T 4
. j# "%g UNITED STATES f.
8*.
NUCLEAR REGULATORY COMMISSION f
799 Roo EVE ROAD k
5,
,w GLEN E LLY N, ILLINotS 60137 j
July 10, 1979 State of Illinois Department of Public Health ATTN:
Mr. Gary N. Wright, Chief Division of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The attached IE Information Notice No. 79-18 titled " Skylab Reentry" was sent to the following Operating Reactors on July 6,1979, and to the Research and Test Reactors on July 9,1979, for information.
OPERATING REACTORS American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)
Commonwealth Edison Company Dresden 1, 2, 3 (50-10, 50-237, 50-249)
Quad-Citi i 1, 2 (50-254, 50-265)
Zion 1,*4 (50-295, 50-304)
Consumers Power Company Big Rock Point (50-155)
Palisades (50-255)
Dairyland Power Company LACB4R (50-409)
Iowa Electric Light and Power Company Duane Arnold (50-331)
Northern States Power Company Monticello (50-263)
Prairie Island 1, 2 (50-282, 50-306) kisconsin Electric Power Company Kewaunee (50-266)
Wisconsin Public Service Corporation Point Beach 1, 2 (50-266, 50-301)
)
gg0 q
f r. c]
pJ J G r,
State of Illinois July 10, 1979 RESEARCH AND TEST REACTORS Dow Chemical Company (50-264)
University of Illinois Triga (50-151)
Lopra (50-356)
Iowa State University (50-116)
M.ichigan State University (50-294)
Uaiversity of Michigan (50-2)
University of Missouri Columbia (50-186)
Curators of the University of Missouri Rolla (50-123)
Ohio State University (50-150)
Purdue University (50-182)
Westinghouse Nuclear Training Reactor Zion (50-87)
University of Wisconsin (50-156)
Sincerely, Helen Pappas, Chief Administrative 3 ranch
Enclosure:
IE Information Notice No. 79-18 cc w/ encl:
Central Files Reproduction Unit NRC 20b Local PDR NSIC TIC Mr. D. W. Kane, Sargent and Lundy RatD~7 i1 % P' 409 039
U.S. NUCLEAR REGULATORY COMMISSION OFtICE OF INSPECTION AND ENFORCEMENT
- FEGION III July 6, 1979 IE Information Notice No. 79-18 SKTLAB REESTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a bit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in comunication with the Department of Energy (DOE), and vill receive notification frem them as soon as the reentry corridor can be established. This notification may occur <1 thin 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their f acilities. No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific lienesee actions. If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written responst to this infor=ation notice is required.
7%U20U 7 409 00
IE Infor=ation Notice No. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE INTORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Atte=pted Extortion -
2/2/79 All Puel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of I= proper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping keactor OL or CP
~ 79-07 Rupture of Radvaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Conteninated Syste=s with facilities with an Service Air Syste=s Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problem O'
and cps 409 0 ;i
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subj ect Date Issued To Notice No.
Issued i
79-12 Attempted Damag'e to rev 5/11/79 All Fuel Facilities Fuel Assemolies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Lov Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Syste=s Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate
[;. C 9 0 '. 'c
- w.-
wa w-e.eg.-
w..=-
, =. - -
--,