ML19225B149
| ML19225B149 | |
| Person / Time | |
|---|---|
| Site: | 05000433 |
| Issue date: | 07/06/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Kroes R CALIFORNIA, UNIV. OF, SANTA BARBARA, CA |
| References | |
| NUDOCS 7907230769 | |
| Download: ML19225B149 (1) | |
Text
ggR REC (,g gf Ig UNITED STATES C
y yg._ (p}',g NUCLE AR REGULATORY CO L11SSION r,,.faj.'M/
j HEGION V i
S f46 if4 / g 1000 N. CALIFORNI A BOULEVARD
's /
d SUIT E 202, WALNUT CR E E K PLAZA
+,,,*
WALNUT CREEK, CALIFORNI A 94506 Ji'ly 6, 1979 Docket ?!a. 50-433 Regents of the University of California c/o University of California, Santa Barbara Santa Barbara, Ca' fornia 93106 Attention:
R. J. Kroes Associate Vice Chancellor Gentlemen:
This Information Motice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the infcrma-tion for possible applicability to their facilities.
?!o specific action or response is requested at this time.
If you have questions regarding this mai.ter, please contact the Director of the appropriate t'RC Regional Office.
Sincerely, f_i($
' s. _
7; R. H. Engelken Director
Enclosure:
IE Information flotice No. 79-18 415 013 voonso M
UNITED STATES fluCLEAR REGULATORY COMMISSION OFFICE OF IflSPECTION A?iD ENFORCEMEilT WASHIf;GTON, D.C.
20555 July 6, 1979 IE Information Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14,1979, with July 12, as the most prob &ble date.
Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in corrounication with the Departrrent of Energy (DOE), and will receive notification frcn them as soon as the reentry corr 1 dor can be established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Infornation i;otice is provided as an early notification of a possibly significant ratter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities. fio specific action or response is requested at this time.
If further fiRC evaluations so indicate, an IE Circular or Bulletin wi:1 be issued to recomnend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate f;PC Psegional Office.
fio written response to this information notice is required.
Enclosure:
List of IE Information flotices Issued in 1979 415 014 79071 20387
IE Information llotice flo. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE IfiFORftATION fl0TICES ISSUED Ill 1979 Information Subject Date Issued To Notice t'o.
Issued 79-01 Bergen-Paterson Hydraulic 2/P/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Linitcr;ue Valve Geared 2/9/79 All power reactor Liait Switch Lubricant facilities with an OL or a CP 79-04 Degradaticn of 2/16/79 All power reactor Engineered facilities with an Safet:i Features OL or a CP 79-05 Use of Inproper ftaterials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactar facilities with an OL or CP 79-08 Interconnection of 3/28/i9 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaninated Resin facilities with an OL 79-10 flonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problen OLs and cps 415 015
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INF0P3ATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and JPs 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Ols 79-17 Source Holder Assembly Darage 6/20/79 All Holders of Reactor Canage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 415 J16