ML19225B251

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-022/03L-0,79-024/03L-0 & 79-027/03L-0
ML19225B251
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/19/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19225B252 List:
References
NUDOCS 7907240359
Download: ML19225B251 (1)


Text

-

e . . . . ,

. . e.

4 L A uc .a "

Alabama Power ce,s wxm w ;smem July 19, 1979 Docket No. 50-348 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgfa 30303

Dear .r:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Reports Nos.

LER 79-022/03L-0, LER 79- 024/03L-0, and LER 79-027/03L-0 are forwarded

.. herewith, with three (3) copies each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) day written notification of the occurrences.

LER 79-027/03L-0 is being submitted late due to the inadvertent routing of the incident report and LCO status sheet to an individual not responsible for LER preparation. To prevent late submittels, LCO status sheets are now routed directly tc the individual responsible for preparation of LER's.

If you have any questions, please advise.

Yours very truly, a

,- ')

, y q:Y  ! . n ,f F. L.'Clayton,',Jr. -'

FLCJr/TNE:bhj Enclosures cc: Director, IE (30 copies)/

Director, MIPC (3 copies) 368 175

@qf 9

  • 1 si 79072403 59