151 Public Cornerstone only).
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that the documents are up-to-date and complete, thereby minimizing the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 9, 2019.
If there are any questions about this inspection or the material requested, please contact the lead inspector, William Pursley, at (404) 997-4517, or the Engineering Branch 3 Chief, Brian Bonser at (404) 997-4653.
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Inspection Dates: September 16-20, 2019 Documents Due to Region II by: September 9, 2019 Inspection Procedures: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71151 Performance Indicator Verification Lead Inspector: William (Bill) Pursley Health Physicist US NRC Region II (404) 997-4517 Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. Inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized response leads to a less efficient inspection and places additional burden on licensee staff. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Miscellaneous
- 1. Schedule of routine effluent and REMP sampling activities (e.g., stacks sampled on Monday, REMP run Tuesday).
- 2. Plant, Chemistry, and Radiation Protection organizational charts, including personnel involved in effluent sampling and reporting, Radiological Environmental Monitoring Program (REMP) sampling and reporting.
- 3. Current version/revision of Offsite Dose Calculation Manual (ODCM) including a list of changes made in the latest revision.
- 4. Annual Radiological Environmental Operating Reports (AREOR) for calendar years (CY) 2017 and 2018.
- 5. The most current Land Use Census and with list of changes to the prior Land Use Census.
- 6. Annual Radiological Effluent Release Reports (ARERR) documents for CY 2017 and 2018.
- 7. Current 10 CFR Part 61 Analysis Results for dry active waste (DAW) and primary resin.
- 8. Audits and self-assessments performed since August 31, 2017 that encompass the areas of (1) radiological effluents; and (2) radiological environmental monitoring, to include the meteorological tower.
- 9. Corrective Action Program procedures 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Last inspected: September 2017
- 1. Procedures for gaseous and liquid effluents to include collection, analysis, release, alarm setpoints, dose evaluations, and QC for counting instrumentation
- 2. List of changes made to radioactive effluent processing/discharge systems since August 31, 2017.
- 3. List of out of service (OOS) effluent monitors and duration Since August 31, 2017
- 4. Results of the last two surveillances/tests of the Radwaste Facility and the Process Vent Subsystem ventilation systems, including system flow monitoring instrumentation calibrations, HEPA filter testing, and charcoal filter tests.
- 5. The last two calibration records for the following effluent monitors:
a) RF Liquid Waste Disposal Radiation Monitor b) C.W. Discharge Tunnel Radiation Monitor c) U1 Process Vent Normal Range d) U2 Vent Vent Normal Range e) U1 Vent Vent High Range f) U2 Process Vent High Range.
- 6. Documentation for the radioactive sources used to calibrate the instruments in item 5 above
- 7. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges August 31, 2017
- 8. The last two Inter-laboratory comparison program results (for onsite count lab)
- 9. List of CRs generated since August 31, 2017, as a result of gaseous and liquid effluent processing and/or ODCM related activities. This should be a list of corrective action documents containing a CR number and brief description, not full CRs 71124.07 - Radiological Environment Monitoring Program (REMP)
Last inspected: September 2017
- 1. Procedures for radiological environmental monitoring including but not limited to:
a) Collection, preparation and analysis of all environmental samples b) Calibration and maintenance of REMP air and/or water samplers c) Calibration of meteorological monitoring instruments d) Periodic meteorological instrumentation surveillance requirements e) Calibration and quality control of sample counting instruments
- 2. Procedures associated with NEI/industry groundwater protection initiative
- 3. Last two calibration records for REMP air and water sampling equipment
- 4. Last two calibration records for meteorological monitoring instrumentation on the primary tower (wind speed & direction, and air temperature)
- 5. Data recovery report for meteorological monitoring instruments August 1, 2017.
- 6. Most recent inter-laboratory comparison program results and/or laboratory quality assurance certification if a vendor laboratory is used to analyze REMP samples.
- 7. List of systems, structures and components identified as credible mechanisms for the potential release of licensed material to the groundwater (e.g. SSC risk ranking matrix)
- 8. List of any non-radioactive system that has become contaminated August 1, 2017
- 9. Summary of any leaks and/or spills that have occurred Since August 1, 2017 (a copy of 10.75g file)
- 10. Copies of any reports to the NRC regarding abnormal onsite spills/leaks or radioactive material since August 1, 2017
- 11. Groundwater monitoring results since August 1, 2017
- 12. Environmental TLD results Since August 1, 2017
- 13. List of onsite surface water bodies (e.g. ponds, retention basins, lakes) that contain or can potentially contain radioactivity
- 14. Most recent audit/self-assessments of REMP activities including vendor activities
- 15. List of all CAP documents related to REMP activities or groundwater, including leaks or spills since August 1, 2017.
71151 - Performance Indicator Verification (Public Cornerstone)
Last inspected: October 2018
- 1. Procedure(s) for gathering and reporting PI data
- 2. List of all CRs related to effluent dose/ODCM issues since October 1, 2018. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
Onsite Assistance During Inspection
- Plant walk-downs of effluent radiation monitoring systems
- Walk down of the filtered ventilation system whose test results were requested.
- Observation (if available) of routine processing and discharge of radioactive gaseous effluent (including sample collection and analysis).
- Observation of any environmental sample collections during the week of the inspection.
- Walkdown (if needed) of ground water monitoring well locations and/or structures, systems, or components (SSCs) identified in by the sites GWPI.
Inspector Contact Information: Mailing Address William Pursley US Nuclear Regulatory Commission, (404) 997-4517 Region II William.Pursley@nrc.gov ATTN: William Pursley 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303