ML19225B065

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info to Complete Review of QA Program
ML19225B065
Person / Time
Site: 07100236
Issue date: 07/05/1979
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Anderson C
AMERICAN AIRLINES, INC.
References
NUDOCS 7907230469
Download: ML19225B065 (2)


Text

.L~

phE pm arco

'g UNITED :,TATEs e

E i

NUCLEAR REGULATORY COMMISSION

,'g

.: C WASHINGTON. D. C. 20555 S

\\..... * 'S JU!. 0 5 ;979 FCTR: RHO 71-0226 American Airlines ATTN: ft. Charles P., Anderson 3900 North Mingo Road Tulsa, OK 74 iS1 Gentlemen:

This refers to your application dated December 21, 1978 requesting approval of your Quality Assurance (CA) program as meeting the QA program requirements of 10 CFR 9/1.51.

In connection with our review, we need the information identified in the enclosure to this letter.

Please submit seven copies of your response to the enclosed request for additional information within 30 days following receipt of this letter.

If you have any questions regarding this request, please contact Pr. Jack Spraul at (301) 492-7741.

Sincerely,

--k

-f.ap Charles E. MacDonald, Chief Transportation Eranch Division of Fuel Cycle and Material Safety, NMSS Enclosure :

Request for Additional Information 412 55a

-u OO 23nfifc?

(

I AMERICAN AIRLINES (71-0236)

Request for Additional Information I

1.

Please provide a s+.atement which shows that the American Airlines Maintenance and Engineering c nter recognizes that the final responsibility for the quality assurance program for 10 CFR Part 71 requirements rests with the center.

2.

In part D, indicate who (by title) is responsible to assure that all radioactive material shipping packages are designed and manufactured under a QA Program approved by Nuclear Regulatory Commission for all packages designed or fabricated after the effective date of the QA Program.

This is often the responsibility of the Radiation Safety Officer, and it can be satisfied by receiving a proper certification from the manufacturer.

3.

In part G, indicate who (by position title) is responsible to ensure that regulatory required inspections and tests are performed by the radiographers.

4.

In part I, nrovide a statement that auditors have no responsibility in the activities they audit.

r x

L 9

It

-