pu n ce,,

-'[(

.?

o UNITED sT ATES

/

[jgm(9' NUCLEAR REGULATORY COMMISSION 0,.,y3Q,' k' 3 nEGION V 3 jdpl.A 'f 1990 N. C ALIFORNI A COULEVARD C

d' SUITE 202, WALNUT CnEE K PLAZA r

+.,,*

WALNUT CD ".E K. CALIFORNI A 945")6 JUL 6... d Docket flo. 50-228 Aerotest Operations, Inc.

3455 Fostoria Way San Ramon, California 94583 Attention:

R. L. Newacheck President Gentlemen:

This Information flotice is provide as an e.

" notification of a possibly significant matter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities.

fio specific action or response is requested at this time.

If you have questions regarding this natter, please contact the Director of the appropriate flRC Regional Office.

Sincerely, lll( j., c Cl-R. H. Engelken Director

Enclosure:

IE Information flotice flo. 79-18

} /( /-

7 r. Q JJ 79072307FI

UNITED STATES NUCLEAR REGULATORY CCMMISSI0f!

OFFICE OF INSPECTIO.'l AND EfiFORCEllENT WASHINGTON, D.C.

20555 July 6, 1979 IE Information Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:

The most recent dates for reentry of Skylab are July 10 to 14,1979, with July 12, as the most probable date.

Recognizing that a hit on a nuclear power olant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an tvent should actually occur.

The fiRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established. This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.

If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.

This Information Notice is provided as an early notification of a possibly significant ratter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities.

No specific action or response is requested at this tin'e.

If further flRC evaluations so indicate, an IE Circular or Bulletin will be issued to recomnend or request specific licnesee actions.

If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office, fio written response to this iniormation notice is required.

Enclosure:

List of IE Information Notices Issued in 1979 N-m yt 79071 20387

IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE IfiFORMATION NOTICES ISSUED Ifl 1979 Information Subject Date Issued To Notice No.

Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -

2/2/79 All Fuel Facilit Low Enriched Uranium 79-03 Linitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradaticn of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Improper flaterials 3/21/79 All power reactor in Safety-Related Ccrponents facilities with an OL or CP 79-05 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Raduaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactive 1.y 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 flonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problen OLs and cps 7

3

a IE Information Notice t!o. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE IflF0PMATION liOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.

Issued 79-12 Attemoted Damage to flew 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Re&ctors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek Ols and CPr Reactor 79-14 f;RC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Def;cient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 t!uclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage Fron Misfit Between OLs and CDs Assembly and Reactor Upper Grid Plate

)