Responds to NRC 790406 Ltr Re Violations Noted in IE Insp Repts 50-352/79-02 & 50-353/79-02.Corrective Actions: Abandoned & Replacement Holes Filled W/Dry Mortar & Replaced by Another Hole
ML19225B029
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/13/1979
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19225B025 List:
References
790503, NUDOCS 7907230348
Download: ML19225B029 (3)


Text

s * .

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHI A. PA.19101 V.s.BOYER vtCE-PRES. DENT Mr. Boyce Grier, Director MAY - 01979 United States Nucler.r Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406 Subj ect : rJ S NRC IE Region I Letter dated April 6. 1979 RE: Site and Office Inspection of February 20-23, 1979 Inspection Report No. 50-352/79-02 & 50-353/79-02 Limerick Generating Station - Units 1 & 2 File: OUAL 1-2-2 (352/79-02 and 353/79-02)

Dear Mr. Grier:

In response to the subject letter regarding items identified during the subj ect inspection of construction activities authorized by NRC License Nos. CPPR-106 and -107, we transmit herewith the following:

Attachment I - Response to Appendix A Should you have any questions concerning these items, we would be pleased to discuss them with you.

Sincerely, n , j /'

f ' j a,?9)) 'm V. S. Boyer' 29ennD3'513 060

Attachment I Resconse to Accendix A Item of Noncomoliance I Infraction Appendix B of 10CFR50, Criterion V, states, in part: " Activities affecting quality. . . shall be accomplished in accordance with these instructions, procedures or drawings."

The Limerick PSAR, Appendix D, Quality Assurance Program, Paragraph D.6.4, states, in part: "Bechtel Construction Department. . . is responsible for construction of the plant to approve engineering specifications, drawing and procedures..."

Bechtel Drawing C-603, Revision 26, Note 10, describes the requirements for replacement anchor holes, as follows:

" Abandoned holes requiring replacecent shall be filled with Dry-Pack ortar of a strength equal to or greater than the drilled member. New holes shall be drilled no closer than one hole diameter, measured center to center from the filled hole, after the mortar has reached the strength of the original concrete."

Contrary to the above, on February 20, 1979, the craftscan was drilling a replacement hole for an anchor bolt in the RER room "A" which was less than one hole diameter away from the abandoned hole and also the abandoned hole was not filled with mortar.

Pesconse to Infraction The abandancd und replacement holes identified by the item of noncompliance hate been filled with dry pack mortar and replaced by another hole an accordance with the requirements of drawing C-603, Note 10.

Corrective steps Laken and being taken to avoid further items of noncompliance. are:

1. Verbal instruction of supervisory personnel to inform crafts personnel of the requirements of Note 10 and to inspect to ensure that the requirements are followed.
2. Issuance of a memorandum by the Project Field Engineer to Field Supervision and Engineering to reiterate item (1) above.

413 061 1-, /2 50-352/79-02 50-353/79-02

5 3 Job Rule G-28 for " Installation of Expansion Anchors and Grouted in Threaded Rods" will be revised to reference Note 10. This revision will be complete by May 7, 1979 Item of Noncomoliance II Infraction Appendix B of 10CFR50, Criterion V, states, in part: " Activities affecting quality. . . shall be accomplished in accordance with these inscructions, procedures or drawings."

The Limerick PSAR, Appendix D, Quality Assurance Program, Paragraph D.6.4, states, in p rt: "Bechtel Construction Department... is responsible for construction of the plant to approve engineering specifications, drawings and procedures..."

Bechtel Power Corporation Job Rule for Storage Maintenance of Fabricated Piping and In-Place Storage Maintenance of Small Manual Valves, Revision 14, Paragraph 4.2, states, in part: "Austenitic stainless steel pipe spools shall be laid down in locations not subject to rain, snow, sleet. . . shall be covered. . . and on dunnage.

Closed end caps with plastic bags and wood plugs. . . shall remain in place and only be removed while work is in progress..."

Contrary to the above, on February 21, 1979, stainless steel pipe spools DCA-105-1-2 and DCA-105-1-4 were observed uncovered and uncapped in the "H" out door laydown area.

Resconse to Infraction Stainless steel pipe spools DCA-105-1-2 and DCA-105-1 4 have been v apped with polyethylene with end caps and transferred indoors.

Corrective steps taken and being taken to avoid further items of noncompliance are:

1. All personnel have been verbally re-informed of the proper storage conditions of stainless steel pipe spools.
2. A complete survey of the laydown area is in progress and corrective action is being taken as necessary to insure proper storage of all stainless steel pipe.

Full compliance will be achieved by June 1, 1979 I-2/2 50-352/79-02 4I3 062 5 -353/79-C2