Text
[q >R REi,y'o UNITED STATES
!{
8Y. n NUCLEAR REGULATORY COMMISSION l.
REGION V
[il /_ ddi) [ O 19f 0 N. CALIFORNI A BOULEVARD O
t 'd SUIT E 202. WALNUT CRE E K PLAZ A o
WALNUT CR E E K, CALIF ORNI A 94596 July 6,1979 Docket fio. 50-142 University of California at Los Angeles Los Angeles, California 90024 Attention: Harold Brown Campus Safety Officer Gentlemen:
This Information t;otice is provided as an early notification of a possibly significant matter.
It is expected. hat recipients will review the informa-tion for possibm applicability to their facilities.
I!o specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate i;RC Regional Office.
Sincerely, 1: U ; > ~.
l F,. H. Engelken Director
Enclosure:
IE Information flotice fio. 79-18 415 009 gB0ne.0766
UNITED STATES
?!UCLEAR REGULATORY C0f' MISSION OFFICE OF If;SpECTION AND EflFORCEf1ENT WASHIf;GTON,
D.C.
20555 July 6, 1979 IE Information flotice No. 79-18 SKYLAB REENTRY Description
.f Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14,1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in cccmunication with the Department of Energy (DOE), and will receive notification from then as soon as the reentry corridor can te established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a roSSibly significant matter.
It is expected that recipients will review the inic....i:-
tion for possible applicability to their facilities, flo specific action or response is requested at this time.
If further flRC evaluations so indicate, an IE Circular or Bulletin will be issued to recomnend or request specific licnesee actions.
If you have questmns regarding the matter, please contact the Director of the appropriate NRC Regional Office.
f!o written response to this information notice is required.
Enclosure:
List of IE Information fictices Issued in 1979 415 010 7907120387
IE Information flotice f!o. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTIfiG OF IE INFORMATION NOTICES ISSUED Ill 1979 Information Subject Date Issued To flotice fio.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities low Enriched Uranica 79-03 Linitortue Valve Geared 2/9/79 All power reactor Linit Saitch Lubricant facilities with an OL or a CP 79-04 Decradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Improper ?'aterials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-05 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insuh tien Support Problen OLs and cps 415 011
IE Information t'otice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To f;otice.10.
Issued 79-12 Attempted Damage to f!ew 5/11/79 All Fuel Facilities Fuel Assenblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low tlater 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 fiRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Ceficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-17 Source Holder Assembly Dcnage 6/20/79
'll Holders of Reactor Damage From Misfit Between vLs and cps Assembly and Reactor Upper Grid Plate 415 012