Responds to NRC 790524 Ltr Re Violations Noted in IE Insp Repts 50-424/79-08 & 50-425/79-08.Corrective Actions: Nonconformance Repts & Stop Action Orders Issued Re Backfill Operations.Full Compliance Expected by 790716
ML19225B192
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/15/1979
From: Staffar R
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19225B191 List:
References
X7BG10, NUDOCS 7907240269
Download: ML19225B192 (2)


Text

I- u- ,

aP' Co m / 'i e4 ,-co g..

,- . 8 -

r- t o" rc e

.:m g.

Tc L

Power Supply Eng;r.eering and Services j { f j l } Pdl dh k C Yd POWCf June 15, 1979 United States Nuclear Regulatory Camission Directorate of Insoection and Enforcement Region II

REFERENCE:

101 Marietta Street, N. W. IE: II: WBS Atlanta, Georgia 30303 50-424/79-08 50-425/79-03 Mr. C. E. Murphy File: X7BG10 Attn:

Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report number 50-424/79-08 ar' 50-425/79-08.

Nonconformance Reports have been issue 1 identifying the areas of concern.

A stop work order has been written for Category I backfill operations until resolution of these problems are reached.

The Georgia Power Company's field testing personnel are presently testing for moisture using the " pan dry" and the " oven dry" methods. The results of these tests will be reviewed for correlation and will be presented to the Bechtel Power Corporation soils engineers. Field testing personnel have received additional instructions in the requirements for documenting all test results.

The fill material placed on March 12, 1979 has been removed and acceptable material placed with appropriate testirg accomplished and docurented. 4 Fill Failure Notice was not writter fy donsity tests nos. 1217 and 1219 because the tests were in compliance with the specification requirenents. Specifications X2AP01 paragrapn C2.2.7.C.1, and X2AB01 paragraph 6.3.A state:

"The Category I backfill shall be compacted to an average of 97 pert.ent of the maximum dry density with not more than 10 percent of th? tests below 95 percent and no test below 93 percent

. . The aerage compaction shall be evaluated for each set of twenty field dersity tests made af ter placement in any area in which fill is placed."

415 183 7 9 0 7 2 4 0K C'[

4 -

United States Nr ;1 ear Regulatory Comission Attn: Mr. C. E. Murphy June 15, 1979 Page Two This documentation is available on site.

Full compliance is expected by July 16, 1979.

The inforration contained in the inspection report is not considered to be proprietary.

Very truly ecurs, p

m ,

/* 1. ,l/ql,lc-(t

/R. W. Y affe I,

/

i CWH/aaw Attachment xc: M. D. Hunt, NRC - Region 11 J. H. Miller, Jr.

W. E. Ehrensperger F. G. Mi tchell, Jr.

C. F. Whitrer R. J. Kelly D. E. Dutton R. W. Staffa C. W. Hayes W. M. Johnston, Jr.

C. R. Miles, Jr.

D. L. McCrary R. A. Thorras J. A. Ba'lef J. L. Leamon H. A. Sindt B. L. Lex K M. Gillespie 415 184