ML19225B382

From kanterella
Jump to navigation Jump to search
Responds to NRC 780823 Ltr Re Violations Noted in IE Insp Repts 50-277/78-17 & 50-278/78-21.Provides Updated Schedule for Const Work
ML19225B382
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/11/1979
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Crocker H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19225B381 List:
References
NUDOCS 7907250093
Download: ML19225B382 (2)


Text

e PHILAD ELPHI A ELECTRIC COM PANY 2301 M ARKET STREET P O BOX 8699 PHILADELPHI A. PA 19101 smetos t catracrr ( 2151 8 41 5 CC t

<N a == a s. ca .7 r : .. ::u c t c.,

April 11, 1979 Re: Docket Nos. 50-277 50-273 Mr. Hilbert W. Crocker, Acting Chief Fuel Facility and Materials Safety 3 ranch U. S. Nuclear Re gu la t o ry Cocmission Region I 031 Park Avenue King of Prussia, PA 19406

Dear Mr. Crocker:

Reference' . Letter from Philadelphia Electric Company :o H. W. Crocker dated August 23, 1978 The above referenced letter in response to IE Inspection

o s . 50-277/76-17 and 50-27a/73-21 trcasmitted among ather things a proposed work schedule-for the new ?each 3otton Sew.ge Treatment Plant. The original correspondence forwaravd a preliminary schedule which estimated that construction would be completed in the Summer of 1979. More accurate and complete information is now available iraa ahich the following work schedule has been developed

A. Preliminary design - complete B. Final Design

1. Mechanica. and civil - complete
2. Electrical - August, 1979 C. Begin constru: tion - June, 1979 D. Coaplete construction - January, 1930 E. Plant in service - March, 1980 b/ -

tbbu s0091

@b

, s Mr. Hilbert W. Crocker Page 2 Should you require any further information or desire r. o discuss this further, please f e e .1 free to contact me.

Very t ru ly y ou rs ,

['

./,/ . -