ML19225C180
| ML19225C180 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/19/1979 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML19225C182 | List: |
| References | |
| NUDOCS 7907260632 | |
| Download: ML19225C180 (1) | |
Text
.
s PHILADELPHI A ELECTRIC COM PANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 (215)341-4000 July 19, 1979 Director of Licensing U. S. Nuclear Regul.atory Commis ~ ion Washington, D. C.
20545
Dear Sir:
Attached please find the Peach Bottom Atomic Power Station Decommissioned Unit Number 1 Annual Report.
The report is in compliance with the Technical Specifications 8.2.4. (a).
8.2.4 Reports (a)
An annual report shall be submitted to the Director of Licensing, U.S. Atomic Energy Commission, Washington, D.C. 20545, describing the results of facility radiation surveys, the performance of security and surveillance measures.
This report shall be included as a section of tir annual report submitted for Units 2 and 3.
Sincerely yours,
'[
/
/
W. M. Alden Engineer-In-Charge Nuclear Section Generation Division - Nuclear WMA:vmc Attachment s
T D
790T260631 413 287